CRONOGRAMA VALORIZADO DE OBRA

OBRA: : "MANTENIMIENTO DE LA CAPA DE RODADURA DEL SECTOR ANIPATA QUELLOHUASI, DEL CENTRO POBLADO DE PUMASUKA, DISTRITO DE CHALLHUAHUACHO, PROVINCIA DE COTABAMBAS - APURIMAC"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE CHALLHUAHUACHO
FECHA : JULIO 2018
U MES 1 MES 2
Item Descripción n Metrado Parcial (S/.)
SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4
d

01. TRABAJOS PRELIMINARES: S/.252,613.49


01.01 OBRAS PROVISIONALES 13,773.22
01.01.01 CARTEL DE OBRA 2.4X3.6 mX 2.40 m GLB 1.00 688.22 S/.688.22
01.01.02 ALMACEN DE OBRA M2 50.00 2,603.00 S/.2,603.00
01.01.03 CERCO PARA ALMACEN DE MAQUINARIA M 100.00 2,482.00 S/.2,482.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 8,000.00 S/.4,000.00 S/.4,000.00
01.02 TRABAJOS PRELIMINARES 9,530.10
01.02.01 TRAZO Y REPLANTEO DE EJE KM 1.23 743.02 S/.371.51 S/.371.51
01.02.02 TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE KM 1.23 884.28 S/.110.54 S/.110.54 S/.110.54 S/.110.54 S/.110.54 S/.110.54 S/.110.54 S/.110.54
01.02.03 HABILITACION DE CANTERAS DE AGREGADOS UND 1.00 5,377.13 S/.5,377.13
01.02.04 INSTALACION DE SEGURIDAD GLB 1.00 655.67 S/.655.67
01.02.05 EQUIPOS DE SEGURIDAD PERSONAL GLB 1.00 1,870.00 S/.1,870.00
01.03 MOVIMIENTO DE TIERRAS 159,044.28
01.03.01 CORTE DE MATERIAL DE BASE EXISTENTE CON EQUIPO M3 3,178.83 15,608.06 S/.7,804.03 S/.7,804.03
01.03.02 ELIMINACION DE MATERIAL EXCEDENTE M3 3,009.75 23,175.08 S/.23,175.08
01.03.03 EXCAVACION DE MATERIAL SELECCIONADO EN CANTERA M3 2,481.70 90,060.89 S/.45,030.45 S/.45,030.45
01.03.04 RELLENO DE AFIRMADO EN CAPAS DE 0.30 m M3 169.08 28,998.91 S/.14,499.46 S/.14,499.46
01.03.05 INSTALACION DE ZARANDA EN CANTERA UND 1.00 1,201.34 S/.1,201.34
01.04 SUPERFICIE DE RODADURA 70,265.89
01.04.01 TRANSPORTE DE MATERIAL SELECCIONADO 48,089.89
01.04.01.01 PERFILADO Y COMPACTACION SUB-RASANTES ZONAS CORTE M2 6,160.00 28,582.40 S/.14,291.20 S/.14,291.20
01.04.01.02 CARGUIO DE MATERIAL SELECCIONADO M3 1,601.60 8,440.43 S/.8,440.43
01.04.01.03 TRANSPORTE DE MATERIAL SELECCIONADO DE CANTERA CON M3 1,601.60 11,067.06 S/.11,067.06
01.04.02 TENDIDO DE MATERIAL SELECCIONADO e=0.20 22176.00
01.04.02.01 TENDIDO RIEGO Y COMPACTADO DE MATERIAL SELECCIONADOM2 6160.00 22176.00 S/.11,088.00 S/.11,088.00

