Professional Documents
Culture Documents
Note: All sections must be completed by the subcontractor prior to issuing method statements
to ITC Concepts Limited. To be ticked either Yes or Not Applicable. All items must be
checked and documents submitted no less than 72 hours before commencement on site.
Approvals
A = Accepted
Accepted By:
Sub-Contractor Supervisor:
All operatives to sign below to state they have read and fully understand the attached Method
statement and Risk Assessment.