You are on page 1of 93

DESCRIPCION DATOS

NIVELES 4.000
TP 0.600
H LOSA 0.150
H PISO A TECHO 2.500
HT 10.600
T 0.177 VER LA NORMA
C 2.500
Z 0.350
S2 1.200
U 1.000
bx 10.880
by 8.000
f'c 175.000
fy 4200.000
r 8.000
fm 10.800
Em 6.480
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

METRADOS DE CARGAS
METRADO
DESCRIPCION Peso UNIT. CARGA CARGA T. W/m2
PISO N° VECES largo Ancho Alto subtotal

TODO LOS NIVELES


METRADO DE TECHOS
PESO TOTAL m 361937.8 345.79 Tn
AREA TOTAL DE TECHO 4.00 AREA 87.04 0.12 41.78 2400.00 100270.08
TECHO CON TIJERALES 1.00 AREA 102.78 102.78 70.00 7194.88
LONGITUD TOTAL DE MURO 3.00 58.44 0.15 2.50 65.75 1800.00 118341.00
ACABADO DE PISOS 4.00 AREA 8.24 32.97 100.00 3296.64
LONGITUD DE ALFEIZER 4.00 13.16 1.00 52.64 1600.00 84224.00
LONGITUD DE VENTANAS 4.00 13.16 0.006 1.50 0.47 250.00 118.44
VENTANAS ALTAS 4.00 3.04 1.70 20.67 1600.00 33075.20
VIDRIO EN VENTANAS ALTAS 4.00 0.00 0.006 0.80 0.00 250.00 0.00
PUERTAS 3.00 0.00 2.50 0.00 7.00 0.00
SOBRE CARGA 3.00 102.78 0.20 61.67 250.00 15417.60

PESO TOTAL DE TECHOS 107464.96


PERO TORAL DE MUROS POR PISO 39447.00

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

RIGIDECES EN MUROS
MURO EN ELE EJE X
𝑅�=𝐸𝑚𝑡/(4∗(𝐻/𝐿)^3+3∗(𝐻/𝐿)) MURO L(cm) H(cm) t(cm)
1X 176.00 250.00 15.00
2X 175.00 250.00 15.00
3X 175.00 250.00 15.00
4X 100.00 250.00 15.00
5X 233.00 250.00 15.00
6X 274.00 250.00 15.00
Em: Modulo de elasticidad de la albañileria 7X 250.00 250.00 15.00
t: Espesor de muro 8X 174.00 250.00 15.00
H: Altura de muro 9X 199.00 250.00 15.00
L: Longitud de muro 10X 250.00 250.00 15.00
11X 99.00 250.00 15.00
12X 100.00 250.00 15.00
13X 200.00 250.00 15.00
14X 224.00 250.00 15.00
15X 100.00 250.00 15.00
16X 100.00 250.00 15.00

2829.000

MURO EN EL EJE Y
MURO L(cm) H(cm) t(cm)
1Y 350.00 250.00 15.00
2Y 126.00 250.00 15.00
3Y 201.00 250.00 15.00
4Y 249.00 250.00 15.00
5Y 225.00 250.00 15.00
6Y 350.00 250.00 15.00
7Y 126.00 250.00 15.00
8Y 126.00 250.00 15.00
9Y 300.00 250.00 15.00
10Y 300.00 250.00 15.00
11Y 199.00 250.00 15.00
12Y 300.00 250.00 15.00

2852.00

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

EJE X
Em R
6.48 6.18
6.48 6.09
6.48 6.09
6.48 1.39
6.48 11.91
6.48 16.83
6.48 13.89
6.48 13.89
6.48 6.01
6.48 8.31
6.48 13.89
6.48 1.35
6.48 1.39
6.48 8.41
6.48 10.91
6.48 1.39

JE Y
Em R
6.48 27.00
6.48 2.61
6.48 2.61
6.48 8.51
6.48 13.77
6.48 11.02
6.48 27.00
6.48 2.61
6.48 2.61
6.48 20.19
6.48 20.19
6.48 8.31

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

FUERZA SISMICA

FUERZA SISMICA
H 0.35
P 361937.8 Kg
H 126.68 Tn

F=0.4H 50.671
Fi Vi
F4 50.671 V4 50.671
F3 38.003 V3 88.675
F=0.3H 38.003 F2 25.336 V2 114.010
F1 12.668 V1 126.68

F=0.2H 25.336

V4
V3
F=0.1H 12.668 V2
V1

F 126.68

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

CENTRO DE RIGIDECES

MURO EN ELE EJE X MURO EN EL EJE Y


MURO Rxi Yi Rxi*Yi MURO Ryi Xi
1X 6.18 7.88 1Y 27.00 0.00
2X 6.09 7.88 48.029 2Y 2.61 3.87
3X 6.09 7.88 48.029 3Y 2.61 3.87
4X 1.39 7.88 10.942 4Y 8.51 5.24
5X 11.91 6.51 77.547 5Y 13.77 7.74
6X 16.83 4.38 73.714 6Y 11.02 10.76
7X 13.89 4.38 60.819 7Y 27.00 0.00
8X 13.89 4.38 60.819 8Y 2.61 10.76
9X 6.01 4.38 26.322 9Y 2.61 0.00
10X 8.31 3.00 24.924 10Y 20.19 3.12
11X 13.89 3.00 41.657 11Y 20.19 6.74
12X 1.35 3.00 4.051 12Y 8.31 10.76
13X 1.39 0.00 0.000
14X 8.41 0.00 0.000
15X 10.91 0.00 0.000
16X 1.39 0.00 0.000

TOTAL 127.920 476.852


TOTAL 146.420

* SE MIDE DE EJE A EJE

Xri 4.142
Yri 3.728

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

EL EJE Y
Ryi*Xi
0.000
10.113
10.113
44.569
106.555
118.576
0.000
28.117
0.000
62.986
136.065
89.393

606.487

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

CENTRO DE MASAS

MUROS EN ELE EJE X MUROS EN ELE EJE Y


MURO L H t PU Pi Xi Pi*Xi MURO L H t
1X 1.76 2.50 0.15 1600.00 1056.00 0.19 200.64 1Y 3.50 2.50 0.15
2X 1.75 2.50 0.15 1600.00 1050.00 2.19 2299.50 2Y 1.26 2.50 0.15
3X 1.75 2.50 0.15 1600.00 1050.00 4.69 4924.50 3Y 2.01 2.50 0.15
4X 1.00 2.50 0.15 1600.00 600.00 7.93 4758.00 4Y 2.49 2.50 0.15
5X 2.33 2.50 0.15 1600.00 1398.00 10.20 14259.60 5Y 2.25 2.50 0.15
6X 2.74 2.50 0.15 1600.00 1644.00 2.75 4521.00 6Y 3.50 2.50 0.15
7X 2.50 2.50 0.15 1600.00 1500.00 6.55 9825.00 7Y 1.26 2.50 0.15
8X 1.74 2.50 0.15 1600.00 1044.00 9.95 10387.80 8Y 1.26 2.50 0.15
9X 1.99 2.50 0.15 1600.00 1194.00 1.06 1265.64 9Y 3.00 2.50 0.15
10X 2.50 2.50 0.15 1600.00 1500.00 5.43 8145.00 10Y 3.00 2.50 0.15
11X 0.99 2.50 0.15 1600.00 594.00 10.33 6136.02 11Y 1.99 2.50 0.15
12X 1.00 2.50 0.15 1600.00 600.00 0.56 336.00 12Y 3.00 2.50 0.15
13X 2.00 2.50 0.15 1600.00 1200.00 1.12 1344.00
14X 2.24 2.50 0.15 1600.00 1344.00 6.24 8386.56
15X 1.00 2.50 0.15 1600.00 600.00 8.30 4980.00
16X 1.00 2.50 0.15 1600.00 600.00 10.20 6120.00

16974.000 87889.260
TOTAL

EXCENTRICIDAD
bx 10.880 ex -1.036
by 8.000 eaccx 0.544
XG 5.178 ey -0.774

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

YG 4.502 eaccy 0.400

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

MUROS EN ELE EJE Y


PU Pi Yi Pi*Xi
1600.00 2100.00 7.57 15897.00
1600.00 756.00 7.24 5473.44
1600.00 1206.00 5.45 6572.70
1600.00 1494.00 5.57 8321.58
1600.00 1350.00 6.70 9045.00
1600.00 2100.00 7.76 16289.70
1600.00 756.00 3.69 2789.64
1600.00 756.00 3.69 2789.64
1600.00 1800.00 1.44 2592.00
1600.00 1800.00 1.56 2808.00
1600.00 1194.00 1.56 1862.64
1600.00 1800.00 1.44 2592.00

17112.000 77033.340

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

MOMENTO TORSOR

V4 50.671 ex -1.036
V3 88.675 eaccx 0.544
V2 114.010 ey -0.774
V1 126.678 eaccy 0.400

PRIMER PISO PRIMER PISO


MTX1 -127.899 MTY1 -96.398
MTX2 -200.121 MTY2 -148.717

SEGUNDO PISO SEGUNDO PISO


MTX1 -115.109 MTY1 -86.758
MTX2 -180.109 MTY2 -133.846

TERCER PISO TERCER PISO


MTX1 -89.529 MTY1 -67.479
MTX2 -140.085 MTY2 -104.102

CUARTO PISO CUARTO PISO


MTX1 -51.160 MTY1 -38.559
MTX2 -80.048 MTY2 -59.487

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
PRIMER PISO INCREMENTO DE FUERZAS HORIZONTALES
MURO b L y V r (r)y y-yr r(y-yr) r(y-yr)^2 dV1 dV2
1X 0.150 1.760 7.880 6.121 6.181 48.707 4.152 25.665 106.569 -1.003 -1.570
2X 0.150 1.750 7.880 6.036 6.095 48.029 4.152 25.308 105.085 -0.989 -1.548
3X 0.150 1.750 7.880 6.036 6.095 48.029 4.152 25.308 105.085 -0.989 -1.548
4X 0.150 1.000 7.880 1.375 1.389 10.942 4.152 5.766 23.941 -0.225 -0.353
5X 0.150 2.330 7.880 11.796 11.912 93.866 4.152 49.462 205.378 -1.933 -3.025
6X 0.150 2.740 6.510 16.666 16.830 109.561 2.782 46.825 130.278 -1.830 -2.864
7X 0.150 2.500 4.380 13.751 13.886 60.819 0.652 9.057 5.908 -0.354 -0.554
8X 0.150 1.740 4.380 13.751 13.886 60.819 0.652 9.057 5.908 -0.354 -0.554
9X 0.150 1.990 4.380 5.951 6.010 26.322 0.652 3.920 2.557 -0.153 -0.240
10X 0.150 2.500 4.380 8.227 8.308 36.389 0.652 5.419 3.535 -0.212 -0.331
11X 0.150 0.990 3.000 13.751 13.886 41.657 -0.728 -10.105 7.354 0.395 0.618
12X 0.150 1.000 3.000 1.337 1.350 4.051 -0.728 -0.983 0.715 0.038 0.060
13X 0.150 2.000 3.000 1.375 1.389 4.166 1.611 2.238 3.606 0.040 0.062
14X 0.150 2.240 0.000 8.325 8.406 0.000 -3.728 -31.337 116.817 1.225 1.917
15X 0.150 1.000 0.000 10.804 10.910 0.000 -3.728 -40.671 151.610 1.590 2.488
16X 0.150 1.000 0.000 1.375 1.389 0.000 -3.728 -5.176 19.296 0.202 0.317

