You are on page 1of 10

 

 
BRSM 
  Systems:  QMS ISO 9001 (2008)  

 
AssessmentReport/Checklist 
Form 009 

 
CLIENT‐ORGANIZATION (NAME):    RAH PEY TARH 

PHYSICAL LOCATION(s):   Unit No.10, Building No.2212, Vali‐e‐Asr St., Tehran, 
Iran 
 
Phase II Audit Date(s):    24, 25 May 2015 
Phase I Audit Date(s):    12 May 2015 

NAICS (or NACE) CODE 71 

ISO 9001 EXCLUSIONS:    Section 7.5.2, is excluded


 
 
Assessment objectives: Attesting requirements of QMS system has been met 
in client’s management system 
 
 
ASSESSMENT TEAM INFORMATION 
Assessment Team Leader, ATL Vahid Salahi 
Assessor 2  
Assessor 3  
Assessor 4
Assessor 5
Assessor 6
 
 
 
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to 
1  follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to 
the processes being capable of achieving desired outputs (including consumer’s well‐being). 
Project Management ;Providing Combination of Services in Civil Projects including Technical and 
2  Scope of activities 
Consulting Services,  

BRSM requires that the organization’s legal obligations and regulatory 
3  Legal status 
are met as part of granting certification. 
 
4   
General   
Requirements –  the organization has identified its processes and strated implementing
4.1  What is the  QMS 4 Month ago,
implementation / 
transition date? 
 
Documentation 
The organization has developed the Quality Policy and Quality Manual.
4.2  Requirements 
(RPT-QM-00) and other required documented procedures
(includes records) 

explicitpolicy and Quality objectives shows that organizing is moving   
toward its policy ,strategic plans and management strategic system 
4.2.2  Quality Manual an explicit (and controlled) Quality Manual has been provided 
the interaction of processes observed in Manual 
 
 
 Documents were coded in accordance with Document control 
procedure (RPT‐PR01) The method of approval documentsis defined. 
Control of 
4.2.3  The Documents and records were kept in electronic format. Documents 
Documents 
list (code RPT‐F01‐PR01),Distribution of copies of the documents 
specified in the Documents list. 

Recordswere coded in accordance with records control procedure (RPT‐ AR 
PR01) table of records keeping (RPT-F02-PR01) is completed.and 
records were kept in electronic formatAlways have a backup plan.  RPT‐PR01
Control of 
4.2.4  Method of producing  backup copies of project files related to Entrance 
Records  
road design Jey Industrial Zone, Isfahan Project was not in accordance 
with control Records procedure 
 
5  Management responsibilities

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 2 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Qulaiy policy (rpt-QP-00) is defined ,the general policies are increasing


market share, enhance staff knowledge, increase customer satisfaction,
Management  commitment to contractual and legal requirements.Staff have knowledge
5.1 
Commitment  of policy and customer requirements as a mean to determine effectiveness 
in the development and implementation of QMS

Customer  Focus  – 
5.2  (may  relate  to  relate to 7.2.1 and 8.2.1  
7.2.1 and 8.2.1) 

Policy is appropriate to the nature of the activities and purpose of the 
organization, the policy implies to commit to customer requirements 
and continuous improvement, the objectives is reviewed annually, staff 
has understood the policy. 
5.3  Quality Policy  Quality policy (RPT‐QP‐00such as increasingmarket share, enhancing  
staff knowledge, increasing customer satisfaction, commitment to 
contractual and legal requirements were observed. It is considered that 
the policy be reviewed annually, Mr. Merad as sample was asked about 
the policy , the policy has been conveyed to staff by management 
Quality objectives( RPT‐TO‐00 )with operational programs were 
Planning;5.4.1 
observed, such as expanding the company's activities in the new 
Quality 
provinces markets (at least 5 provinces), improving basic technical 
Objectives/5.4.2 
5.4 
quality 
competence, professional seminars (at least 4 seminars per year),  
making markets in neighboring countries (Iraq and 
management 
Afghanistan).objectives were measurable and include meeting 
system planning 
requirements of product. 

