You are on page 1of 5

Permits and Clearances 1

Project Billboard/ Sign Board 1


Occupational Safety and Health Program 1
Mobilization/ Demobilization 1
0 0
0 0
0 0
0 0
CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS 0
EARTHWORKS 0
Structure Excavation (Common Soil) 781.54
0 0
Structure Excavation (Solid Rock) 0
0 0
Removal of Structures and Obstructions 0
0 0
Structure Excavation (Solid Rock) 211
0 0
Embankment (From structure excavation) 480
0 0
Embankment from Borrow 40.8
0 0
Gravel Fill 73
0 0
0 0
0 0
PLAIN AND REINFORCED CONCRETE WORKS 0
Structural Concrete (Ready Mix, Class A, 28 days) 0
0 0
0 0
Structural Concrete (Footings and Slab on Fill) Class A, 28 days 193
0 0
Structural Concrete (Footing Tie Beams) Class A, 28 days 28
0 0
Structural Concrete (Columns) Class A, 28 days 80
0 0
Structural Concrete (Suspended Slab) Class A, 28 days 78
0 0
Structural Concrete (Beams/Girders) Class A, 28 days 84
0 0
Lean Concrete 15
0 0
Reinforcing Steel, Grade 40 88678.94
0 0
Forms and Falseworks 2281.43
0 0
Permanent Casing (Micro Piles, 0.20m Diameter) 0
0 0
0 0
0 0
FINISHING 0
0 0
Soil Poisoning 301.32
0 0
0 0
0 0
0 0
100 mm CHB Non Load Bearing Wall (including Reinforcing Steel) 304.47
0 0
150 mm CHB Non Load Bearing Wall (including Reinforcing Steel) 871.62
0 0
0 0
0 0
0 0
Wooden Doors and Windows 1
0 0
0 0
0 0
Jalousie Window (Glass) 57.72
0 0
Residential Casement Window 110.16
0 0
Steel Window 1
0 0
Locksets 0
0 0
Hinges 0
0 0
Carpentry and Joinery Works 1
0 0
Finishing Hardware 1
0 0
0 0
0 0
0 0
Cement Floor Finish with Floor Hardener 1005.52
0 0
Cement Plaster Finish 3231.9
0 0
38 mm dia. G.I. Pipe Railings 0
0 0
50 mm Ø G.I. Pipe Handrail Fully Welded on vertical Railing on 19 mm bar stiffener 0
0 0
Railings 1
0 0
Ceiling, Fiber Cement Board on Metal Frame (4.5 mm) 361.94
0 0
Reflective Insulation 447.67
0 0
Glazed Tiles and Trims 200.7
0 0
Unglazed Tiles 73.84
0 0
0 0
0 0
0 0
Painting Works (Masonry/Concrete) 3767.24
0 0
Painting Works (Wood) 204.06
0 0
Painting Works (Steel) 126.76
0 0
0 0
0 0
0 0
Prepainted Metal Sheets, Long Span, (Corrugated, above 0.427mm) 447.67
0 0
Fabricated Metal Roofing Accessory (Ridge/Hip Rolls, gauge 26) 28.25
0 0
Fabricated Metal Roofing Accessory (Flashing, gauge 26) 36.7
0 0
Fabricated Metal Roofing Accessory (Gutter, gauge 24) 66.45
0 0
Structural Steel, Trusses 5629.95
0 0
Structural Steel, Purlins 5723.12
0 0
Fascia Board, Fiber Cement Board (19mm) 93.41
0 0
Metal Structure Accessories, Steel Plates 242.32
0 0
Metal Structure Accessories, Sag Rods 169.62
0 0
Metal Structure Accessories, Cross Bracing 209.68
0 0
Metal Structure Accessories, Bolts 51.84
0 0
Metal Structure Accessories, Turn Buckle 28
0 0
Metal Structure Accessories, Fire Escape 0
0 0
0 0
0 0
0 0
0 0
PLUMBING/SANITARY WORKS 0
Sewer Line Works 1
0 0
Cold Water Line Works 1
0 0
Storm Drainage and Downspout 1
0 0
Plumbing Fixtures 1
0 0
Septic Vault "Type E" 0
0 0
Catch basin 16
0 0
Fire Protection System 0
0 0
Automatic Fire Sprinkler System (AFSS) 1
0 0
0 0
0 0
ELECTRICAL 0
Conduits, Boxes, and Fittings (Conduit Works / Conduit Rough in) 1
0 0
Wires and Wiring Devices 1
0 0
Panelboard with Main & Branch Breakers 1
0 0
Lighting Fixtures and Lamps 1
0 0
Fire Alarm System 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0