TOTAL 2.400 28.290 72.430 126.678 127.920 593.356 15.125 119.752 993.641 -4.554 -7.126

MURO b L x V r (r^2)x x-xr r(x-xr) r(x-xr)^2 dV1 dV2


1Y 0.150 3.500 0.000 23.356 26.996 0.000 -4.142 -111.819 463.168 3.294 5.082
2Y 0.150 3.500 3.870 2.261 2.613 10.113 -0.272 -0.711 0.193 0.021 0.032
3Y 0.150 1.260 3.870 2.261 2.613 10.113 -0.272 -0.711 0.193 0.021 0.032
4Y 0.150 2.010 5.240 7.359 8.506 44.569 1.098 9.338 10.252 -0.275 -0.424
5Y 0.150 2.490 7.740 11.911 13.767 106.555 3.598 49.532 178.209 -1.459 -2.251
6Y 0.150 2.250 10.760 9.534 11.020 118.576 6.618 72.929 482.637 -2.149 -3.315
7Y 0.150 3.500 0.000 23.356 26.996 0.000 -4.142 -111.819 463.168 3.294 5.082
8Y 0.150 1.260 10.760 2.261 2.613 28.117 6.618 17.294 114.446 -0.510 -0.786

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
9Y 0.150 1.260 0.000 2.261 2.613 0.000 -4.142 -10.824 44.834 0.319 0.492
10Y 0.150 3.000 3.120 17.466 20.188 62.986 -1.022 -20.634 21.091 0.608 0.938
11Y 0.150 3.000 6.740 17.466 20.188 136.065 2.598 52.445 136.247 -1.545 -2.384
12Y 0.150 1.990 10.760 7.188 8.308 89.393 6.618 54.981 363.856 -1.620 -2.499
0 0.000 3.000 0.000 0.000 0.000 0.000 -4.142 0.000 0.000 0.000 0.000

TOTAL 1.800 32.020 62.860 126.678 146.420 606.487 9.012 0.000 2278.294 0.000 0.000

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
INCREMENTO DE FUERZAS HORIZONTALES
V1 V2 V
7.124 7.691 7.691
7.025 7.584 7.584
7.025 4.488 7.025
1.600 1.022 1.600
13.730 14.822 14.822
18.497 19.530 19.530
13.397 14.305 14.305
13.397 14.305 14.305
5.798 6.191 6.191
8.439 8.559 8.559
13.356 13.133 13.356
1.376 1.277 1.376
1.415 1.313 1.415
9.550 6.408 9.550
9.215 8.317 9.215
1.173 1.058 1.173

132.115 130.003 137.695

V1 V2 V
20.061 18.273 20.061
2.240 2.229 2.240
2.240 2.229 2.240
7.634 7.783 7.783
13.370 14.162 14.162
11.683 12.849 12.849
20.061 18.273 20.061
2.770 3.047 3.047

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
1.942 2.753 2.753
16.858 16.528 16.858
19.011 19.850 19.850
8.808 4.689 8.808
0.000 0.000 0.000

126.678 122.664 130.712

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

FUERZAS VERTICALES DE GRAVEDAD SOBRE CADA MURO

PRIMER PISO 345.79


PESO DE TECHOS 107464.96
PESO DE MUROS 157788.00
LONGITUD TOTAL DE MUROS 58.44
WD 5.92 Tn
WL 1.117 Tn
*CARGAS CONSTANTES SOBRE LOS MUROS DEL PRIMER PISO

MURO V P(D) P(L) Vact L(cm) t(cm)

1X 7.691 10.414 11.633 2.185 176.000 20.000


2X 7.584 10.355 11.567 2.167 175.000 20.000
3X 7.025 10.355 11.567 2.007 175.000 20.000
4X 1.600 5.917 6.610 0.800 100.000 20.000
5X 14.822 13.787 15.400 2.226 233.000 20.000
6X 19.530 16.213 18.110 1.782 274.000 20.000
7X 14.305 14.793 16.524 1.430 250.000 20.000
8X 14.305 10.296 11.501 2.055 174.000 20.000
9X 6.191 11.775 13.153 0.778 199.000 20.000
10X 8.559 14.793 16.524 0.856 250.000 20.000
11X 13.356 5.858 6.543 4.047 99.000 20.000
12X 1.376 5.917 6.610 0.413 100.000 20.000
13X 1.415 11.834 13.219 0.354 200.000 20.000
14X 9.550 13.254 14.805 1.066 224.000 20.000
15X 9.215 5.917 6.610 2.304 100.000 20.000
16X 1.173 5.917 6.610 0.586 100.000 20.000

TOTAL

MURO V P(D) P(L) Vact L(cm) t(cm)

1Y 20.061 24.619 27.501 1.433 350.000 20.000


2Y 2.240 24.619 27.501 0.320 350.000 20.000
3Y 2.240 8.863 9.900 0.889 126.000 20.000
4Y 7.783 14.138 15.793 1.936 201.000 20.000
5Y 14.162 17.515 19.565 1.706 249.000 20.000
6Y 12.849 15.827 17.679 2.855 225.000 20.000
7Y 20.061 24.619 27.501 1.433 350.000 20.000
8Y 3.047 8.863 9.900 1.209 126.000 20.000
9Y 2.753 8.863 9.900 1.092 126.000 20.000
10Y 16.858 21.102 23.572 1.686 300.000 20.000
11Y 19.850 21.102 23.572 1.985 300.000 20.000
12Y 8.808 13.998 15.636 2.213 199.000 20.000

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

0 0.000 21.102 23.572 0.000 300.000 20.000

TOTAL

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

Fd Vadm con cal V correcto

1.681 2.103 REHACER!


1.691 2.104 REHACER!
1.691 2.104 OK!!!!
2.959 2.333 OK!!!!
1.270 2.029 REHACER!
1.080 1.994 OK!!!!
1.183 2.013 OK!!!!
1.700 2.106 OK!!!!
1.487 2.068 OK!!!!
1.183 2.013 OK!!!!
2.988 2.338 REHACER!
2.959 2.333 OK!!!!
1.479 2.066 OK!!!!
1.321 2.038 OK!!!!
2.959 2.333 OK!!!!
2.959 2.333 OK!!!!

Fd Vadm con cal V correcto

0.845 1.952 OK!!!!


0.845 1.952 OK!!!!
2.348 2.223 OK!!!!
1.472 2.065 OK!!!!
1.188 2.014 OK!!!!
1.315 2.037 REHACER!
0.845 1.952 OK!!!!
2.348 2.223 OK!!!!
2.348 2.223 OK!!!!
0.986 1.978 OK!!!!
0.986 1.978 REHACER!
1.487 2.068 REHACER!

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

0.986 1.978 OK!!!!

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

DISEÑO POR FLEXION PRIMER PISO

MURO PD PL PU L t fm f'm

1X 10.414 11.633 33.070 176.000 20.000 9.395 11.8


2X 10.355 11.567 32.882 175.000 20.000 9.395 11.8
3X 10.355 11.567 32.882 175.000 20.000 9.395 11.8
4X 5.917 6.610 18.790 100.000 20.000 9.395 11.8
5X 13.787 15.400 43.780 233.000 20.000 9.395 11.8
6X 16.213 18.110 51.484 274.000 20.000 9.395 11.8
7X 14.793 16.524 46.975 250.000 20.000 9.395 11.8
8X 10.296 11.501 32.694 174.000 20.000 9.395 11.8
9X 11.775 13.153 37.392 199.000 20.000 9.395 11.8
10X 14.793 16.524 46.975 250.000 20.000 9.395 11.8
11X 5.858 6.543 18.602 99.000 20.000 9.395 11.8
12X 5.917 6.610 18.790 100.000 20.000 9.395 11.8
13X 11.834 13.219 37.580 200.000 20.000 9.395 11.8
14X 13.254 14.805 42.089 224.000 20.000 9.395 11.8
15X 5.917 6.610 18.790 100.000 20.000 9.395 11.8
16X 5.917 6.610 18.790 100.000 20.000 9.395 11.8
0 0.000 0.000 0.000 0.000 0.000 #DIV/0! 11.8

MURO PD PL PU L t fm f'm
1Y 24.619 27.501 78.180 350.000 20 10.052 11.8
2Y 24.619 27.501 78.180 350.000 20 10.052 11.8
3Y 8.863 9.900 28.145 126.000 20 10.052 11.8
4Y 14.138 15.793 44.898 201.000 20 10.052 11.8
5Y 17.515 19.565 55.619 249.000 20 10.052 11.8
6Y 15.827 17.679 50.258 225.000 20 10.052 11.8
7Y 24.619 27.501 78.180 350.000 20 10.052 11.8
8Y 8.863 9.900 28.145 126.000 20 10.052 11.8
9Y 8.863 9.900 28.145 126.000 20 10.052 11.8
10Y 21.102 23.572 67.011 300.000 20 11.169 11.8
11Y 21.102 23.572 67.011 300.000 20 10.052 11.8
12Y 13.998 15.636 44.451 199.000 20 10.052 11.8
0 21.102 23.572 67.011 300.000 20 10.052 11.8
0 0.000 0.000 0.000 0.000 0 #DIV/0! 11.8
0 0.000 0.000 0.000 0.000 0 #DIV/0! 11.8
0 0.000 0.000 0.000 0.000 0 #DIV/0! 11.8

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

VERFICACION Øf Mu

OK!!!! 0.691 34.793


OK!!!! 0.691 34.309
OK!!!! 0.691 31.781
OK!!!! 0.691 7.241
OK!!!! 0.691 67.052
OK!!!! 0.691 88.354
OK!!!! 0.691 64.715
OK!!!! 0.691 64.715
OK!!!! 0.691 28.008
OK!!!! 0.691 38.719
OK!!!! 0.691 60.422
OK!!!! 0.691 6.223
OK!!!! 0.691 6.400
OK!!!! 0.691 43.203
OK!!!! 0.691 41.687
OK!!!! 0.691 5.306
#DIV/0! #DIV/0! #DIV/0!

