Crane transportation for All HVAC Equipment includes the cost of Re-assambling of
a
Air-Handling units in non access area and Certified crane arrangments..
b Assembly Planning
c Commissioning of HVAC System
d Lettering and Marking
e Preparation of revision plans
1.2 Air lines and installation parts
Supply & Installation of Spiral seam pipes of Aluminum Imported pipe: 24 Mtr with
c
(Imported)
Supply and Installation of Imported Insulated Flexible air pipe 75 Mtr Aprox. with Jublee
d
clamps and round dampers.
Supply and Installation of Airtight shut-off flap in accordance with DIN 1946 : 16.7 Sq.
e
Mtr. And as per qty shown on daring (Imported).
Supply and Installation of Louver flaps: 25 Sq. Mtr and Protective gratings: 17 Sq. Mtr
f
and as per Qty shown on drawing (Imported).
Supply and Installation of Ceiling ducts rectangular/circular: 22 Sq. Mtr Aproz.
g
Lockformer Prime quality machine made for Extract system
Supply and Installation of Fire protection element/BEK-K90 and Fire protection flap FK-
h K90 motorized type (Quantity as per fire damper) with Fusable link certificate complete
in all respect.
i Supply and Installation of Excess pressure louvers: 9 Sq. m.
Supply and Installation of Ceiling air outlet: 25 Sq. Mtr Aprox.and Ventilation gratings: 5
k
Sq.Mtr Aprox. As per specifications and stadard. (Imported)
c Supply and Installation of cold water buffer tank with all following accessories.
a) Buffer Tank
b) Inlet & Out Let Valves
c) Balancing Valves
d) Heat Exchanger (Plate Type) Imported.
e) Buffer tank insulation.
f) Buffer tank cladding.
g) Pressure gauges.115mm dial, 4 Nos, Make USA
h) Pipe Line Thermometers. Min 90mm stem, 225mm scale, 4 Nos. USA
b Cooling agent filling: as per recommendation of "Rhoss"
c Cooling agent line copper pipe with following accessories:
a) Copper Pipe Dia 50mm to 75mm as per "Rhoss Recommendation.
b) Installation of Other components supplied by manufacturer.
c) Galv. Hangers & Supports.
d) Nitrogen Pressure Testing.
e) Flushing with Nitrogen..
f) Refrigerent Charging as per "Rhoss Recommendation..
Supply and Installation of M.S Pipe line & valves for Cooler Cooling machine as per
d
following detail:
a) Pumps 14 Nos for chilled water and cooling media circulation, S.S type and for
primary/secondary circuit.
b) Isolating valves 2 for each pump.
c) Drain Cock
f Heat transfer medium mixture
a Supply and Installation of ISP1 control system & Electrical switch board.
c Preparation
Exvclusion : Free of charge power supply and worker accomodation shall be arrange by client.
Amount (Rs.)
500,000
300,000
450,000
80,000
145,000
150,000
6,775,000
340,000
120,000
880,000
1,555,000
675,000
1,350,000
340,000
85,000
1,937,500
300,000
400,000
1,065,000
140,000
2,150,000
3,650,000
2,385,000
235,000
1,620,000
11,900,000
45,000
50,000
25,000
125,000
1,350,000
225,000
65,000
41,412,500