GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016


Basic Job
Potential Hazard Control Measure Responsible Person
Sequence
 Obtain correct Permit to Work from eTEC
 Injury / damage as a result of
 Only authorized person allowed
1. Obtain PTW incorrect information Supervisor/ Engineer
 All personals must be TAMIMI-ISD and ETEC inducted
 Unauthorized personal
 All personnel to be project and zone inducted
 Ensure all approved controls and prevention measures are
discussed and JSA discussed with all persons involved in the
 Unauthorized access/egress, work.
2. Tool box talk working platform, Unsafe  All personnel to attend daily toolbox talk prior to the Supervisor/ Engineer
conditions commencement of work.
 All personnel should be wear proper PPE under TAMIMI-ISD
PPE requirement

 Safety induction to new employees, specialized training to


craftsmen
 Risk of injury due to low
 job pre start meeting, tool box meeting
3. Identify work awareness of work activities
 Mandatory use Of PPE’s Supervisor/ Engineer
Area and area condition
 Work area pre inspection
 Unsafe Access
 Provide proper access.

 Risk of Electrical injury due to  Safety induction to all area employees


electrical shock.  Job pre start meeting, tool box meeting
 Electrocution (death due to  Required to maintain proper work distances
3. Overhead powerlines Site Incharge
electrical shock)  Provide proper access
 Burns due to electrical shock  Area should not be wet because Electric hazards can be
 Falls due to electrical shock made worse if the worker, location or equipment is wet

1
GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016


Basic Job
Potential Hazard Control Measure Responsible Person
Sequence
 Area should be clear from any debris
 Improper access  Material must be segregate
 Personal injury  Housekeeping must be done prior to start the job and finished
 Uneven ground pavement the job
4 .Lifting area 
 Bad housekeeping Adequate access.
preparation
 Scattered materials  Ensure area is properly prepared for job
Supervisor/ Engineer
 Slip, trip  Ground pavement must be leveled properly
 Un authorized entry  Provide proper barricades
 Excavations and trenches  Provide signage
 Provided spill tray for flammable oils
 Provide adequate fire extinguisher
 Follow the monthly color code
 Maintain safe distance from Excavation and trenches.

2
GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016


Basic Job
Potential Hazard Control Measure Responsible Person
Sequence
 Pre inspection of crane equipment prior to start the job.
 Personal injury  Ensure crane is third party certified
 Improper access  Follow safe operating procedures
 Sharp edges  Proper supervision from immediate supervisor
 Hand injury  Prepare proper signage and barricade prior to lifting job
 Pinch point  Use PPE’s as per TAMIMI-ISD requirements
 Hit by/hit by objects  Ensure that over head object has properly place and tied off
 Rolling over of stack pipes  Material should be properly stacked
 Slip, trip hazard  Pipes must be in proper place ,and must be in pipe racks
 Improper stacking of pipes  Good house keeping
 Property damage  If working at height must be undergo training of working at
 Falling objects heights
5. Material  Scattered pipe materials  Use fall protection gear
Supervisor/ Engineer
preparation  Fire  Proper segregation of pipes as per sizes
 Fall of height  Ensure proper fire extinguisher is available in the area
 Mechanical failure  Don’t put the hands in between two pipes/objects
 Lifting tackle failure  Ensure sling is third party certified
 Caught in between  Inspect the sling thoroughly prior to use
 Vision blocked  Ensure lifting gear has third party certified and valid
 Ensure lifting gear has no signed of damage, if damage found
don’t use it or replace immediately
 Ensure out rigging pad available and no defects
 Follow monthly color code
 Operation vision must be clear
 Proper communication between operator and Rigger.

 Uneven ground pavement  Ensure crane must third party certified


 Falling objects/pipes  Only competent rigger allowed to performed the job
 Only qualified crane operator can performed the job
6. Lifting work (by  Struck by/hit by
 Ensure the ground pavement level properly Supervisor/ Engineer
means of crane)  Crane overload  Provide proper barricade
 Inadequate access  Provide proper signage
 Crane overturning  Ensure clear visibility between rigger and crane operator
3
GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016


Basic Job
Potential Hazard Control Measure Responsible Person
Sequence
 Property damage
 Mechanical failure  Provide oil spill tray
 Ensure outrigger pad is free of damage
 Uncontrolled movements of
 Ensure proper sling position
lifted pipes/objects
 Inspect lifting gear prior to use
 Improper communication bet.  Lifting gear must third party certified
Crane operator and rigger  Regular inspection of lifting equipments prior to use
 Oil spill  Lifting tackles must have a third party certified and valid
 Slip, trip  Use PPE’s as per TAMIMI-ISD requirements
 Pinch point  Don’t put hands in between two objects/pipes
 Personal injury  Ensure proper access
 Use two tag lines
 Failure of lifting equipment
 No people should stand beneath the lifted object/pipes
 Collision of objects/pipes
 Maintain safe distance from lifted objects/pipes
 Vision blocked  Be sure no overhead objects within boom range
 Caught in between  Crane load chart must strictly followed
 EOT crane movement  Ensure lifted pipes must be in proper and secured to avoid
 Live DSL cable rolling of pipes
 Use wooden wedge block
 Load hit structure
 No person should stay within boom range
 Never sit, stand, walk, work under suspended load
 Ensure no hydraulic leakage of crane
 Maintain safe distance from DSL cables box bar

 Irregular inspection on all  Wire rope shall be provided properly identified for SWL
lifting tackles and manufacturer.
 Shackle improperly  Inspections shall be done by authorized personnel and
7. chain block and maintained and inspected by the safety dep’t. Shall keep the records.
rigging gear 
Supervisor/ Engineer
Wear and tear of wire  Safe working load stamp shall provide by the
ropes manufacturer
 Mechanical failure  Only trained persons may use electric or pneumatic
 Chain block failure tools.

4
GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016


Basic Job
Potential Hazard Control Measure Responsible Person
Sequence
 Over loading of chain  Defective tools or equipment shall not allowed to use
block  Ensure proper rigid mounting
 Improper coordination  Ensure to use PPE
 Falling of lifted pipes  Stay away from lifted loads
 Collapse of loads  Lift the pipes slowly
 Collapse of rigid mounting  Provide sufficient access as possible
 Personal injury  Be sure not to over load the capacity of chain block
 Inadequate access  Be sure not to over load the maximum strength of wire
 Property damages ropes
 Fall from height  Inspect chain blocks before use
 All chain blocks should be 3rd party certified
 Use two tag lines to control load movements
 Use fall protection if working at height
 Only qualified personnel allowed to do the job
 Barricade the area
 Provide proper signage
 all lifting tackles must be 3rd party certified

5
GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016


Basic Job
Potential Hazard Control Measure Responsible Person
Sequence
 Arrange/ stage all the material in neat orderly manner.
 Remove damage, banding, crate material, nails etc. and
 Tripping Hazards
dispose of properly

 Provide trash for work areas means for maintaining.


8. Housekeeping  All containers should be labeled Supervisor/ Engineer
 Waste disposal
 Clean the spill area immediately, and reporting of incident and
 Fire
spillage.
 Slip,Trip,Fall
 Stay away from EOT crane.
 Crushed by EOT crane
 Maintain safe distance from live box bar

Prepared by: Reviewed by: Approved by: Date

HSE Manager Project Manager eTEC Safety Head 26 / 08 / 2014


Muhammad Raza Khan. AMJAD PERVAIZ Jinhan Baek