VERFICACIO Øf Mu
N
OK!!!! 0.680 92.244
OK!!!! 0.680 10.299
OK!!!! 0.680 10.299
OK!!!! 0.680 35.788
OK!!!! 0.680 65.118
OK!!!! 0.680 59.081
OK!!!! 0.680 92.244
OK!!!! 0.680 14.010
OK!!!! 0.680 12.658
OK!!!! 0.661 79.735
OK!!!! 0.680 91.270
OK!!!! 0.680 40.498
OK!!!! 0.680 0.000
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
ACERO CORTANTE TOTAL DEL PRIMER PISO
Pu =
MURO fy L r L (L-r) t f'm PD Mu (tn) Ast (cm2) a d ASUMIDO
(70%PD)
1X 4200.00 176.00 8.00 160.00 20.00 118.00 10.41 7.29 34.79 10.35 21.68 1.70
2X 4200.00 175.00 8.00 159.00 20.00 118.00 10.35 7.25 34.31 10.27 21.51 1.70
3X 4200.00 175.00 8.00 159.00 20.00 118.00 10.35 7.25 31.78 9.52 19.92 1.70
4X 4200.00 100.00 8.00 84.00 20.00 118.00 5.92 4.14 7.24 4.10 8.59 1.00
5X 4200.00 233.00 8.00 217.00 20.00 118.00 13.79 9.65 67.05 14.71 30.80 2.20
6X 4200.00 274.00 8.00 258.00 20.00 118.00 16.21 11.35 88.35 16.30 34.14 2.60
7X 4200.00 250.00 8.00 234.00 20.00 118.00 14.79 10.35 64.71 13.17 27.57 2.40
8X 4200.00 174.00 8.00 158.00 20.00 118.00 10.30 7.21 64.71 19.50 40.83 1.60
9X 4200.00 199.00 8.00 183.00 20.00 118.00 11.77 8.24 28.01 7.29 15.25 2.00
10X 4200.00 250.00 8.00 234.00 20.00 118.00 14.79 10.35 38.72 7.88 16.49 2.50
11X 4200.00 99.00 8.00 83.00 20.00 118.00 5.86 4.10 60.42 34.66 72.58 0.70
12X 4200.00 100.00 8.00 84.00 20.00 118.00 5.92 4.14 6.22 3.53 7.38 1.00
13X 4200.00 200.00 8.00 184.00 20.00 118.00 11.83 8.28 6.40 1.65 3.46 2.00
14X 4200.00 224.00 8.00 208.00 20.00 118.00 13.25 9.28 43.20 9.89 20.70 2.20
15X 4200.00 100.00 8.00 84.00 20.00 118.00 5.92 4.14 41.69 23.63 49.48 0.80
16X 4200.00 100.00 8.00 84.00 20.00 118.00 5.92 4.14 5.31 3.01 6.29 1.00
0 4200.00 0.00 8.00 -16.00 0.00 118.00 0.00 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Pu =
MURO fy L r L (L-r) t f'm PD Mu Ast (cm2) a d ASUMIDO
(70%PD)
1Y 4200.00 350.00 8.00 334.00 20.00 118.00 24.62 17.23 92.24 13.15 27.53 3.40
2Y 4200.00 350.00 8.00 334.00 20.00 118.00 24.62 17.23 10.30 1.46 3.07 3.50
3Y 4200.00 126.00 8.00 110.00 20.00 118.00 8.86 6.20 10.30 4.46 9.33 1.30
4Y 4200.00 201.00 8.00 185.00 20.00 118.00 14.14 9.90 35.79 9.21 19.28 2.00
5Y 4200.00 249.00 8.00 233.00 20.00 118.00 17.51 12.26 65.12 13.31 27.86 2.40
6Y 4200.00 225.00 8.00 209.00 20.00 118.00 15.83 11.08 59.08 13.46 28.18 2.20
7Y 4200.00 350.00 8.00 334.00 20.00 118.00 24.62 17.23 92.24 13.15 27.53 3.40
8Y 4200.00 126.00 8.00 110.00 20.00 118.00 8.86 6.20 14.01 6.06 12.69 1.20
9Y 4200.00 126.00 8.00 110.00 20.00 118.00 8.86 6.20 12.66 5.48 11.47 1.30

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
10Y 4200.00 300.00 8.00 284.00 20.00 118.00 21.10 14.77 79.73 13.37 27.98 2.90
11Y 4200.00 300.00 8.00 284.00 20.00 118.00 21.10 14.77 91.27 15.30 32.03 2.90
12Y 4200.00 199.00 8.00 183.00 20.00 118.00 14.00 9.80 40.50 10.54 22.06 1.90
0 4200.00 300.00 8.00 284.00 20.00 118.00 21.10 14.77 0.00 0.00 -0.01 3.10
0 4200.00 0.00 8.00 -16.00 20.00 118.00 0.00 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 4200.00 0.00 8.00 -16.00 20.00 118.00 0.00 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 4200.00 0.00 8.00 -16.00 20.00 118.00 0.00 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0
0
0
0

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
RTANTE TOTAL DEL PRIMER PISO
VERIFICACION
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
MAL
OK!!!!
OK!!!!
OK!!!!
MAL
OK!!!!
#DIV/0!

VERIFICACION
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!
OK!!!!

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
OK!!!!
OK!!!!
OK!!!!
OK!!!!
#DIV/0!
#DIV/0!
#DIV/0!

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
DISEÑO POR CORTE PRIMER PISO
MURO L(m) V Øf Vu d t(cm) ØS fy S(cm) AH(cm2)
1X 176.000 7.691 0.691 19.484 140.800 20.000 1.000 4200.000 100.000 3.200
2X 175.000 7.584 0.691 19.213 140.000 20.000 1.000 4200.000 100.000 3.200
3X 175.000 7.025 0.691 17.798 140.000 20.000 1.000 4200.000 100.000 3.000
4X 100.000 1.600 0.691 4.055 80.000 20.000 1.000 4200.000 100.000 1.200
5X 233.000 14.822 0.691 37.549 186.400 20.000 1.000 4200.000 100.000 4.700
6X 274.000 19.530 0.691 49.478 219.200 20.000 1.000 4200.000 100.000 5.300
7X 250.000 14.305 0.691 36.240 200.000 20.000 1.000 4200.000 100.000 4.300
8X 174.000 14.305 0.691 36.240 139.200 20.000 1.000 4200.000 100.000 6.100
9X 199.000 6.191 0.691 15.684 159.200 20.000 1.000 4200.000 100.000 2.300
10X 250.000 8.559 0.691 21.683 200.000 20.000 1.000 4200.000 100.000 2.500
11X 99.000 13.356 0.691 33.836 79.200 20.000 1.000 4200.000 100.000 10.100
12X 100.000 1.376 0.691 3.485 80.000 20.000 1.000 4200.000 100.000 1.000
13X 200.000 1.415 0.691 3.584 160.000 20.000 1.000 4200.000 100.000 0.500
14X 224.000 9.550 0.691 24.194 179.200 20.000 1.000 4200.000 100.000 3.200
15X 100.000 9.215 0.691 23.345 80.000 20.000 1.000 4200.000 100.000 6.900
16X 100.000 1.173 0.691 2.971 80.000 20.000 1.000 4200.000 100.000 0.800
0 0.000 0.000 #DIV/0! #DIV/0! 0.000 0.000 1.000 4200.000 100.000 #DIV/0!

MURO L(m) V Øf Vu d t(cm) ØS fy S(cm) AH(cm2)

1Y 350.000 20.061 0.680 51.657 280.000 20.000 1.000 4200.000 100.000 4.300
2Y 350.000 2.240 0.680 5.768 280.000 20.000 1.000 4200.000 100.000 0.400
3Y 126.000 2.240 0.680 5.768 100.800 20.000 1.000 4200.000 100.000 1.300
4Y 201.000 7.783 0.680 20.041 160.800 20.000 1.000 4200.000 100.000 2.900
5Y 249.000 14.162 0.680 36.466 199.200 20.000 1.000 4200.000 100.000 4.300
6Y 225.000 12.849 0.680 33.085 180.000 20.000 1.000 4200.000 100.000 4.300
7Y 350.000 20.061 0.680 51.657 280.000 20.000 1.000 4200.000 100.000 4.300
8Y 126.000 3.047 0.680 7.845 100.800 20.000 1.000 4200.000 100.000 1.800

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
9Y 126.000 2.753 0.680 7.088 100.800 20.000 1.000 4200.000 100.000 1.600
10Y 300.000 16.858 0.661 44.651 240.000 20.000 1.000 4200.000 100.000 4.400
11Y 300.000 19.850 0.680 51.111 240.000 20.000 1.000 4200.000 100.000 5.000
12Y 199.000 8.808 0.680 22.679 159.200 20.000 1.000 4200.000 100.000 3.300
0 300.000 0.000 0.680 0.000 240.000 20.000 1.000 4200.000 100.000 0.000

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

As min VERIFICACION VARILLAS


1/2"
2.000 3.200 3.000
2.000 3.200 3.000
2.000 3.000 3.000
2.000 2.000 2.000
2.000 4.700 4.000
2.000 5.300 5.000
2.000 4.300 4.000
2.000 6.100 5.000
2.000 2.300 2.000
2.000 2.500 2.000
2.000 10.100 8.000
2.000 2.000 2.000
2.000 2.000 2.000
2.000 3.200 3.000
2.000 6.900 6.000
2.000 2.000 2.000
0.000 #DIV/0! #DIV/0!

VARILLAS
As min VERIFICACION 1/2"
7.000 7.000 6.000
7.000 7.000 6.000
2.520 2.520 2.000
4.020 4.020 4.000
4.980 4.980 4.000
4.500 4.500 4.000
7.000 7.000 6.000
2.520 2.520 2.000
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
2.520 2.520 2.000
6.000 6.000 5.000
6.000 6.000 5.000
3.980 3.980 4.000
6.000 6.000 5.000

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
SEGUNDO PISO INGENIERIA CIVIL INCREMENTO DE FUERZAS HORIZONTALES
MURO b L y V ALBAÑILERIA
r ESTRUCTURAL
(r)y y-yr r(y-yr) r(y-yr)^2 dV1 dV2
1X 0.150 1.760 Err:509 5.509 6.181 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2X 0.150 1.750 7.880 5.432 6.095 48.029 4.152 25.308 105.085 Err:509 Err:509
3X 0.150 1.750 7.880 5.432 6.095 48.029 4.152 25.308 105.085 Err:509 Err:509
4X 0.150 1.000 7.880 1.238 1.389 10.942 4.152 5.766 23.941 Err:509 Err:509
5X 0.150 2.330 7.880 10.617 11.912 93.866 4.152 49.462 205.378 Err:509 Err:509
6X 0.150 2.740 6.510 15.000 16.830 109.561 2.782 46.825 130.278 Err:509 Err:509
7X 0.150 Err:509 4.380 12.376 13.886 60.819 0.652 9.057 5.908 Err:509 Err:509
8X 0.150 2.500 4.380 12.376 13.886 60.819 0.652 9.057 5.908 Err:509 Err:509
9X 0.150 1.740 4.380 5.356 6.010 26.322 0.652 3.920 2.557 Err:509 Err:509
10X 0.150 1.990 4.380 7.405 8.308 36.389 0.652 5.419 3.535 Err:509 Err:509
11X 0.150 2.500 3.000 12.376 13.886 41.657 -0.728 -10.105 7.354 Err:509 Err:509
12X 0.150 0.990 3.000 1.203 1.350 4.051 -0.728 -0.983 0.715 Err:509 Err:509
13X 0.150 1.000 3.000 1.238 1.389 4.166 -0.728 -1.011 0.735 Err:509 Err:509
14X 0.150 2.000 0.000 7.492 8.406 0.000 -3.728 -31.337 116.817 Err:509 Err:509
15X 0.150 2.240 0.000 9.724 10.910 0.000 -3.728 -40.671 151.610 Err:509 Err:509
16X 0.150 1.000 0.000 1.238 1.389 0.000 -3.728 -5.176 19.296 Err:509 Err:509
0 0.000 1.000 0.000 0.000 0.000 0.000 -3.728 0.000 0.000 Err:509 Err:509