5.5  Responsibility, Authority

Organizational Chart with code RPT‐OC‐00was observed. RPT‐F02‐PR03 
job description for positions project control Manager , design manager, 
Responsibility, 
5.5.1 
Authority  
technical manager, observed(in Job description form RPT‐F02‐PR03).  
Qualifying Conditions, authorities and organizational infrastructure for 
each of the positions in this form are defined. 

Management  Mr Aram is Management Representative 
5.5.2 
Representative 

 understand his role to establish, implement, and maintain the QMs. 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 3 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Internal Internal communication is done by phone, e‐mail, letters and 
5.5.3 
Communication signboards. Correspondence is recorded. 

5.6  Management Review

In accordance with RPT‐PR2 They have conducted management review 
in 15 April 2015. All the inputs were discussed and all the main members 
5.6.1  General 
participated.  
 

Results of  internal audit , Customer feedback, corrective actions 
Status of process performance and product performance, preventive 
actions, Follow‐up action from previous reviews are reviewed in 
5.6.2  Review Inputs   

 
management review meeting  
 
 

Important outcomes of the meeting include a certified grade onein 
5.6.3  Review Output consulting, starting construction activities, provide a larger office to  
recruit more technical expert, 

6  Resource Management

Refer to 6.2 ,6.3,


6.1 
7.4 ,8.2.1 
6.2  Human Resources   

In accordance with the training procedure training ( RPT‐PR03), personal 
profile(code RPT‐F01‐PR03 )for management representative (Mr.Aram) 
was observed .training plan for 1394 was observed .10 training course 
6.2.1  General  for example ,strengthening concrete, AutoCAD software, MSP, advanced  
materials resistance  are provided. Based on 1394training plan advanced 
materials resistance course was held 94/01/20(April 2015).production 
supervisor score was 85%.Mr Aram score was 82%. 
 Records of effectiveness evaluation of advanced materials resistance 
Competence,  course held on 94/01/20 were checked .the effectiveness score for Mr. 
6.2.2  Awareness and  Aram was 80%.the effectiveness evaluation method is compatible with  
Training  courses. 
 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 4 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

physical location, workplace and utilities are adequate to processes 
6.3  Infrastructure 
 
   

Work  The environment of company is according to labor and social welfare 
6.4 
Environment   requirements for office was good.     

7  Product Realization 

Planning of product realization is done based on control project


management system.MSP and P6 programs are used for planning.
Planning of 
Records related to consultingin adding a lane to the Ahangaran_-
7.1  Product 
Arak road project were observed
   
Realization 
including Gantt chart of the project, monthly progress estimation
reports, quantity of the resources needed

7.2  Customer‐Related Processes 
7.2.1  Determination of  Following items are considered in each project.
Requirements 
Related to the  Customer specific requirements
Product   Requirements others not specified by the client (needed)
Regulatory requirements related to the product and its processes    
Records related to the Ahangaran_-Arak road project which
covered the above item such as specifying of construction
regulation and law of transportation office of Markazi province
were checked
After Determination of Requirements Related to the services, head
manager review service -related requirements, before committing to
provide, to ensure that…

Review of 
Knowing what are the product requirements
Requirements  Solving requirements differing from those expressed by the
7.2.2 
Related to the  organization    
Product   Can meet the defined requirements?
Records of contract review for Ahangaran_-Arak road project and
Reconstruction of Sabz stadium of Mashhad were observed
 
means for the organization communicating with the customer are as
Customer 
follows: Telephone calls, emails and letters, in such
7.2.3 
Communication  communications information regarding Product information is   
transferred and Customer responses, opinions, and/or comments is
registered and conveyed to operational staff 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 5 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

7.3  Design and Development 

The Design and Development Planning procedure (RPT-PR11)is


documentedto determine the step of design and
developmentwhich included verification and validation
,responsibilities and authorities, groups and functions
participative in D&D progression

To design, the company collects basic executive data from


employer, and sometimes it is needed to visit onsite to verify
Design and 
these data, such as surveying the roads, other data if not provided
7.3.1  Development 
by employer will be collected by asking from legal authorities
   
