02/04/2016 Concrete Anchor Foundation Bolt Design Calculations with Example as per ACI 318 Appendix D­Part2­Breakout Strength in Tension

Home
MechGuru
Categories
Engineering design
Manufacturing Engineering
Fluid Engineering
Engineering Calculator
Material Engineering
How it Works
Thermal Engineering
Engineering Math
Engineering Softwares
Vehicle Design
Applied Math
Electronics
Advertise

 
Translate
« Example of Concrete Anchor Bolt Design Calculation – Part­1: Determining Steel Strength of Anchor Bolt in Tension

Example of Concrete Anchor Bolt Design Calculation – Part­3: Determining Pullout Strength of Anchor in Tension »

Print this Post

Example of Concrete Anchor Bolt Design Calculation –
Part­2: Determining Concrete Breakout Strength of
Anchor in Tension
We will discuss how to calculate the concrete breakout strength according to the ACI 318 code in
this part of the concrete anchor foundation bolt design calculation example.  Please refer part­1 of
the calculation to understand the design problem statement and the calculations for the anchor
bolt materials strength.

If you refer the Fig.1 and the Fig.2 of the problem statement then it will clear to you that the
distance between two surrounding anchors (in our case it is 6 inch) is less than three times the
effective embedment depth (in our case it is 10 inch). So, as per ACI codes, the anchor
arrangement can be termed as group and the ACI formula for calculating the concrete breakout
strength for the anchor group is:

φNcbg= (ANc/ANco)ψec,N ψed,N ψc,N ψcp,NNb……………………………..D­5

Where,

Φ – Strength reduction factor for breakout strength and its value for non­reinforcement in tension
is 0.70 
ANc –Total projected area for the group of anchors of the failure surface as approximated by a
rectangle with edges bounded by 1.5hef (1.5*10 = 15 inch in our case) and the free edges of the
concrete from the centerline of the anchors.  Confused? You will be clearer while calculating it little
later.

hef – Effective embedment depth of anchor (in our case it is 10 inch).

ANco – Total projected failure area approximated by a square bounded by 1.5hef (1.5*10 = 15 inch
in our case) from the centerline of the anchors at all the sides.

ψec,N – Modification factor for the anchor group loaded eccentrically in tension, in our case there is
no eccentric loading , so ψec,N=1.

ψed,N – Modification factor for edge effect for the anchor group in tension, we will calculate it later.

Ψc,N – Modification factor based on the presence and absence of crack in the concrete, we will
calculate it later.

ψcp,N – Modification factor for post weld types of anchor. For cast in place anchor ψcp,N = 1

http://blog.mechguru.com/machine­design/example­of­concrete­anchor­bolt­design­calculation­part­2­determining­concrete­breakout­strength­of­anchor­in­ten… 1/6
02/04/2016 Concrete Anchor Foundation Bolt Design Calculations with Example as per ACI 318 Appendix D­Part2­Breakout Strength in Tension
Nb – Basic concrete break out strength for a single anchor in tension, we will calculate it later.

Calculation of ANc

Before going to the calculation please refer the plan view of the anchor arrangement as below:

Fig.2.1: Anchor Bolt Plan for calculating Anc

ANC =Area of the square shown in dotted line

= (15+6+5)*(15+6+5) = 676 Square Inch

Calculation of ANco

Before going to the calculation please refer the plan view of the anchor arrangement as below:

http://blog.mechguru.com/machine­design/example­of­concrete­anchor­bolt­design­calculation­part­2­determining­concrete­breakout­strength­of­anchor­in­ten… 2/6
02/04/2016 Concrete Anchor Foundation Bolt Design Calculations with Example as per ACI 318 Appendix D­Part2­Breakout Strength in Tension

Fig.2.2: Anchor Bolt Plan for calculating Anco

ANC =Area of the square shown in dotted line

= (15+15)*(15+15) = 900 Square Inch

Calculation of ψed,N

If, Ca,min (minimum distances between two anchors, 6 inch in our case) is less than 1.5 times the hef (1.5*10=15 inch in our
case) then

ψed,N = 0.7+(0.3*Ca,min)/(1.5*hef)

= 0.7+(0.3*6)/(1.5*10)

= 0.82

Calculation of ψc,N

According to the code the value of ψc,N =1 where concrete crack is likely to occur.

Calculation of Nb

Nb= kc λ hef1.5 fc’ …………………D­7

Where,

Kc – a factor which has value of 24 for cast in concrete.