TOTAL 2.400 Err:509 Err:509 114.010 127.920 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

MURO b L x V r (r)x x-xr r(x-xr) r(x-xr)^2 dV1 dV2


1Y 0.150 3.500 0.000 21.020 26.996 0.000 -4.142 -111.819 463.168 Err:509 Err:509
2Y 0.150 Err:509 3.870 2.035 2.613 10.113 -0.272 -0.711 0.193 Err:509 Err:509
3Y 0.150 1.260 3.870 2.035 2.613 10.113 -0.272 -0.711 0.193 Err:509 Err:509
4Y 0.150 2.010 5.240 6.623 8.506 44.569 1.098 9.338 10.252 Err:509 Err:509
5Y 0.150 2.490 7.740 10.720 13.767 106.555 3.598 49.532 178.209 Err:509 Err:509
6Y 0.150 2.250 10.760 8.581 11.020 118.576 6.618 72.929 482.637 Err:509 Err:509
7Y 0.150 3.500 0.000 21.020 26.996 0.000 -4.142 -111.819 463.168 Err:509 Err:509
8Y 0.150 1.260 10.760 2.035 2.613 28.117 6.618 17.294 114.446 Err:509 Err:509
9Y 0.150 1.260 0.000 2.035 2.613 0.000 -4.142 -10.824 44.834 Err:509 Err:509
10Y 0.150 3.000 3.120 15.719 20.188 62.986 -1.022 -20.634 21.091 Err:509 Err:509
11Y 0.150 3.000 6.740 15.719 20.188 136.065 2.598 52.445 136.247 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

12Y 0.150 1.990 10.760 6.469 8.308 89.393 6.618 54.981 363.856 Err:509 Err:509
0 0.000 3.000 0.000 0.000 0.000 0.000 -4.142 0.000 0.000 Err:509 Err:509

TOTAL 1.800 Err:509 62.860 114.010 146.420 606.487 9.012 0.000 2278.294 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INCREMENTO DE FUERZAS HORIZONTALES INGENIERIA CIVIL
ALBAÑILERIA
V1 ESTRUCTURAL
V2 V
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

V1 V2 V
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

DISEÑO POR FLEXION SEGUNDO PISO

MURO PD PL PU L t fm f'm

1X 6.800 5.064 17.797 176.000 20.000 5.056 11.8


2X 6.762 5.035 17.696 175.000 20.000 5.056 11.8
3X 6.762 5.035 17.696 175.000 20.000 5.056 11.8
4X 3.864 2.877 10.112 100.000 20.000 5.056 11.8
5X 9.003 6.704 23.561 233.000 20.000 5.056 11.8
6X 10.587 7.884 27.707 274.000 20.000 5.056 11.8
7X 9.660 7.194 25.280 250.000 20.000 5.056 11.8
8X 6.723 5.007 17.595 174.000 20.000 5.056 11.8
9X 7.689 5.726 20.123 199.000 20.000 5.056 11.8
10X 9.660 7.194 25.280 250.000 20.000 5.056 11.8
11X 3.825 2.849 10.011 99.000 20.000 5.056 11.8
12X 3.864 2.877 10.112 100.000 20.000 5.056 11.8
13X 7.728 5.755 20.224 200.000 20.000 5.056 11.8
14X 8.655 6.445 22.651 224.000 20.000 5.056 11.8
15X 3.864 2.877 10.112 100.000 20.000 5.056 11.8
16X 3.864 2.877 10.112 100.000 20.000 5.056 11.8
0 0.000 0.000 0.000 0.000 0.000 #DIV/0! 11.8

MURO PD PL PU L t fm f'm

1Y 24.619 10.071 52.035 350.000 20 7.434 11.8


2Y 24.619 10.071 52.035 350.000 20 7.434 11.8
3Y 8.863 3.626 18.733 126.000 20 7.434 11.8
4Y 14.138 5.784 29.883 201.000 20 7.434 11.8
5Y 17.515 7.165 37.019 249.000 20 7.434 11.8
6Y 15.827 6.474 33.451 225.000 20 7.434 11.8
7Y 24.619 10.071 52.035 350.000 20 7.434 11.8
8Y 8.863 3.626 18.733 126.000 20 7.434 11.8
9Y 8.863 3.626 18.733 126.000 20 7.434 11.8
10Y 21.102 8.632 44.602 300.000 20 7.434 11.8
11Y 21.102 8.632 44.602 300.000 20 7.434 11.8
12Y 13.998 5.726 29.586 199.000 20 7.434 11.8
0 21.102 8.632 44.602 300.000 20 7.434 11.8

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

VERFICACION Øf Mu

OK!!!! 0.764 Err:509


OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
OK!!!! 0.764 Err:509
#DIV/0! #DIV/0! Err:509

VERFICACION Øf Mu

OK!!!! 0.724 Err:509


OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509
OK!!!! 0.724 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

FUERZAS VERTICALES DE GRAVEDAD SOBRE CADA MURO

SEGUNDO PISO ###


PESO DE TECHOS 107464.96
PESO DE MUROS 118341.00
LONGITUD TOTAL DE MUROS 58.44
WD 3.86 Tn
WL 0.745 Tn
*CARGAS CONSTANTES SOBRE LOS MUROS DEL SEGUNDO PISO

MURO V P(D) P(L) Vact L(cm) t(cm) Fd

1X Err:509 6.800 5.064 Err:509 176.000 20.000 1.098


2X Err:509 6.762 5.035 Err:509 175.000 20.000 1.104
3X Err:509 6.762 5.035 Err:509 175.000 20.000 1.104
4X Err:509 3.864 2.877 Err:509 100.000 20.000 1.932
5X Err:509 9.003 6.704 Err:509 233.000 20.000 0.829
6X Err:509 10.587 7.884 Err:509 274.000 20.000 0.705
7X Err:509 9.660 7.194 Err:509 250.000 20.000 0.773
8X Err:509 6.723 5.007 Err:509 174.000 20.000 1.110
9X Err:509 7.689 5.726 Err:509 199.000 20.000 0.971
10X Err:509 9.660 7.194 Err:509 250.000 20.000 0.773
11X Err:509 3.825 2.849 Err:509 99.000 20.000 1.951
12X Err:509 3.864 2.877 Err:509 100.000 20.000 1.932
13X Err:509 7.728 5.755 Err:509 200.000 20.000 0.966
14X Err:509 8.655 6.445 Err:509 224.000 20.000 0.862
15X Err:509 3.864 2.877 Err:509 100.000 20.000 1.932
16X Err:509 3.864 2.877 Err:509 100.000 20.000 1.932
0 Err:509 0.000 0.000 Err:509 0.000 0.000 #DIV/0!

TOTAL

MURO V P(D) P(L) Vact L(cm) t(cm) Fd

1Y Err:509 13.524 10.071 Err:509 350.000 20.000 0.552


2Y Err:509 13.524 10.071 Err:509 350.000 20.000 0.552
3Y Err:509 4.869 3.626 Err:509 126.000 20.000 1.533
4Y Err:509 7.766 5.784 Err:509 201.000 20.000 0.961
5Y Err:509 9.621 7.165 Err:509 249.000 20.000 0.776
6Y Err:509 8.694 6.474 Err:509 225.000 20.000 0.859
7Y Err:509 13.524 10.071 Err:509 350.000 20.000 0.552
8Y Err:509 4.869 3.626 Err:509 126.000 20.000 1.533
9Y Err:509 4.869 3.626 Err:509 126.000 20.000 1.533
10Y Err:509 11.592 8.632 Err:509 300.000 20.000 0.644
11Y Err:509 11.592 8.632 Err:509 300.000 20.000 0.644
12Y Err:509 7.689 5.726 Err:509 199.000 20.000 0.971

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

0 Err:509 11.592 8.632 Err:509 300.000 20.000 0.644

0
TOTAL

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

Vadm con cal V correcto

1.998 Err:509
1.999 Err:509
1.999 Err:509
2.148 Err:509
1.949 Err:509
1.927 Err:509
1.939 Err:509
2.000 Err:509
1.975 Err:509
1.939 Err:509
2.151 Err:509
2.148 Err:509
1.974 Err:509
1.955 Err:509
2.148 Err:509
2.148 Err:509
#DIV/0! #DIV/0!

Vadm con cal V correcto

1.899 Err:509
1.899 Err:509
2.076 Err:509
1.973 Err:509
1.940 Err:509
1.955 Err:509
1.899 Err:509
2.076 Err:509
2.076 Err:509
1.916 Err:509
1.916 Err:509
1.975 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

1.916 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
ACERO CORTANTE TOTAL DEL SEGUNDO PISO
MURO fy L r L (L-r) t f'm PD Pu = (70%PD) Mu (tn)

1X 4200 176.000 8.00 160.000 20 118 6.800 4.760 Err:509


2X 4200 175.000 8.00 159.000 20 118 6.762 4.733 Err:509
3X 4200 175.000 8.00 159.000 20 118 6.762 4.733 Err:509
4X 4200 100.000 8.00 84.000 20 118 3.864 2.705 Err:509
5X 4200 233.000 8.00 217.000 20 118 9.003 6.302 Err:509
6X 4200 274.000 8.00 258.000 20 118 10.587 7.411 Err:509
7X 4200 250.000 8.00 234.000 20 118 9.660 6.762 Err:509
8X 4200 174.000 8.00 158.000 20 118 6.723 4.706 Err:509
9X 4200 199.000 8.00 183.000 20 118 7.689 5.382 Err:509
10X 4200 250.000 8.00 234.000 20 118 9.660 6.762 Err:509
11X 4200 99.000 8.00 83.000 20 118 3.825 2.678 Err:509
12X 4200 100.000 8.00 84.000 20 118 3.864 2.705 Err:509
13X 4200 200.000 8.00 184.000 20 118 7.728 5.409 Err:509
14X 4200 224.000 8.00 208.000 20 118 8.655 6.059 Err:509
15X 4200 100.000 8.00 84.000 20 118 3.864 2.705 Err:509
16X 4200 100.000 8.00 84.000 20 118 3.864 2.705 Err:509
0 4200 0.000 8.00 -16.000 0 118 0.000 0.000 Err:509

MURO fy L r L (L-r) t f'm PD Pu = (70%PD) Mu


1Y 4200 350 8.00 334.000 0 118 13.524 9.467 Err:509
2Y 4200 350 8.00 334.000 0 118 13.524 9.467 Err:509
3Y 4200 126 8.00 110.000 0 118 4.869 3.408 Err:509
4Y 4200 201 8.00 185.000 0 118 7.766 5.436 Err:509
5Y 4200 249 8.00 233.000 0 118 9.621 6.735 Err:509
6Y 4200 225 8.00 209.000 0 118 8.694 6.086 Err:509
7Y 4200 350 8.00 334.000 0 118 13.524 9.467 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
8Y 4200 126 8.00 110.000 0 118 4.869 3.408 Err:509
9Y 4200 126 8.00 110.000 0 118 4.869 3.408 Err:509
10Y 4200 300 8.00 284.000 0 118 11.592 8.114 Err:509
11Y 4200 300 8.00 284.000 0 118 11.592 8.114 Err:509
12Y 4200 199 8.00 183.000 0 118 7.689 5.382 Err:509
0 4200 300 8.00 284.000 0 118 11.592 8.114 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

Ast (cm2) a d ASUMIDO VERIFICACION

Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Ast (cm2) a d ASUMIDO VERIFICACION


Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

DISEÑO POR CORTE SEGUNDO PISO


MURO L(m) V Øf Vu d t(cm) ØS fy S(cm)
1X 176.000 Err:509 0.764 Err:509 140.800 20.000 1.000 4200.000 100.000
2X 175.000 Err:509 0.764 Err:509 140.000 20.000 1.000 4200.000 100.000
3X 175.000 Err:509 0.764 Err:509 140.000 20.000 1.000 4200.000 100.000
4X 100.000 Err:509 0.764 Err:509 80.000 20.000 1.000 4200.000 100.000
5X 233.000 Err:509 0.764 Err:509 186.400 20.000 1.000 4200.000 100.000
6X 274.000 Err:509 0.764 Err:509 219.200 20.000 1.000 4200.000 100.000
7X 250.000 Err:509 0.764 Err:509 200.000 20.000 1.000 4200.000 100.000
8X 174.000 Err:509 0.764 Err:509 139.200 20.000 1.000 4200.000 100.000
9X 199.000 Err:509 0.764 Err:509 159.200 20.000 1.000 4200.000 100.000
10X 250.000 Err:509 0.764 Err:509 200.000 20.000 1.000 4200.000 100.000
11X 99.000 Err:509 0.764 Err:509 79.200 20.000 1.000 4200.000 100.000
12X 100.000 Err:509 0.764 Err:509 80.000 20.000 1.000 4200.000 100.000
13X 200.000 Err:509 0.764 Err:509 160.000 20.000 1.000 4200.000 100.000
14X 224.000 Err:509 0.764 Err:509 179.200 20.000 1.000 4200.000 100.000
15X 100.000 Err:509 0.764 Err:509 80.000 20.000 1.000 4200.000 100.000
16X 100.000 Err:509 0.764 Err:509 80.000 20.000 1.000 4200.000 100.000
0 0.000 Err:509 #DIV/0! Err:509 0.000 0.000 1.000 4200.000 100.000

MURO L(m) V Øf Vu d t(cm) ØS fy S(cm)


1Y 350.000 Err:509 0.724 Err:509 280.000 0.000 1.000 4200.000 100.000
2Y 350.000 Err:509 0.724 Err:509 280.000 0.000 2.000 4200.000 100.000
3Y 126.000 Err:509 0.724 Err:509 100.800 0.000 3.000 4200.000 100.000
4Y 201.000 Err:509 0.724 Err:509 160.800 0.000 4.000 4200.000 100.000
5Y 249.000 Err:509 0.724 Err:509 199.200 0.000 5.000 4200.000 100.000
6Y 225.000 Err:509 0.724 Err:509 180.000 0.000 6.000 4200.000 100.000
7Y 350.000 Err:509 0.724 Err:509 280.000 0.000 7.000 4200.000 100.000
8Y 126.000 Err:509 0.724 Err:509 100.800 0.000 8.000 4200.000 100.000
9Y 126.000 Err:509 0.724 Err:509 100.800 0.000 9.000 4200.000 100.000
10Y 300.000 Err:509 0.724 Err:509 240.000 0.000 10.000 4200.000 100.000
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
11Y 300.000 Err:509 0.724 Err:509 240.000 0.000 11.000 4200.000 100.000
12Y 199.000 Err:509 0.724 Err:509 159.200 0.000 12.000 4200.000 100.000
0 300.000 Err:509 0.724 Err:509 240.000 0.000 13.000 4200.000 100.000

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

VERIFICACIO VARILLAS
AH(cm2) As min N 1/2"
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509

VERIFICACIO VARILLAS
AH(cm2) As min N 1/2"
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
TERCER PISO INCREMENTO DE FUERZAS HORIZONTALES
ALBAÑILERIA ESTRUCTURAL
MURO b L y V r (r)y y-yr r(y-yr) r(y-yr)^2 dV1 dV2
1X 0.150 1.760 Err:509 4.285 6.181 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2X 0.150 1.750 7.880 4.225 6.095 48.029 4.152 25.308 105.085 Err:509 Err:509
3X 0.150 1.750 7.880 4.225 6.095 48.029 4.152 25.308 105.085 Err:509 Err:509
4X 0.150 1.000 7.880 0.963 1.389 10.942 4.152 5.766 23.941 Err:509 Err:509
5X 0.150 2.330 7.880 8.257 11.912 93.866 4.152 49.462 205.378 Err:509 Err:509
6X 0.150 2.740 6.510 11.666 16.830 109.561 2.782 46.825 130.278 Err:509 Err:509
7X 0.150 Err:509 4.380 9.626 13.886 60.819 0.652 9.057 5.908 Err:509 Err:509
8X 0.150 2.500 4.380 9.626 13.886 60.819 0.652 9.057 5.908 Err:509 Err:509
9X 0.150 1.740 4.380 4.166 6.010 26.322 0.652 3.920 2.557 Err:509 Err:509
10X 0.150 1.990 4.380 5.759 8.308 36.389 0.652 5.419 3.535 Err:509 Err:509
11X 0.150 2.500 3.000 9.626 13.886 41.657 -0.728 -10.105 7.354 Err:509 Err:509
12X 0.150 0.990 3.000 0.936 1.350 4.051 -0.728 -0.983 0.715 Err:509 Err:509
13X 0.150 1.000 3.000 0.963 1.389 4.166 -0.728 -1.011 0.735 Err:509 Err:509
14X 0.150 2.000 0.000 5.827 8.406 0.000 -3.728 -31.337 116.817 Err:509 Err:509
15X 0.150 2.240 0.000 7.563 10.910 0.000 -3.728 -40.671 151.610 Err:509 Err:509
16X 0.150 1.000 0.000 0.963 1.389 0.000 -3.728 -5.176 19.296 Err:509 Err:509
0 0.000 1.000 0.000 0.000 0.000 0.000 -3.728 0.000 0.000 Err:509 Err:509

TOTAL 2.400 Err:509 Err:509 88.675 127.920 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

MURO b L x V r (r^2)x x-xr r(x-xr) r(x-xr)^2 dV1 dV2


1Y 0.150 3.500 0.000 16.349 26.996 0.000 -4.142 -111.819 463.168 Err:509 Err:509
2Y 0.150 Err:509 3.870 1.583 2.613 10.113 -0.272 -0.711 0.193 Err:509 Err:509
3Y 0.150 1.260 3.870 1.583 2.613 10.113 -0.272 -0.711 0.193 Err:509 Err:509
4Y 0.150 2.010 5.240 5.151 8.506 44.569 1.098 9.338 10.252 Err:509 Err:509
5Y 0.150 2.490 7.740 8.337 13.767 106.555 3.598 49.532 178.209 Err:509 Err:509
6Y 0.150 2.250 10.760 6.674 11.020 118.576 6.618 72.929 482.637 Err:509 Err:509
7Y 0.150 3.500 0.000 16.349 26.996 0.000 -4.142 -111.819 463.168 Err:509 Err:509
8Y 0.150 1.260 10.760 1.583 2.613 28.117 6.618 17.294 114.446 Err:509 Err:509
9Y 0.150 1.260 0.000 1.583 2.613 0.000 -4.142 -10.824 44.834 Err:509 Err:509
10Y 0.150 3.000 3.120 12.226 20.188 62.986 -1.022 -20.634 21.091 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

11Y 0.150 3.000 6.740 12.226 20.188 136.065 2.598 52.445 136.247 Err:509 Err:509
12Y 0.150 1.990 10.760 5.031 8.308 89.393 6.618 54.981 363.856 Err:509 Err:509
0 0.000 3.000 0.000 0.000 0.000 0.000 -4.142 0.000 0.000 Err:509 Err:509

0.000 0.000
TOTAL 1.500 Err:509 45.360 71.417 117.924 381.029 3.939 -107.426 1778.192 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
INCREMENTO DE FUERZAS HORIZONTALES
ALBAÑILERIA ESTRUCTURAL
V1 V2 V
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

V1 V2 V
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

FUERZAS VERTICALES DE GRAVEDAD SOBRE CADA MURO

TERCER PISO ###


PESO DE TECHOS 107464.96
PESO DE MUROS 78894.00
LONGITUD TOTAL DE MUROS 58.44
WD 3.19 Tn
WL 0.372 Tn
*CARGAS CONSTANTES SOBRE LOS MUROS DEL TERCER PISO

MURO V P(D) P(L) Vact L(cm) t(cm) Fd

1X Err:509 5.612 2.090 Err:509 176.000 15.000 1.208


2X Err:509 5.581 2.078 Err:509 175.000 15.000 1.215
3X Err:509 5.581 2.078 Err:509 175.000 15.000 1.215
4X Err:509 3.189 1.187 Err:509 100.000 15.000 2.126
5X Err:509 7.430 2.767 Err:509 233.000 15.000 0.912
6X Err:509 8.738 3.253 Err:509 274.000 15.000 2.126
7X Err:509 7.972 2.968 Err:509 250.000 15.000 2.126
8X Err:509 5.549 2.066 Err:509 174.000 15.000 2.126
9X Err:509 6.346 2.363 Err:509 199.000 15.000 2.126
10X Err:509 7.972 2.968 Err:509 250.000 15.000 0.850
11X Err:509 3.157 1.176 Err:509 99.000 15.000 2.147
12X Err:509 3.189 1.187 Err:509 100.000 15.000 2.126
13X Err:509 6.378 2.375 Err:509 200.000 15.000 2.126
14X Err:509 7.143 2.660 Err:509 224.000 15.000 2.126
15X Err:509 3.189 1.187 Err:509 100.000 15.000 2.126
16X Err:509 3.189 1.187 Err:509 100.000 15.000 2.126
0 Err:509 0.000 0.000 Err:509 0.000 0.000 #DIV/0!