Planning 
such as the geology institute of the province the project will be
executed in them, or the route of the floods and probability of
typhoons or the place of faults.
On the day of assessment a site of Ahangaran Highway to Arak
was visited, the major activity by client as explained had been
surveying , at the day of assessment no activity was done by
auditee, the visit was to observe the site data preparation
procedure
Engineering and technical Regulations, national or international
7.3.2  D & D Inputs  requirements and regulation Data gathering(RPT‐F03‐W04) for     
construction of Rasht road to Fomanroad project was completed . 
Technical Plans and maps ,report of control protect which are
7.3.3  D & D Outputs 
relevant to service requirement
   

Out puts with minute form (RPT-F03-W05) are repotortedto


D & D 
7.3.4 
Reviewing 
employer for approval review. Approval form of construction of    
Rasht road to Fomanroad project was observed
Input And output data is compared. In case of compliance
7.3.5  Verification  validation is done by technical director, based on design input the    
output maps and plots are checked
In accordance , The Design and Development Planning procedure
(RPT-PR11) Validation is done through the simulation
software.Validation of construction of Rasht road to Fomanroad
7.3.6  validation  project is done and result were recorded if related forms such as    
RPT-F03-W06, it is also checked and controlled to validate
calculations according to Civil fundamental rules and national
regulations for road construction
In force and back correspondence with employer changes are
recorded and the primary design is modified according to
Control of (D & D) 
7.3.7 
Changes 
requirements by employer considering limits by regulation, if any    
changes occur the new and modified maps and plans are provided
in order to receive official approval from employer.

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 6 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

7.4  Purchasing 
Purchasing  In accordance with purchase and supplier evaluation RPT‐W03, request 
7.4.1 
Process 
  
records for color printer (94/12/05) and safety shoes (94/11/30)on 
Purchasing  march 2015 was observed. Purchased goods are checked base on 
7.4.2 
Information   defined criteria and scope.    

Acceptable supplier list contained 17 suppliers was observed 
Verification of 
7.4.3 
Purchases 
Records of primary evaluation(in form  RPT‐F03‐W03) of  
PaLizAfzari(score 72) ,Avazhang(score69),were observed 

7.5  Production and Service Provision 

The project control is done to control progress of each project. 
The progress records of Adding a lane to the Ahangaran_-Arak road
project were observed. such as

RPT-PR05 
Control of  , a first-phase approval from the employer on April 2015 (related
7.5.1  Production and  form, F / 931 128) monthly progress reports,The quantity of AR
Service Provision  resources consumption

In one case control project records for supervision of construction


ofRasth road to Fomanroad project is not complete 

Validation of 
Processes for 
7.5.2  excluded   
Production and 
Service Provision 
In accordance with document and records control procedure(RPT-F02-  
PR01)and project control procedure There is file(form RPT-F01-W06) as
master list which Indicates which document (technical map, client
Identification  and 
7.5.3  requirements, related standard and regulation )is related to one customer  
Traceability 
Each client is recognized by its name primarily and each document is
filed in the clients folder physically and the scanned copy electronically,
therefore the files are not missed and easily accessible
Customer 
All data which received from client or other organization are customer  
7.5.4  property which be kept in accordance external document and records  
Property 
control procedures
There is a small storage room for keeping spare parts for printers and  
Preservation of  computers and the items in the storage room are recorded in a note book
7.5.5   
Product  by administrator of the office. These storage items have no effect on
quality of services provided
Control of  According to the calibration instructions (RPT-W02), calibration records  
Monitoring and  of mapping camera with calibration certificate code OT-C-73865-LN on
7.6   
Measuring  October 2014 from the Civil adjustment and calibration company were
Devices  observed

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 7 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

