You are on page 1of 9

PROPOSED LANDSCAPE WORKS FOR

KAMPUNG KELANANG JETTY,


BANTING, SELANGOR

TENDER DOCUMENT

DECEMBER 2016

CLIENT: LANDSCAPE CONSULTANT:

VECTOR LANDSCAPE
GRAPHIC DESIGN
SUNWAY PROPERTY GROUP NO 51, JALAN BRUAS, DAMANSARA HEIGHTS,
MENARA SUNWAY, JALAN LAGOON TIMUR, BANDAR SUNWAY,
46150 PETALING JAYA, SELANGOR, MALAYSIA 50450 KUALA LUMPUR, MALAYSIA
PROPOSED LANDSCAPE WORKS FOR KAMPUNG KELANANG JETTY, BANTING, SELANGOR

TABLE OF CONTENT

NO CONTENT DRAWING NO

1 SECTION A – BILL OF QUANTITY


GENERAL CONDITIONS AND PRELIMINARIES
GENERAL SITE CLEARANCE
EXCAVATION AND EARTH WORKS
SUBGRADE
FLOORING
GROUND FOUNTAIN SYSTEM
CLEANING

2 SECTION B – TENDER DRAWING


EXISTING SITE PLAN KGKLG/LAN/2016/TD-0001
DEMOLITION PLAN KGKLG/LAN/2016/TD-0002
HARDSCAPE MASTER PLAN KGKLG/LAN/2016/TD-0003
GRADING AND DRAINAGE PLAN KGKLG/LAN/2016/TD-0004
LIGHTING PLAN KGKLG/LAN/2016/TD-0005
LIGHTING PLAN DESCRIPTION KGKLG/LAN/2016/TD-0006
SETTING OUT PLAN KGKLG/LAN/2016/TD-0007
SECTION AND ELEVATION KGKLG/LAN/2016/TD-0008
GROUND FOUNTAIN DETAIL OVERALL PLAN KGKLG/LAN/2016/TD-0009
GROUND FOUNTAIN BASIN AND SKIMMER SYSTEM DETAIL KGKLG/LAN/2016/TD-0010
GROUND FOUNTAIN LED LIGHT SYSTEM DETAIL KGKLG/LAN/2016/TD-0011
GROUND FOUNTAIN WATER PUMP AND PIPING DETAIL KGKLG/LAN/2016/TD-0012
GROUND FOUNTAIN GRATING COVER DETAIL KGKLG/LAN/2016/TD-0013
GROUND FOUNTAIN VALVE DETAIL KGKLG/LAN/2016/TD-0014
SECTION A
BILL OF QUANTITY
PROPOSED LANDSCAPE WORKS FOR KAMPUNG KELANANG JETTY, BANTING,
SELANGOr

Bill of Quantities 1: Preliminaries work

Rate per unit


No Item / Description Unit Qty Cost (RM)
(RM)
1 Preliminaries
Allow for compliance with
specifications and conditions of
1a Lump sum
the contract

Allow for compliance with all


other requirements under the
1b Lump sum
contract

Allow for the provision of full


time professional attendance on
1c site for the duration of the site Lump sum
operation

Allow for the provision of two (2)


number copies of interim factual
1d Lump sum
report

Allow for the provision of six (6)


number copies of compete final
factual report, one compiled and
bound set of all raw field and
1e Lump sum
laboratory sheets and one copy
of factual report in electronics
format

Allow for licensed surveyor for


setting up of all the test locations
1f Lump sum
and taking of levels

Allow for provision of


photographs in electronic format
1g Lump sum
as per this specification

Provide additional copies of the


Rate
1h final factual report No
only
Total carried to summary
PROPOSED LANDSCAPE WORKS FOR KAMPUNG KELANANG JETTY, BANTING,
SELANGOr

Bill of quantities 2: site clearance

Rate per unit


No Item / Description Unit Qty Cost (RM)
(RM)
2 General site clearance
Cleaning undergrowth
Clearing site undergrowths:
2a M2 21 15.00 315.00
Bushes, debris, scrubs, etc

Removing tree cutting down and


grubbing up the roots, filling
voids left with materials arising
2b M2 21 8.00 168.00
from excavation 300mm-600mm
girth