TOTAL

MURO V P(D) P(L) Vact L(cm) t(cm) Fd

1Y Err:509 11.161 4.156 Err:509 350.000 15.000 2.126


2Y Err:509 11.161 4.156 Err:509 350.000 15.000 2.126
3Y Err:509 4.018 1.496 Err:509 126.000 15.000 2.126
4Y Err:509 6.410 2.387 Err:509 201.000 15.000 2.126
5Y Err:509 7.940 2.957 Err:509 249.000 15.000 2.126
6Y Err:509 7.175 2.672 Err:509 225.000 15.000 2.126
7Y Err:509 11.161 4.156 Err:509 350.000 15.000 2.126
8Y Err:509 4.018 1.496 Err:509 126.000 15.000 2.126
9Y Err:509 4.018 1.496 Err:509 126.000 15.000 2.126
10Y Err:509 9.567 3.562 Err:509 300.000 15.000 2.126
11Y Err:509 9.567 3.562 Err:509 300.000 15.000 2.126
12Y Err:509 6.346 2.363 Err:509 199.000 15.000 2.126

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

0 Err:509 9.567 3.562 Err:509 300.000 0.000 #DIV/0!

TOTAL

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

Vadm con cal V correcto

2.017 Err:509
2.019 Err:509
2.019 Err:509
2.183 Err:509
1.964 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
1.953 Err:509
2.187 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
#DIV/0! #DIV/0!

Vadm con cal V correcto

2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509
2.183 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

#DIV/0! #DIV/0!

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

DISEÑO POR FLEXION TERCER PISO


MURO PD PL PU L t fm f'm
1X 5.612 2.090 11.553 176.000 20.000 3.282 11.8
2X 5.581 2.078 11.488 175.000 20.000 3.282 11.8
3X 5.581 2.078 11.488 175.000 20.000 3.282 11.8
4X 3.189 1.187 6.564 100.000 20.000 3.282 11.8
5X 7.430 2.767 15.295 233.000 20.000 3.282 11.8
6X 8.738 3.253 17.986 274.000 20.000 3.282 11.8
7X 7.972 2.968 16.411 250.000 20.000 3.282 11.8
8X 5.549 2.066 11.422 174.000 20.000 3.282 11.8
9X 6.346 2.363 13.063 199.000 20.000 3.282 11.8
10X 7.972 2.968 16.411 250.000 20.000 3.282 11.8
11X 3.157 1.176 6.499 99.000 20.000 3.282 11.8
12X 3.189 1.187 6.564 100.000 20.000 3.282 11.8
13X 6.378 2.375 13.129 200.000 20.000 3.282 11.8
14X 7.143 2.660 14.704 224.000 20.000 3.282 11.8
15X 3.189 1.187 6.564 100.000 20.000 3.282 11.8
16X 3.189 1.187 6.564 100.000 20.000 3.282 11.8
0 0.000 0.000 0.000 0.000 0.000 #DIV/0! 11.8

MURO PD PL PU L t fm f'm
1Y 11.161 4.156 22.975 350.000 20 3.282 11.8
2Y 11.161 4.156 22.975 350.000 20 3.282 11.8
3Y 4.018 1.496 8.271 126.000 20 3.282 11.8
4Y 6.410 2.387 13.194 201.000 20 3.282 11.8
5Y 7.940 2.957 16.345 249.000 20 3.282 11.8
6Y 7.175 2.672 14.770 225.000 20 3.282 11.8
7Y 11.161 4.156 22.975 350.000 20 3.282 11.8
8Y 4.018 1.496 8.271 126.000 20 3.282 11.8
9Y 4.018 1.496 8.271 126.000 20 3.282 11.8
10Y 9.567 3.562 19.693 300.000 20 3.282 11.8
11Y 9.567 3.562 19.693 300.000 20 3.282 11.8
12Y 6.346 2.363 13.063 199.000 20 3.282 11.8
0 9.567 3.562 19.693 300.000 20 3.282 11.8

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

O POR FLEXION TERCER PISO


VERFICACION Øf Mu
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
#DIV/0! #DIV/0! Err:509

VERFICACION Øf Mu
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509
OK!!!! 0.794 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
ACERO CORTANTE TOTAL TERCER PISO
MURO fy L r L (L-r) t f'm PD Pu = (70%PD) Mu (tn) Ast (cm2) a
1X 4200 176.000 8.00 160.000 20 118 5.612 3.929 Err:509 Err:509 Err:509
2X 4200 175.000 8.00 159.000 20 118 5.581 3.906 Err:509 Err:509 Err:509
3X 4200 175.000 8.00 159.000 20 118 5.581 3.906 Err:509 Err:509 Err:509
4X 4200 100.000 8.00 84.000 20 118 3.189 2.232 Err:509 Err:509 Err:509
5X 4200 233.000 8.00 217.000 20 118 7.430 5.201 Err:509 Err:509 Err:509
6X 4200 274.000 8.00 258.000 20 118 8.738 6.116 Err:509 Err:509 Err:509
7X 4200 250.000 8.00 234.000 20 118 7.972 5.581 Err:509 Err:509 Err:509
8X 4200 174.000 8.00 158.000 20 118 5.549 3.884 Err:509 Err:509 Err:509
9X 4200 199.000 8.00 183.000 20 118 6.346 4.442 Err:509 Err:509 Err:509
10X 4200 250.000 8.00 234.000 20 118 7.972 5.581 Err:509 Err:509 Err:509
11X 4200 99.000 8.00 83.000 20 118 3.157 2.210 Err:509 Err:509 Err:509
12X 4200 100.000 8.00 84.000 20 118 3.189 2.232 Err:509 Err:509 Err:509
13X 4200 200.000 8.00 184.000 20 118 6.378 4.464 Err:509 Err:509 Err:509
14X 4200 224.000 8.00 208.000 20 118 7.143 5.000 Err:509 Err:509 Err:509
15X 4200 100.000 8.00 84.000 20 118 3.189 2.232 Err:509 Err:509 Err:509
16X 4200 100.000 8.00 84.000 20 118 3.189 2.232 Err:509 Err:509 Err:509
0 4200 0.000 8.00 -16.000 0 118 0.000 0.000 Err:509 Err:509 Err:509

MURO fy L r L (L-r) t f'm PD Pu = (70%PD) Mu Ast (cm2) a


1Y 4200 350 8.00 334.000 20 118 11.161 7.813 Err:509 Err:509 Err:509
2Y 4200 350 8.00 334.000 20 118 11.161 7.813 Err:509 Err:509 Err:509
3Y 4200 126 8.00 110.000 20 118 4.018 2.813 Err:509 Err:509 Err:509
4Y 4200 201 8.00 185.000 20 118 6.410 4.487 Err:509 Err:509 Err:509
5Y 4200 249 8.00 233.000 20 118 7.940 5.558 Err:509 Err:509 Err:509
6Y 4200 225 8.00 209.000 20 118 7.175 5.023 Err:509 Err:509 Err:509
7Y 4200 350 8.00 334.000 20 118 11.161 7.813 Err:509 Err:509 Err:509
8Y 4200 126 8.00 110.000 20 118 4.018 2.813 Err:509 Err:509 Err:509
9Y 4200 126 8.00 110.000 20 118 4.018 2.813 Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
10Y 4200 300 8.00 284.000 20 118 9.567 6.697 Err:509 Err:509 Err:509
11Y 4200 300 8.00 284.000 20 118 9.567 6.697 Err:509 Err:509 Err:509
12Y 4200 199 8.00 183.000 20 118 6.346 4.442 Err:509 Err:509 Err:509
0 4200 300 8.00 284.000 20 118 9.567 6.697 Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
ORTANTE TOTAL TERCER PISO
d ASUMIDO VERIFICACION
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

d ASUMIDO VERIFICACION
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

DISEÑO POR CORTE TERCER PISO

MURO L(m) V Øf Vu d t(cm) ØS fy S(cm)


1X 176.000 Err:509 0.794 Err:509 140.800 20.000 1.000 4200.000 100.000
2X 175.000 Err:509 0.794 Err:509 140.000 20.000 1.000 4200.000 100.000
3X 175.000 Err:509 0.794 Err:509 140.000 20.000 1.000 4200.000 100.000
4X 100.000 Err:509 0.794 Err:509 80.000 20.000 1.000 4200.000 100.000
5X 233.000 Err:509 0.794 Err:509 186.400 20.000 1.000 4200.000 100.000
6X 274.000 Err:509 0.794 Err:509 219.200 20.000 1.000 4200.000 100.000
7X 250.000 Err:509 0.794 Err:509 200.000 20.000 1.000 4200.000 100.000
8X 174.000 Err:509 0.794 Err:509 139.200 20.000 1.000 4200.000 100.000
9X 199.000 Err:509 0.794 Err:509 159.200 20.000 1.000 4200.000 100.000
10X 250.000 Err:509 0.794 Err:509 200.000 20.000 1.000 4200.000 100.000
11X 99.000 Err:509 0.794 Err:509 79.200 20.000 1.000 4200.000 100.000
12X 100.000 Err:509 0.794 Err:509 80.000 20.000 1.000 4200.000 100.000
13X 200.000 Err:509 0.794 Err:509 160.000 20.000 1.000 4200.000 100.000
14X 224.000 Err:509 0.794 Err:509 179.200 20.000 1.000 4200.000 100.000
15X 100.000 Err:509 0.794 Err:509 80.000 20.000 1.000 4200.000 100.000
16X 100.000 Err:509 0.794 Err:509 80.000 20.000 1.000 4200.000 100.000
0 0.000 Err:509 #DIV/0! Err:509 0.000 0.000 1.000 4200.000 100.000

MURO L(m) V Øf Vu d t(cm) ØS fy S(cm)

1Y 350.000 Err:509 0.794 Err:509 280.000 20.000 1.000 4200.000 100.000


2Y 350.000 Err:509 0.794 Err:509 280.000 20.000 2.000 4200.000 100.000
3Y 126.000 Err:509 0.794 Err:509 100.800 20.000 3.000 4200.000 100.000
4Y 201.000 Err:509 0.794 Err:509 160.800 20.000 4.000 4200.000 100.000
5Y 249.000 Err:509 0.794 Err:509 199.200 20.000 5.000 4200.000 100.000
6Y 225.000 Err:509 0.794 Err:509 180.000 20.000 6.000 4200.000 100.000
7Y 350.000 Err:509 0.794 Err:509 280.000 20.000 7.000 4200.000 100.000

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

8Y 126.000 Err:509 0.794 Err:509 100.800 20.000 8.000 4200.000 100.000


9Y 126.000 Err:509 0.794 Err:509 100.800 20.000 9.000 4200.000 100.000
10Y 300.000 Err:509 0.794 Err:509 240.000 20.000 10.000 4200.000 100.000
11Y 300.000 Err:509 0.794 Err:509 240.000 20.000 11.000 4200.000 100.000
12Y 199.000 Err:509 0.794 Err:509 159.200 20.000 12.000 4200.000 100.000
0 300.000 Err:509 0.794 Err:509 240.000 20.000 13.000 4200.000 100.000

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

AH(cm2) As min VERIFICACION


VARILLAS 1/2"
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 0.000 Err:509 Err:509