8  Measurement, Analysis and Improvement 
8.1  General       
8.2  Monitoring and Measuring 
The average of customer satisfaction is 80% that in accordance with 
defined criteria is acceptable. 
According to customer feedback procedure (RPT‐PR10), records related 
to customers satisfaction (RPT‐F01‐PR10) was observed as the 
Department's survey for construction of second runway axis Qazvin 
Province Qazvin‐Takestan with a rating of 95%, the poll Department of 
Transportation Central Region 2 designed for project‐based bonding 
Ahngaran‐Farmahini with a rating of 93%, Arak, Tehran province 
Telecommunication boring bar with a rating of 87% restoration project. 
Customer 
8.2.1 
satisfaction 
It should be noted that if the duration of the project is long (design)this    
survey is done at intervals of 3 months. 
A complaint in the form RPT‐F02‐PR10 for end of  Hemmathighway to 
Chitgar lake project by the employer (District 22 of Tehran) was 
recorded, 
The complaint explained that design was not completed on‐
time(December 2013).Nonconformities  services Registration form (RPT‐
F01‐PR09 ) and records of corrective action was issued on the same day 
and the  re‐evaluation of customer satisfaction was conducted on 
January 2014 that a score of  satisfaction was 85% 
Internal  audit  in  accordance  with  internal  audit(  RPT‐PR08) procedures   
performed dated on 20 May 2015, The internal audit was conducted by 
a  representative  of  management  and  control  project  manager.  Audit 
program (form RPT‐F01‐PR08), checklist of internal audit with (form RPT‐
8.2.2  Internal Audits  F02‐PR08)  was  observed.  5  non‐conformities  detected  that  have  been   
recorded in the form of internal audit adjustments (RPT‐F03‐PR08). All of 
the  non‐conformities  were  related  tothe  incomplete  records  of  quality 
management  system,  such  as  supplier  evaluation.  Corrective  action 
forms  (RPT‐F01‐PR07)  were  observed.  All  Nonconformities  were 
resolved, and have been approved by the management. 
Monitoring and
According  to  Data  analysis  procedure  RPT‐PR12each  process  has  an   
indicator, and the process outcome is measured based on data collected 
8.2.3  Measurement  
annually and these data are compared with index of the process, 
Process
As example the satisfaction index is 80% and the process in within range
The technical department controls the designs and maps to have all   
Monitoring and required elements , such as the definition of symbols on the drawings, 
8.2.4  Measurement of the measurements explanations, and the maps engineering   
Product specifications based on design inputs and requirements by employer 
Records of such review observed for Qazvin‐Takestan project 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 8 of 10 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Control of Non-
Non‐conformity is defined as a problem that has not been foreseen in   
design and during the implementation this has raised up, or a 
8.3  Conforming  
constructed project fails due to design failure, no records of such failures 
Product
seen. 
The analysis of Data  is done based on data process table (RPT‐F01‐  
PR12). They used graph to demonstrate the result. Also the reports in 
detailed were attached to data analysis records. Examples of analysis  : 
8.4  Analysis of Data  customer satisfaction with a 80% score rated the effectiveness of 

 
training 92% and the achievement of the objectives 90%, deviation of 
project progress in projects at a rate of 6%. 
 

8.5  Improvement 

Continual 
8.5.1 
Improvement 
Rate of deviation of project designprogress is decreased from% 8 to 6%.    

Base on RPT-PR07 corrective and preventive action procedure


For all NCs from internal audit the corrective action has been considered 
and closed. Implementation of phase 3 in MSP Reports had not been 
produced. 
Non conformities form was completed and corrective action was done in 
8.5.2  Corrective Action  march 2015 and back up was produced in accordance with     
recordscontrol procedure. 
The training schedule Had not been developed appropriate. They had 
not addressed the some courses for the recent years, Non conformities 
form was completed and all courses were address in training plan. 
 
Corrective and preventive action procedure RPT-PR07 No record of
8.5.3  Preventive Action 
preventive action was available.    

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 9 of 10 
Strength Weakness

Number of staff in training department 
Application of paper‐less administration processes
Updating system related records 
 

action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:

action Request Type II Form-008 – as we indicate and that each of the AR addresses the basic four (4) questions
as seen in Form-008:

1-In one case control project records for supervision of construction of Rash road to fooman road is not complete  

2‐ Method of producing  backup copies of project files related to Entrance road design Jey Industrial Zone, Isfahan 
Project was not in accordance with control Records procedure 

Observation Form-018 – with uniquely specific identification:

ATL: VahidSalahi DATE: 26-May 2015

END of REPORT

FORM-014 – Opening Meeting Checklist FORM-009 – MS Reporting,


FORM-017 – Closing Meeting Checklist FORM-008 – RA / AR, as requires
FORM-005 – Participants of opening & closing meetings FORM-018 – OBS, as requires
FORM-004 – Assessment Plan FORM-010 – As requires, recommendation for CoR
FORM-007 – Planning onto -004, as process determined FORM-026 – Assessment documents check-sheet, optional

You might also like