(Note 1)
630/1A 87F
CT
HV Test Plug
1R x 3C x 150
(900m)
630/1A CT 87F
11kV Isolation SWBD At B-1 Generator
S/S
G Min. 250kVA
Panel-4 : O/G Feeder
Panel-9 : O/G Feeder
TEMPORARY
CABLE
11 KV B-1
SS
(Note 2)
11/3.3kV
2000kVA
3.3 KV B-1
SS
Note
1. VCB shall be in rack-out position.
2. Disconnect the permanent cable and connect Test Generator cable to outgoing
feeder terminal.
TR Diff. Stability Test Diagram
Generator
G Min. 250kVA
574-SWBD-
1004A/B
11kV Isolation (Note 1)
SWBD
at Unit S/S
574-TR-
09/10
11/0.457kV
2000kVA
(Note 4)
87T
(Note 1)
574-SWBD/MCC-1006, 440V SWBD/MCC at Unit
S/S
(Note 2)
(Note 3)
Note
1. Particular VCB/ACB under test shall be in service position and closed.
2. The other CB’s shall be in isolated position.
3. Fault point outside protected zone. (3-phase short circuit)
4. Fault point inside protected zone. (3-phase short circuit)
TR REF Stability Test Diagram
Generator
G Min. 250kVA
574-SWBD-
1004A/B (Note 1)
11kV Isolation
SWBD
at Unit S/S
574-TR-
09/10
11/0.457kV
2000kVA
(Note 4)
64R
(Note 1)
574-SWBD/MCC-1006, 440V SWBD/MCC at Unit
S/S
(Note 2)
(Note 3)
Note
1. Particular VCB/ACB under test shall be in service position and closed.
2. The other CB’s shall be in isolated position.
3. Fault point outside protected zone. (1-phase to earth fault)
4. Fault point inside protected zone. (1-phase to earth fault)