AH(cm2) As min VERIFICACION


VARILLAS 1/2"
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

Err:509 2.000 Err:509 Err:509


Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509
Err:509 2.000 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
CUARTO PISO INCREMENTO DE FUERZAS HORIZONTALES
MURO b L y V r (r)y y-yr r(y-yr) r(y-yr)^2 dV1 dV2
1X 0.150 1.760 Err:509 2.448 6.181 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2X 0.150 1.750 7.880 2.414 6.095 48.029 4.152 25.308 105.085 Err:509 Err:509
3X 0.150 1.750 7.880 2.414 6.095 48.029 4.152 25.308 105.085 Err:509 Err:509
4X 0.150 1.000 7.880 0.550 1.389 10.942 4.152 5.766 23.941 Err:509 Err:509
5X 0.150 2.330 7.880 4.719 11.912 93.866 4.152 49.462 205.378 Err:509 Err:509
6X 0.150 2.740 6.510 6.667 16.830 109.561 2.782 46.825 130.278 Err:509 Err:509
7X 0.150 Err:509 4.380 5.500 13.886 60.819 0.652 9.057 5.908 Err:509 Err:509
8X 0.150 2.500 4.380 5.500 13.886 60.819 0.652 9.057 5.908 Err:509 Err:509
9X 0.150 1.740 4.380 2.380 6.010 26.322 0.652 3.920 2.557 Err:509 Err:509
10X 0.150 1.990 4.380 3.291 8.308 36.389 0.652 5.419 3.535 Err:509 Err:509
11X 0.150 2.500 3.000 5.500 13.886 41.657 -0.728 -10.105 7.354 Err:509 Err:509
12X 0.150 0.990 3.000 0.535 1.350 4.051 -0.728 -0.983 0.715 Err:509 Err:509
13X 0.150 1.000 3.000 0.550 1.389 4.166 -0.728 -1.011 0.735 Err:509 Err:509
14X 0.150 2.000 0.000 3.330 8.406 0.000 -3.728 -31.337 116.817 Err:509 Err:509
15X 0.150 2.240 0.000 4.322 10.910 0.000 -3.728 -40.671 151.610 Err:509 Err:509
16X 0.150 1.000 0.000 0.550 1.389 0.000 -3.728 -5.176 19.296 Err:509 Err:509
0 0.000 1.000 0.000 0.000 0.000 0.000 -3.728 0.000 0.000 Err:509 Err:509

TOTAL 2.400 Err:509 Err:509 50.671 127.920 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

MURO b L x V r (r)x x-xr r(x-xr) r(x-xr)^2 dV1 dV2


1Y 0.150 3.500 0.000 9.342 26.996 0.000 -4.142 -111.819 463.168 Err:509 Err:509
2Y 0.150 Err:509 3.870 0.904 2.613 10.113 -0.272 -0.711 0.193 Err:509 Err:509
3Y 0.150 1.260 3.870 0.904 2.613 10.113 -0.272 -0.711 0.193 Err:509 Err:509
4Y 0.150 2.010 5.240 2.944 8.506 44.569 1.098 9.338 10.252 Err:509 Err:509
5Y 0.150 2.490 7.740 4.764 13.767 106.555 3.598 49.532 178.209 Err:509 Err:509
6Y 0.150 2.250 10.760 3.814 11.020 118.576 6.618 72.929 482.637 Err:509 Err:509
7Y 0.150 3.500 0.000 9.342 26.996 0.000 -4.142 -111.819 463.168 Err:509 Err:509
8Y 0.150 1.260 10.760 0.904 2.613 28.117 6.618 17.294 114.446 Err:509 Err:509
9Y 0.150 1.260 0.000 0.904 2.613 0.000 -4.142 -10.824 44.834 Err:509 Err:509
10Y 0.150 3.000 3.120 6.986 20.188 62.986 -1.022 -20.634 21.091 Err:509 Err:509
11Y 0.150 3.000 6.740 6.986 20.188 136.065 2.598 52.445 136.247 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
12Y 0.150 1.990 10.760 2.875 8.308 89.393 6.618 54.981 363.856 Err:509 Err:509
0 0.000 3.000 0.000 0.000 0.000 0.000 -4.142 0.000 0.000 Err:509 Err:509

TOTAL 1.800 Err:509 62.860 50.671 146.420 606.487 9.012 0.000 2278.294 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
INCREMENTO DE FUERZAS HORIZONTALES
V1 V2 V
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

V1 V2 V
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

FUERZAS VERTICALES DE GRAVEDAD SOBRE CADA MURO

CUARTO PISO ###


PESO DE TECHOS 107464.96
PESO DE MUROS 39447.00
LONGITUD TOTAL DE MUROS 58.44
WD 2.51 Tn
WL 0.000 Tn
*CARGAS CONSTANTES SOBRE LOS MUROS DEL CUARTO PISO

MURO V P(D) P(L) Vact L(cm) t(cm) Fd

1X Err:509 4.424 0.000 Err:509 176.000 15.000 1.676


2X Err:509 4.399 0.000 Err:509 175.000 15.000 1.676
3X Err:509 4.399 0.000 Err:509 175.000 15.000 1.676
4X Err:509 2.514 0.000 Err:509 100.000 15.000 1.676
5X Err:509 5.857 0.000 Err:509 233.000 15.000 1.676
6X Err:509 6.888 0.000 Err:509 274.000 15.000 1.676
7X Err:509 6.285 0.000 Err:509 250.000 15.000 1.676
8X Err:509 4.374 0.000 Err:509 174.000 15.000 1.676
9X Err:509 5.003 0.000 Err:509 199.000 15.000 1.676
10X Err:509 6.285 0.000 Err:509 250.000 15.000 1.676
11X Err:509 2.489 0.000 Err:509 99.000 15.000 1.676
12X Err:509 2.514 0.000 Err:509 100.000 15.000 1.676
13X Err:509 5.028 0.000 Err:509 200.000 15.000 1.676
14X Err:509 5.631 0.000 Err:509 224.000 15.000 1.676
15X Err:509 2.514 0.000 Err:509 100.000 15.000 1.676
16X Err:509 2.514 0.000 Err:509 100.000 15.000 1.676
0 Err:509 0.000 0.000 Err:509 0.000 0.000 #DIV/0!

TOTAL

MURO V P(D) P(L) Vact L(cm) t(cm) Fd

1Y Err:509 8.799 0.000 Err:509 350.000 15.000 1.676


2Y Err:509 8.799 0.000 Err:509 350.000 15.000 1.676
3Y Err:509 3.168 0.000 Err:509 126.000 15.000 1.676
4Y Err:509 5.053 0.000 Err:509 201.000 15.000 1.676
5Y Err:509 6.260 0.000 Err:509 249.000 15.000 1.676
6Y Err:509 5.656 0.000 Err:509 225.000 15.000 1.676
7Y Err:509 8.799 0.000 Err:509 350.000 15.000 1.676
8Y Err:509 3.168 0.000 Err:509 126.000 15.000 1.676
9Y Err:509 3.168 0.000 Err:509 126.000 15.000 1.676
10Y Err:509 7.542 0.000 Err:509 300.000 15.000 1.676
11Y Err:509 7.542 0.000 Err:509 300.000 15.000 1.676
12Y Err:509 5.003 0.000 Err:509 199.000 15.000 1.676

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

0 Err:509 7.542 0.000 Err:509 300.000 0.000 #DIV/0!

TOTAL

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

Vadm con cal V correcto

2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
#DIV/0! #DIV/0!

Vadm con cal V correcto

2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509
2.102 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

#DIV/0! #DIV/0!

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

DISEÑO POR FLEXION CUARTO PISO


MURO PD PL PU L t fm f'm
1X 4.424 Err:509 Err:509 176.000 20.000 Err:509 11.8
2X 4.399 Err:509 Err:509 175.000 20.000 Err:509 11.8
3X 4.399 Err:509 Err:509 175.000 20.000 Err:509 11.8
4X 2.514 Err:509 Err:509 100.000 20.000 Err:509 11.8
5X 5.857 Err:509 Err:509 233.000 20.000 Err:509 11.8
6X 6.888 Err:509 Err:509 274.000 20.000 Err:509 11.8
7X 6.285 Err:509 Err:509 250.000 20.000 Err:509 11.8
8X 4.374 Err:509 Err:509 174.000 20.000 Err:509 11.8
9X 5.003 Err:509 Err:509 199.000 20.000 Err:509 11.8
10X 6.285 Err:509 Err:509 250.000 20.000 Err:509 11.8
11X 2.489 Err:509 Err:509 99.000 20.000 Err:509 11.8
12X 2.514 Err:509 Err:509 100.000 20.000 Err:509 11.8
13X 5.028 Err:509 Err:509 200.000 20.000 Err:509 11.8
14X 5.631 Err:509 Err:509 224.000 20.000 Err:509 11.8
15X 2.514 Err:509 Err:509 100.000 20.000 Err:509 11.8
16X 2.514 Err:509 Err:509 100.000 20.000 Err:509 11.8
0 0.000 Err:509 Err:509 0.000 0.000 Err:509 11.8

MURO PD PL PU L t fm f'm
1Y 8.799 Err:509 Err:509 350.000 20 Err:509 11.8
2Y 8.799 Err:509 Err:509 350.000 20 Err:509 11.8
3Y 3.168 Err:509 Err:509 126.000 20 Err:509 11.8
4Y 5.053 Err:509 Err:509 201.000 20 Err:509 11.8
5Y 6.260 Err:509 Err:509 249.000 20 Err:509 11.8
6Y 5.656 Err:509 Err:509 225.000 20 Err:509 11.8
7Y 8.799 Err:509 Err:509 350.000 20 Err:509 11.8
8Y 3.168 Err:509 Err:509 126.000 20 Err:509 11.8
9Y 3.168 Err:509 Err:509 126.000 20 Err:509 11.8
10Y 7.542 Err:509 Err:509 300.000 20 Err:509 11.8
11Y 7.542 Err:509 Err:509 300.000 20 Err:509 11.8
12Y 5.003 Err:509 Err:509 199.000 20 Err:509 11.8
0 7.542 Err:509 Err:509 300.000 20 Err:509 11.8