Demolishing work this section


compromises the demolition of
structures as indication of
2c Lump sum 1 300.00 300.00
drawing demolishing down to
ground level

Total carried to summary 783.00

Bill of quantities 3: excavation and earth works

Rate per unit


No Item / Description Unit Qty Cost (RM)
(RM)
3 Excavation and earth works
Topsoil excavation
3a M3 54.6 8.00 436.80
Excavation to reduce level
maximum depth not exceeding
3b M3 54.6 18.00 982.80
0.30m

Surface treatment impregnation of


chemical for termite control
applied 4 stages strictly 5 years
warranty in accordance with the
3c M3 32 8.00 256.00
manufacture’s and specialist
contractor’s recommendation and
instructions

Total carried to summary 1674.80


PROPOSED LANDSCAPE WORKS FOR KAMPUNG KELANANG JETTY, BANTING,
SELANGOr

Bill of quantities 4: subgrade

Rate per unit


No Item / Description Unit Qty Cost (RM)
(RM)
4 subgrade
100mm thk. X 13000mm length x
4a 3500mm width compacted sand M3 4.55 80.00 364.00

100mm thk. X 13000mm length x


3500mm width compacted
4b M3 4.55 35.00 159.25
granular

Concrete slab to engineering


3 Lump
4c detail M 580.00 580.00
sum
Total carried to summary 1103.25

Bill of quantities 5: flooring

Rate per unit


No Item / Description Unit Qty Cost (RM)
(RM)
5 Flooring
100mm thk. Reinforced concrete
slab over 150mm thk. hardcore

Ensuring surface is structurally


sound, dry, clean and free of all
contaminants. Concrete surface
5a M3 4.55 250.00 1137.50
are acids washed or mechanically
abraded. Removing curing
compounds and release agents
from concrete surface. Prime with
suitable primer if required.

Water proofing membrane 2


5b M 60 20.00 1200.00
Total carried to summary 2337.50
PROPOSED LANDSCAPE WORKS FOR KAMPUNG KELANANG JETTY, BANTING,
SELANGOr

Bill of quantities 6: Ground fountain system

Rate per unit


No Item / Description Unit Qty Cost (RM)
(RM)
6.1 FOUNTAIN LIGHT
a 12v 6w ip68
submersible led light
with the size of
Nos 9 90.00 810.00
∅ 120mm x 160mm finish
with stainless steel

6.2 Fountain nozzle


a 3 orifice size of nozzle
with ∅ 1.09mm hole size Nos 9 57.00 513.00

6.3 Piping
a ∅ 30MM Stainless steel pipe m 10.1 59.00 595.90
b ∅ 30MM Stainless steel tee nos 8 12.00 96.00
c ∅ 30MM Stainless steel elbow nos 1 10.00 10.00

6.4 Valve nos 1 25.00 25.00

6.5 Water pump


a 1.5 gallons per minutes
nos 1 2700.00 2700.00
with 1000psI water pump
b Water pump suction filter Nos 1 79.00 79.00
c Pump house pre filter M2 1.62 300.00 486.00

6.6 Cover grating


a Stainless steel cover grating M2 25 85.00 2125.00

Total carried to summary 7439.90

Bill of quantities 7: cleaning

Rate per unit


No Item / Description Unit Qty Cost (RM)
(RM)
5
7 cleaning Lump sum 200.00 1000.00
days
Total carried to summary 1000.00
PROPOSED LANDSCAPE WORKS FOR KAMPUNG KELANANG JETTY, BANTING,
SELANGOr

General summary of tender

No Item / Description Cost (RM)


1 General conditions and preliminaries 783.00
2 General site clearance 1674.80
3 Excavation and earth works
1103.25
4 Subgrade
5 Flooring 2337.50
6 Ground fountain system 7439.90
7 cleaning 1000.00
Grand total 14338.45

The overall Sum of Malaysia ringgit: rm 14338.45

Contractor

_________________________________________

Name: gan chee yoong


Date: 18 dec 2016

Consultant

_________________________________________

Name: lar. Asraf abdul rahman


Date: 18 dec 2016

Client

_________________________________________

Name: lar. Bryant tan


Date: 18 dec 2016