Professional Documents
Culture Documents
2 Earth rods fitted with inspection pits which are clean and with spe Visual Inspection □ □ □ □ □ □
Legible warning notices (Danger -Electricity) in both Malay and
4 English Visual Inspection □ □ □ □ □ □
Attach drawings and name plate to front panel of distribution board
6 Responsible manager of distribution board appointed Visual Inspection □ □ □ □ □ □
Sub-Con ( )Sub-Con ( )
Item Generator Set Standard Checking
Yes No N/A Yes No N/A
1 The fresh-water-cooled radiator has been properly fixed and there i Visual Inspection □ □ □ □ □ □
2 The enclosure to the alternator satisfy IP21 or as specified. Visual Inspection □ □ □ □ □ □
3 Starting batteries have been provided and properly installed. Visual Inspection □ □ □ □ □ □
4 Any fuel leaks? Check for leaks □ □ □ □ □ □
6 Where specified, facilities for generation at 380/220V have been pr Visual Inspection □ □ □ □ □ □
Name :
Item Feeder Piller at Casting Yard Standard Checking
Yes No N/A Yes No N/A
1 Verify busbar size, busbar connection and insulated for phase, neut Visual Inspection □ □ □ □ □ □
2 Verify door sealing and barrier over live busbar and lugs Visual Inspection □ □ □ □ □ □
3 Verify torque of all bolts/ nuts for busbar Visual Inspection □ □ □ □ □ □
4 Verify for damage & clealiness Visual Inspection □ □ □ □ □ □
5 Verify integrity of cables and connections Visual Inspection □ □ □ □ □ □
6 Verify for functional test of earth leakage circuit breakers Operation test □ □ □ □ □ □
If Non-operating circuit Number :
Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □
** Remarks :
Temporary Electrical System (TES) Inspection Checklist
Temporary electrical system (TES) Inspection Object Location Feeder Piller Name Q'ty Comments
Splash-proof type to IP 54
Lock-off system
** Remarks :
2 2
3 3
HOUSEKEEPING: Ladders, Tools, Material stowed safely, not blocking egress, showers, electrical panels. Excesses debris, material, scraps, labels, disposed of and transported to appropriate
receptacles. No material stored in racks, wire trays, on/around process equipment. Area swept and cleaned at end of task or work day. Signage/labels correct and updated with correct contact info.
점검사진 점검사진
점검일자 : 2017. 04. 05 위치 DAELIM OFFICE 점검일자 : 2017. 04. 05 위치 DAELIM OFFICE
주요 점검내용 : 주요 점검내용 :
Inspection Photo of the TES
점검사진 점검사진
점검일자 : 2017. 04. 05 위치 DAELIM OFFICE 점검일자 : 2017. 04. 05 위치 DAELIM OFFICE
주요 점검내용 : 주요 점검내용 :
Inspection Photo of the TES
지적사진 개선 후 사진
점검일자 : 2017. 04. 05 위치 DAELIM OFFICE 점검일자 : 2017. 04. 05 위치 DAELIM OFFICE
주요 점검내용 : 주요 점검내용 :
VOLTAGE / LOAD TEST
Check performed by: DATE: / /
REMARKS
VOLTAGE LOAD COMMENTS
PHASE A-B: PHASE A:
PHASE B-C: PHASE B:
PHASE C-A: PHASE C:
PHASE A-N: PHASE C:
PHASE B-N: PHASE C:
PHASE C-N: PHASE C:
PHASE A-G: PHASE C:
PHASE B-G: PHASE C:
PHASE C-G: PHASE C: