OBRA: : "MANTENIMIENTO DE LA CAPA DE RODADURA DEL SECTOR ANIPATA QUELLOHUASI, DEL CENTRO POBLADO DE PUMASUKA, DISTRITO DE CHALLHUAHUACHO, PROVINCIA DE COTABAMBAS - APURIMAC"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE CHALLHUAHUACHO
FECHA : JULIO 2018
U MES 1 MES 2
Item Descripción n Metrado Parcial (S/.)
SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4
d
U
Código Recurso n Cantid. Precio S/. Presupuestado S/. PRIMER MES SEGUNDO MES TERCER MES
i
d
MANO DE OBRA
0147000022 OPERADOR DE EQUIPO LIVIANO hh 3.7100 13.39 49.69 14.91 20.37 14.41
0147000023 OPERADOR DE EQUIPO PESADO hh 5.2500 13.39 70.28 21.08 28.81 20.38
0147000032 TOPOGRAFO hh 2.4600 13.68 33.89 10.17 12.88 10.84
0147010001 CAPATAZ hh 10.5400 14.73 155.27 46.58 59.00 49.69
0147010002 OPERARIO hh 941.2000 13.39 12,594.87 2,581.95 4,786.05 5,226.87
0147010003 OFICIAL hh 382.4900 11.64 4,444.26 1,111.07 1,688.82 1,644.38
0147010004 PEON hh 840.6100 10.44 8,776.86 2,633.06 3,335.21 2,808.60
0147030094 OPERARIO DE EQUIPO PESADO hh 3.6400 13.39 48.65 14.60 19.95 14.11
MATERIALES
0202000007 ALAMBRE NEGRO RECOCIDO # 16 kg 1.5700 4.50 7.06 4.94 2.12 0.00
0202000008 ALAMBRE NEGRO RECOCIDO # 8 kg 20.5200 4.50 92.52 64.76 27.76 0.00
0202000010 ALAMBRE NEGRO # 16 kg 192.2800 4.50 865.26 605.68 259.58 0.00
0202000015 ALAMBRE NEGRO # 8 kg 13.1300 4.50 59.20 41.44 17.76 0.00
0202010001 CLAVOS PARA MADERA CON CABEZA DE 1" kg 0.3800 4.50 1.74 1.22 0.52 0.00
0202010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 45.1700 4.50 204.50 143.15 61.35 0.00
0202010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.2500 4.00 1.00 0.70 0.30 0.00
0203020003 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 23.6000 2.95 69.71 48.80 20.91 0.00
0203020003001 ACERO DE REFUERZO FY=4200GRADO 60 kg 3,744.4100 2.95 11,054.24 4,421.70 6,632.54 0.00
0204000000 ARENA FINA m3 9.1100 30.00 273.98 191.79 82.19 0.00
0205000004 PIEDRA CHANCADA DE 3/4" m3 45.2800 50.00 2,264.00 1,584.80 679.20 0.00
0205000009 PIEDRA GRANDE DE 8" m3 6.9600 28.00 194.88 136.42 58.46 0.00
0205000011 PIEDRA MEDIANA DE 6" m3 1.1600 28.00 32.34 22.64 9.70 0.00
0205010000 AFIRMADO m3 3.9400 28.00 110.26 77.18 33.08 0.00
0205010004 ARENA GRUESA m3 47.0200 32.50 1,529.22 1,070.45 458.77 0.00
0207010000 CABLE TW # 14 AWG 2.5 mm2 m 114.4500 0.75 85.83 60.08 0.00 25.75
0210140078 ACCESORIO COMPLETO PARA TANQUE ELEVADO u 1.0000 150.00 150.00 0.00 0.00 150.00
0212010039 TOMACORRIENTE BIPOLAR DOBLE + TOMA TIERRA u 1.0000 15.25 15.25 0.00 0.00 15.25
0212030029 INTERRUPTOR BAKELITA X 1 SWITCH u 1.0000 4.58 4.58 0.00 0.00 4.58
0212030031 INTERRUPTOR BAKELITA X 3 SWITCH u 1.0000 15.25 15.25 0.00 0.00 15.25
0212090003 CAJA OCTOGONAL GALVANIZADA LIVIANA 4" X 4" X 2 1/2 u 1.0000 0.90 0.90 0.00 0.00 0.90
0212090004 CAJA RECTANGULAR GALVANIZADA LIVIANA DE 4" X 2 1/8" u 3.0000 1.15 3.46 0.00 0.00 3.46
0212090049 CAJA OCTOGONAL GALVANIZADA LIVIANA 4" X 2 1/8 " u 10.0000 1.00 10.00 0.00 0.00 10.00
0212100104 PLACA DE MARMOL JASPIADO u 1.0000 450.00 450.00 0.00 0.00 450.00
0212140043 FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PANTALLA u 6.0000 58.90 353.40 0.00 0.00 353.40
0212140044 FLUORESCENTE RECTO ISPE 1X40 W C/EQ + PANTALLA u 2.0000 45.32 90.64 0.00 0.00 90.64
0217000024 LADRILLO KING KONG 18 HUECOS 9 X 12 X 24 cm SOGA- INDUSTRIAL u 6,945.5000 0.60 4,167.30 1,458.56 2,708.75 0.00
12.-CRONOGRAMA DE DESEMBOLSO DE MATERIALES
: MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL PRONOEI SAGRADO CORAZÓN DE JESÚS DEL AA.HH. SANTA MARÍA DE TECAPA-META: CONSTRUCCIÓN DE UN AULA Y CERCO PERIMÉTRICO II
ETAPA, DISTRITO DE SAN JOSÉ, PROVINCIA DE PACASMAYO-LA LIBERTAD
: MUNICIPALIDAD DISTRITAL DE SAN JOSÈ
: AGOSTO DEL 2013
U
Código Recurso n Cantid. Precio S/. Presupuestado S/. PRIMER MES SEGUNDO MES TERCER MES
i
d
0217010004 LADRILLO DE ARCILLA PARA TECHO h=15 cm u 341.0000 1.54 525.14 0.00 525.14 0.00
0221000001 CEMENTO PORTLAND TIPO I (42.5 kg) bls 315.9100 16.95 5,354.05 0.00 5,174.05 180.00
0221000094 CEMENTO PORTLAND TIPO MS (42.5 kg) bls 110.4100 17.79 1,964.18 1,669.55 294.63 0.00
0226030001 STOVE BOLT DE 1/8 X 1/2" u 4.0000 5.00 20.00 0.00 0.00 20.00
0226160019 BISAGRA CAPUCHINA PLOMA 4" X 4" u 4.0000 3.00 12.00 0.00 0.00 12.00
0229040001 CINTA AISLANTE rll 1.1000 3.18 3.52 0.00 0.00 3.52
0229060006 YESO bls 0.7700 1.55 1.54 1.54 0.00 0.00
0229120065 TECKNOPORT DE 1"X4"X8" pl 7.3800 13.50 99.56 0.00 0.00 99.56
0229200013 THINNER ACRILICO gal 10.7600 16.94 182.91 0.00 0.00 182.91
0229310012 PIZARRA ACRILICA 1.60 x 4.50 m u 1.0000 135.59 135.59 0.00 0.00 135.59
0230000002 PORCELANA kg 9.6900 5.04 48.78 0.00 0.00 48.78
0230150042 SELLADOR DE PARED TEKNO kg 20.1700 19.49 392.71 0.00 0.00 392.71
EQUIPOS
0337010001 HERRAMIENTAS MANUALES %MO 740.16 325.77 184.34 230.05
0337030000 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" u 27.6400 5.00 135.28 135.28 0.00 0.00
0337540001 MIRAS Y JALONES hm 2.4600 10.00 24.65 24.65 0.00 0.00
0348040038 CAMION VOLQUETE 4 X 2 140-210 HP 6 m3 hm 1.8200 120.00 218.25 218.25 0.00 0.00
0348090002 ANDAMIO METAL TABLAS ALQUILER est 1.9600 5.00 9.69 9.69 4.36 -4.36