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

VERFICACION Øf Mu
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

VERFICACION Øf Mu
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
ACERO CORTANTE TOTAL
Pu =
MURO fy L r L (L-r) t f'm PD Mu (tn) Ast (cm2)
(70%PD)
1X 4200 176.000 8.00 160.000 20 118 5.612 3.929 Err:509 Err:509
2X 4200 175.000 8.00 159.000 20 118 5.581 3.906 Err:509 Err:509
3X 4200 175.000 8.00 159.000 20 118 5.581 3.906 Err:509 Err:509
4X 4200 100.000 8.00 84.000 20 118 3.189 2.232 Err:509 Err:509
5X 4200 233.000 8.00 217.000 20 118 7.430 5.201 Err:509 Err:509
6X 4200 274.000 8.00 258.000 20 118 8.738 6.116 Err:509 Err:509
7X 4200 250.000 8.00 234.000 20 118 7.972 5.581 Err:509 Err:509
8X 4200 174.000 8.00 158.000 20 118 5.549 3.884 Err:509 Err:509
9X 4200 199.000 8.00 183.000 20 118 6.346 4.442 Err:509 Err:509
10X 4200 250.000 8.00 234.000 20 118 7.972 5.581 Err:509 Err:509
11X 4200 99.000 8.00 83.000 20 118 3.157 2.210 Err:509 Err:509
12X 4200 100.000 8.00 84.000 20 118 3.189 2.232 Err:509 Err:509
13X 4200 200.000 8.00 184.000 20 118 6.378 4.464 Err:509 Err:509
14X 4200 224.000 8.00 208.000 20 118 7.143 5.000 Err:509 Err:509
15X 4200 100.000 8.00 84.000 20 118 3.189 2.232 Err:509 Err:509
16X 4200 100.000 8.00 84.000 20 118 3.189 2.232 Err:509 Err:509
0 4200 0.000 8.00 -16.000 0 118 0.000 0.000 Err:509 Err:509

Pu =
MURO fy L r L (L-r) t f'm PD Mu Ast (cm2)
(70%PD)
1Y 4200 350 8.00 334.000 20 118 8.799 6.159 Err:509 Err:509
2Y 4200 350 8.00 334.000 20 118 8.799 6.159 Err:509 Err:509
3Y 4200 126 8.00 110.000 20 118 3.168 2.217 Err:509 Err:509
4Y 4200 201 8.00 185.000 20 118 5.053 3.537 Err:509 Err:509
5Y 4200 249 8.00 233.000 20 118 6.260 4.382 Err:509 Err:509
6Y 4200 225 8.00 209.000 20 118 5.656 3.959 Err:509 Err:509
7Y 4200 350 8.00 334.000 20 118 8.799 6.159 Err:509 Err:509
8Y 4200 126 8.00 110.000 20 118 3.168 2.217 Err:509 Err:509
9Y 4200 126 8.00 110.000 20 118 3.168 2.217 Err:509 Err:509
10Y 4200 300 8.00 284.000 20 118 7.542 5.279 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
11Y 4200 300 8.00 ALBAÑILERIA
284.000 20 ESTRUCTURAL
118 7.542 5.279 Err:509 Err:509
12Y 4200 199 8.00 183.000 20 118 5.003 3.502 Err:509 Err:509
0 4200 300 8.00 284.000 20 118 7.542 5.279 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ACERO CORTANTE TOTAL ALBAÑILERIA ESTRUCTURAL
a d ASUMIDO VERIFICACIO
N
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

a d ASUMIDO VERIFICACIO
N
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA
Err:509 ESTRUCTURAL
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
FACULTAD DE INGENIERIA
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

DISEÑO POR CORTE CUARTO PISO


MURO L(m) V Øf Vu d t(cm) ØS fy S(cm) AH(cm2)
1X 176.000 Err:509 Err:509 Err:509 140.800 20.000 1.000 4200.000 100.000 Err:509
2X 175.000 Err:509 Err:509 Err:509 140.000 20.000 1.000 4200.000 100.000 Err:509
3X 175.000 Err:509 Err:509 Err:509 140.000 20.000 1.000 4200.000 100.000 Err:509
4X 100.000 Err:509 Err:509 Err:509 80.000 20.000 1.000 4200.000 100.000 Err:509
5X 233.000 Err:509 Err:509 Err:509 186.400 20.000 1.000 4200.000 100.000 Err:509
6X 274.000 Err:509 Err:509 Err:509 219.200 20.000 1.000 4200.000 100.000 Err:509
7X 250.000 Err:509 Err:509 Err:509 200.000 20.000 1.000 4200.000 100.000 Err:509
8X 174.000 Err:509 Err:509 Err:509 139.200 20.000 1.000 4200.000 100.000 Err:509
9X 199.000 Err:509 Err:509 Err:509 159.200 20.000 1.000 4200.000 100.000 Err:509
10X 250.000 Err:509 Err:509 Err:509 200.000 20.000 1.000 4200.000 100.000 Err:509
11X 99.000 Err:509 Err:509 Err:509 79.200 20.000 1.000 4200.000 100.000 Err:509
12X 100.000 Err:509 Err:509 Err:509 80.000 20.000 1.000 4200.000 100.000 Err:509
13X 200.000 Err:509 Err:509 Err:509 160.000 20.000 1.000 4200.000 100.000 Err:509
14X 224.000 Err:509 Err:509 Err:509 179.200 20.000 1.000 4200.000 100.000 Err:509
15X 100.000 Err:509 Err:509 Err:509 80.000 20.000 1.000 4200.000 100.000 Err:509
16X 100.000 Err:509 Err:509 Err:509 80.000 20.000 1.000 4200.000 100.000 Err:509
0 0.000 Err:509 Err:509 Err:509 0.000 0.000 1.000 4200.000 100.000 Err:509

MURO L(m) V Øf Vu d t(cm) ØS fy S(cm) AH(cm2)

1Y 350.000 Err:509 Err:509 Err:509 280.000 20.000 1.000 4200.000 100.000 Err:509
2Y 350.000 Err:509 Err:509 Err:509 280.000 20.000 2.000 4200.000 100.000 Err:509
3Y 126.000 Err:509 Err:509 Err:509 100.800 20.000 3.000 4200.000 100.000 Err:509
4Y 201.000 Err:509 Err:509 Err:509 160.800 20.000 4.000 4200.000 100.000 Err:509
5Y 249.000 Err:509 Err:509 Err:509 199.200 20.000 5.000 4200.000 100.000 Err:509
6Y 225.000 Err:509 Err:509 Err:509 180.000 20.000 6.000 4200.000 100.000 Err:509
7Y 350.000 Err:509 Err:509 Err:509 280.000 20.000 7.000 4200.000 100.000 Err:509
8Y 126.000 Err:509 Err:509 Err:509 100.800 20.000 8.000 4200.000 100.000 Err:509
ALVAREZ SUAREZ CRISTHIAN ALBAÑILERIA ESTRUCTURAL
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
FACULTAD DE INGENIERIA
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

9Y 126.000 Err:509 Err:509 Err:509 100.800 20.000 9.000 4200.000 100.000 Err:509
10Y 300.000 Err:509 Err:509 Err:509 240.000 20.000 10.000 4200.000 100.000 Err:509
11Y 300.000 Err:509 Err:509 Err:509 240.000 20.000 11.000 4200.000 100.000 Err:509
12Y 199.000 Err:509 Err:509 Err:509 159.200 20.000 12.000 4200.000 100.000 Err:509
0 300.000 Err:509 Err:509 Err:509 240.000 20.000 13.000 4200.000 100.000 Err:509

ALVAREZ SUAREZ CRISTHIAN ALBAÑILERIA ESTRUCTURAL


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
FACULTAD DE INGENIERIA
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

DISEÑO POR CORTE CUARTO PISO


VERIFICACIO VARILLAS
As min N 1/2"
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
0.000 Err:509 Err:509

VERIFICACIO VARILLAS
As min N 1/2"
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
ALVAREZ SUAREZ CRISTHIAN ALBAÑILERIA ESTRUCTURAL
UNIVERSIDAD TECNOLOGICA DE LOS ANDES
FACULTAD DE INGENIERIA
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

2.000 Err:509 Err:509


2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509
2.000 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN ALBAÑILERIA ESTRUCTURAL


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

DATOS
Øf Err:509
K 1.25
PU 1600

ALFERIZER H L T W M Mu As
1'X 1.00 0.57 0.15 136.80 68.4 Err:509 Err:509
2'X 1.00 0.57 0.15 136.80 68.4 Err:509 Err:509

1'Y 1.00 0.87 0.15 208.80 104.4 Err:509 Err:509


2'Y 1.00 0.91 0.15 218.40 109.2 Err:509 Err:509
3'Y 1.00 0.88 0.15 211.20 105.6 Err:509 Err:509
4'Y 1.00 1.71 0.15 410.40 205.2 Err:509 Err:509
5'Y 1.70 1.23 0.15 501.84 725.2 Err:509 Err:509

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

DISEÑO DE LOSA ARMADA


ESPESOR DE LA LOSA
Bx 4.02
Ly 3.12

P 14.28
E 0.18

METRADO

PESO PROPIO + PISO TERMINADO 0.53 Tn/m2


S/C 0.20 Tn/m2

Wu 1.08 Tn/m2

i1 0
i2 0.5
i3 0.5
i4 0

i1 i3 a ar
0 0.5 3.12 2.805

i2 i4 b br
0.5 0 4.02 3.614

ar br

2.805 3.614
Wu 1.08 Tn/m2
Mu 0.446 Tn.m/m

CALCULO DEL ACERO POSITIVO

As 1.786 cm2 2.00 cm2


a 4.585 5.000

VARILLAS DIAMETRO ESPACI…


5.26 0.95 0.14
3.88 1.29 0.21

CALCULO DEL ACERO NEGATIVO

Mu(-) 0.223 tn.m/m


As(-) 0.962 cm2

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

1 Ø 3/8 @ 70 cm 3
1 Ø 1/2 @ 100 cm
6
9.00

Ø 3/8 @ 20 cm
VERIFICAMOS EL ACERO MINIMO DE LA LOSA

As min 2.160 cm2


As calc 1.786 cm2 OK!!!

d 9.00 cm

Vu 11.915 Kg
Ø Vc 765.922 Kg OK!!!

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

9.00

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
CIMENTACION

Bx 4.02
Ly 3.12

WD 3.97 Tn/m2
WL 0.16 Tn/m2

WU 5.83 Tn/m2

W TOTAL 90.74 Tn

REACCION ULTIMA TOTAL

RUT 90.74 Tn
qu2 11
qu1 0.356
87.34

ENTONCES 30.866 OK!!!


MAL!!!
3.57
0.2 0.3
0.5 4.02

CALCULO DEL ACERO SUPERIOR


SECCION X - X'
i1 i3 a ar
0 0.5 4.42 3.97348933

i2 i4 b br
0.5 0 3.52 3.16440779

MU 3.003 Tn.m/m
VALOR ASUMIDO 10.00
AS 6.73 cm2/m 4.02
PERALTE 25.00 cm
RECUBRIMIENTO 7.50 cm

a 10.86 cm2

3 Ø 5/8 @ 18 cm 3.57
2 Ø 3/4 @ 25 cm

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
0.5

SECCION X - X'

3.12

2.67

0.5

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL

0.2
0.5
0.3

2.67 3.12

0.15
0.2 0.5
0.15

0.15 0.2 0.15


0.5

CCION X - X'

qv1

qv2

ALVAREZ SUAREZ CRISTHIAN


UNIVERSIDAD TECNOLOGICA DE LOS ANDES
INGENIERIA CIVIL
ALBAÑILERIA ESTRUCTURAL
0.5

CCION X - X'

qv1

qv2

0.5

ALVAREZ SUAREZ CRISTHIAN

You might also like