λ – A factor related to the reduced mechanical properties of concrete, for normal weight concrete  λ=1

hef – Effective embedment depth of anchor (in our case it is 10 inch).

fc’ – Specified compressive strength of the concrete, in our case fc’=4000 psi (refer problem statement)

So, by putting the value in D­7 we get:

Nb =24*1*10^1.5*4000^0.5

http://blog.mechguru.com/machine­design/example­of­concrete­anchor­bolt­design­calculation­part­2­determining­concrete­breakout­strength­of­anchor­in­ten… 3/6
02/04/2016 Concrete Anchor Foundation Bolt Design Calculations with Example as per ACI 318 Appendix D­Part2­Breakout Strength in Tension
= 48000 lb

Now, by putting all the values in D­5 we get the Concrete breakout strength for the anchor group

φNcbg =(ANc/ANco)ψec,N ψed,N ψc,N ψcp,NNb

= 0.70*(676/900)*1*0.82*1*1*48000

= 20694.6131 lb

So, finally we got the concrete break out strength of the anchor group in tension as 20694.6131 lb. In the next part (Part­3) of
the foundation anchor bolt design calculation example, we will discuss about calculating the concrete pull out force in
tension.

About Shibashis Ghosh
Shibashis is a mechanical design engineer by profession and writer/blogger by passion. He has worked in
various design projects in automobile, power plant and heavy earth moving equipment domain since 2005.
In his spare time apart from maintaining this blog, he enjoy investing time building his first RC plane 
Read More>>
Find more about me on:

1 2     More

Like this:

 Like
Be the first to like this.

Related

Example of Concrete Anchor Bolt Design Example of Concrete Anchor Bolt Design
Calculation ­ Part­3: Determining Pullout Calculation ­ Part­4: Determining Side­face
Strength of Anchor in Tension Blowout Strength of Anchor in Tension
Please refer the problem statement and the In this part we will calculate the side­face
part­1, part­2 of this cast in place concrete blowout strength of the concrete anchor
anchor bolt design calculation example so according to the ACI 318 Appendix D codes
that you will be in phase with this part and also consolidate the results of the
Example of Concrete Anchor Bolt Design (part­3) of the calculation. Here we will different types of anchor strengths in
Calculation ­ Part­6: Determining Concrete In "Engineering design"
calculate the pull out strength of the In "Engineering design"
tension we have calculated so far. Please
Breakout Strength of Anchor in Shear
In "Engineering design"

2 comments

1. 

ashe

August 19, 2015 at 1:58 am (UTC 5.5)

according to the commentary, ca,min is the minimum edge distance, not the minimum distance between bolts as you
stated above.

2. 

herb

February 8, 2016 at 8:52 pm (UTC 5.5)

Ashe is correct ca,min =5″ and f’c =3500 psi as per problem statement also eqn D­7 is missing sq rt symbol for f’c .
calculation correctly shows this.
http://blog.mechguru.com/machine­design/example­of­concrete­anchor­bolt­design­calculation­part­2­determining­concrete­breakout­strength­of­anchor­in­ten… 4/6
02/04/2016 Concrete Anchor Foundation Bolt Design Calculations with Example as per ACI 318 Appendix D­Part2­Breakout Strength in Tension
Leave a Reply

Enter your comment here...

Anouncement

Science or Engineering Graduate? Write for
mechGuru

Subscribe

To get the latest post directly to your email box, Enter
your email address:

Subscribe

Recent Posts

Do Value Engineering Upfront, Right at Design
Stage
HPDC vs LPDC
Friction welding vs Friction Stir welding
7 Important 3D Printing Technologies – You
Must Know
Automobile Traction Control System Basics and
Application
How Automobile Air Bag System Works?
Why I­Section Beam is structurally better than
same weight other sections?
Micro vs Mild vs Full Hybrid Vehicle
How Chocolates are Made
How LCRV or LSPV Braking System Works
How to calculate vehicle speed from engine
RPM and vice versa
The Challenges of New Eco­Friendly Tech – Are
Electric Cars Really That Green?
Bolted Joint Design Calculation Example for
Joint in Tension
Worst Case Method Assembly Tolerance Stack
up Calculation for Non­Symmetric Dimensional
Tolerances with Example
DFMEA Creation Tutorial with Example

Search

  Search

Sponsors

http://blog.mechguru.com/machine­design/example­of­concrete­anchor­bolt­design­calculation­part­2­determining­concrete­breakout­strength­of­anchor­in­ten… 5/6
02/04/2016 Concrete Anchor Foundation Bolt Design Calculations with Example as per ACI 318 Appendix D­Part2­Breakout Strength in Tension
Place Your Logo Here

Copyright
© 2008­2015

Return to top

Powered by WordPress and the Graphene Theme.

    Copyright Notice  |  Disclaimer  |  Privacy policy  |  Contact

Follow us:

                   

http://blog.mechguru.com/machine­design/example­of­concrete­anchor­bolt­design­calculation­part­2­determining­concrete­breakout­strength­of­anchor­in­ten… 6/6

You might also like