0348800004 ANDAMIO METALICO hm 75.8200 5.00 379.79 170.91 170.91 37.98
0348900001 SIERRA CIRCULAR hm 2.5900 10.00 25.92 0.00 0.00 25.92
0349030001 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 9.4000 10.00 94.03 0.00 94.03 0.00
0349030074 PLANCHA COMPACTADORA 7 HP hm 0.4100 10.00 4.08 0.00 4.08 0.00
0349040003 CARGADOR SOBRE ORUGAS 150-180 HP 2.5-2.75 yd hm 1.8200 180.00 327.39 229.17 98.22 0.00
0349070006 VIBRADOR DE CONCRETO 3/4" - 2" hm 9.7700 15.00 146.54 73.27 73.27 0.00
0349070050 MOTOSOLDADORA DE 250 A hm 3.3100 5.00 16.55 0.00 16.55 0.00
0349100007 MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 16.4100 15.00 246.20 246.20 0.00 0.00
0349100011 MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3 hm 7.4800 15.00 112.26 0.00 112.26 0.00
0349880003 TEODOLITO hm 2.4600 15.00 36.97 36.97 0.00 0.00
12.-CRONOGRAMA DE DESEMBOLSO DE MATERIALES
: MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL PRONOEI SAGRADO CORAZÓN DE JESÚS DEL AA.HH. SANTA MARÍA DE TECAPA-META: CONSTRUCCIÓN DE UN AULA Y CERCO PERIMÉTRICO II
ETAPA, DISTRITO DE SAN JOSÉ, PROVINCIA DE PACASMAYO-LA LIBERTAD
: MUNICIPALIDAD DISTRITAL DE SAN JOSÈ
: AGOSTO DEL 2013
U
Código Recurso n Cantid. Precio S/. Presupuestado S/. PRIMER MES SEGUNDO MES TERCER MES
i
d
0349900012 CEPILLADORA ELECTRICA hm 2.5900 10.00 25.92 0.00 0.00 25.92
SUB CONTRATOS
COSTO DIRECTO 76,734.09 25,581.28 32,024.40 19,128.41
GASTOS GENERALES (10%) 7,673.41 2,558.13 3,202.44 1,912.84
UTILIDAD (5%) 3,836.70 1,279.06 1,601.22 956.42
SUBTOTAL 88,244.20 29,418.47 36,828.06 21,997.67
IGV (18%) 15,883.96 5,295.32 6,629.05 3,959.58
TOTAL PRESUPUESTO S/. 104,128.16 S/. 34,713.79 S/. 43,457.11 S/. 25,957.25
9.-DESCONSOLIDACION DE GASTOS GENERALES
EJECUTADA POR CONTRATA
: MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL PRONOEI SAGRADO CORAZÓN DE JESÚS DEL AA.HH. SANTA MARÍA DE TECAPA-META:
CONSTRUCCIÓN DE UN AULA Y CERCO PERIMÉTRICO II ETAPA, DISTRITO DE SAN JOSÉ, PROVINCIA DE PACASMAYO-LA LIBERTAD
: MUNICIPALIDAD DISTRITAL DE SAN JOSÈ
: AGOSTO DEL 2013
MONTO DE LA PROPUESTA A COSTO DIRECTO : S/. 76,734.09
TIEMPO DE EJECUCION : DIAS 60.00
II.1.2. EQUIPO NO INCLUIDO EN LOS COSTOS DIRECTOS CANT COSTO/MES VECES PARCIAL % Incid.
a:) Viaticos por compra de materiales 1 40.91 1.00 40.91
b.) Combustible y Lubricantes para Movilidad 1 25.00 2.00 50.00
c.) Otros Servicios a Terceros Alquiler de Computadora 1 60.00 1.00 60.00
d.) Diseño de Mezcla 1 120.00 2.00 240.00
e.) Ensayos a la Resistencia del Concreto 1 15.000 8.00 120.00
SUB TOTAL S/. : 510.91 0.67%