02. OBRAS DE ARTE Y ALCANTARILLADAS Y BADENES: S/.292,976.65


02.01 CUNETAS ABIERTAS EN SUPERFICIE DE RODADURA 6406.40
02.01.01 CONSTRUCCION DE CUNETAS LATERALES M 2464.00 6406.40 S/.3,203.20 S/.3,203.20
02.02 OBRAS DE ALCANTARILLADO 270564.34
02.02.01 TRAZO Y REPLANTEO PARA ESTRUCTURAS M2 297.84 1387.93 S/.1,387.93
02.02.02 EXCAVACION MANUAL EN TERRENO COMPACTADO M3 205.92 7058.94 S/.7,058.94
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE M3 205.92 1585.58 S/.1,585.58
02.02.04 SOLADO e=3" M2 76.80 2280.96 S/.2,280.96
02.02.05 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS M2 475.20 38244.10 S/.19,122.05 S/.19,122.05
02.02.06 FALZA ZAPATA 1:10 + 50% P.G. M3 5.04 2410.88 S/.2,410.88
02.02.07 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 1,013.88 6985.63 S/.3,492.82 S/.3,492.82
02.02.08 CONCRETO f'c=210 kg/cm2 M3 15.36 6872.83 S/.6,872.83
02.02.09 CONCRETO f'c=175 kg/cm2 M3 387.84 166910.82 S/.83,455.41 S/.83,455.41
02.02.10 MAMPOSTERIA DE CONCRETO f'c=175 kg/cm2 + 60%PM M3 63.55 30899.28 S/.30,899.28
02.02.12 RELLENO DE AFIRMADO EN CAPAS DE 0.30 m M3 34.56 5927.39 S/.5,927.39
02.01.13 BADENES 10105.91
02.01.13.01 TRAZO Y REPLANTEO INICAL M2 64.17 286.20 S/.286.20
02.01.13.02 EXCAVACION DE ZANJA CON EQUIPO IIEE (TERRENO SUAVE) M3 57.57 797.34 S/.797.34
02.01.13.03 ELIMINACION DE MATERIAL EXCEDENTE M3 57.57 443.29 S/.443.29
02.01.13.04 CONCRETO CILOPEO 1:10 + 50% P.G. M3 9.92 4745.23 S/.4,745.23
02.01.13.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO M3 17.36 2267.91 S/.2,267.91
02.01.13.06 EMPEDRADO DE PROTECCION M3 17.01 1565.94 S/.1,565.94
02.01.14 PRUEBAS DE CALIDAD 5900.00
02.01.14.01 ESTUDIO DE SUELOS GLB 3.00 2400.00 S/.2,400.00
02.01.14.02 ESTUDIO DE CANTERAS GLB 4.00 2000.00 S/.2,000.00
02.01.14.03 PRUEBAS DE DENSIDAD DE CAMPO UND 30.00 1500.00 S/.500.00 S/.500.00 S/.500.00
OBRA: : "MANTENIMIENTO DE LA CAPA DE RODADURA DEL SECTOR ANIPATA QUELLOHUASI, DEL CENTRO POBLADO DE PUMASUKA, DISTRITO DE CHALLHUAHUACHO, PROVINCIA DE COTABAMBAS - APURIMAC"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE CHALLHUAHUACHO
FECHA : JULIO 2018
U MES 1 MES 2
Item Descripción n Metrado Parcial (S/.)
SEM 1 SEM 2 SEM 3 SEM 4 SEM 1 SEM 2 SEM 3 SEM 4
d

03. VARIOS: S/.1,000.00


03.01 OTROS GASTOS GLB 1.00 1000.00 S/.125.00 S/.125.00 S/.125.00 S/.125.00 S/.125.00 S/.125.00 S/.125.00 S/.125.00
12.-CRONOGRAMA DE DESEMBOLSO DE MATERIALES
: MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL PRONOEI SAGRADO CORAZÓN DE JESÚS DEL AA.HH. SANTA MARÍA DE TECAPA-META: CONSTRUCCIÓN DE UN AULA Y CERCO PERIMÉTRICO II
ETAPA, DISTRITO DE SAN JOSÉ, PROVINCIA DE PACASMAYO-LA LIBERTAD
: MUNICIPALIDAD DISTRITAL DE SAN JOSÈ
: AGOSTO DEL 2013

U
Código Recurso n Cantid. Precio S/. Presupuestado S/. PRIMER MES SEGUNDO MES TERCER MES
i
d
MANO DE OBRA
0147000022 OPERADOR DE EQUIPO LIVIANO hh 3.7100 13.39 49.69 14.91 20.37 14.41
0147000023 OPERADOR DE EQUIPO PESADO hh 5.2500 13.39 70.28 21.08 28.81 20.38
0147000032 TOPOGRAFO hh 2.4600 13.68 33.89 10.17 12.88 10.84
0147010001 CAPATAZ hh 10.5400 14.73 155.27 46.58 59.00 49.69
0147010002 OPERARIO hh 941.2000 13.39 12,594.87 2,581.95 4,786.05 5,226.87
0147010003 OFICIAL hh 382.4900 11.64 4,444.26 1,111.07 1,688.82 1,644.38
0147010004 PEON hh 840.6100 10.44 8,776.86 2,633.06 3,335.21 2,808.60
0147030094 OPERARIO DE EQUIPO PESADO hh 3.6400 13.39 48.65 14.60 19.95 14.11

MATERIALES
0202000007 ALAMBRE NEGRO RECOCIDO # 16 kg 1.5700 4.50 7.06 4.94 2.12 0.00
0202000008 ALAMBRE NEGRO RECOCIDO # 8 kg 20.5200 4.50 92.52 64.76 27.76 0.00
0202000010 ALAMBRE NEGRO # 16 kg 192.2800 4.50 865.26 605.68 259.58 0.00
0202000015 ALAMBRE NEGRO # 8 kg 13.1300 4.50 59.20 41.44 17.76 0.00
0202010001 CLAVOS PARA MADERA CON CABEZA DE 1" kg 0.3800 4.50 1.74 1.22 0.52 0.00
0202010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 45.1700 4.50 204.50 143.15 61.35 0.00
0202010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.2500 4.00 1.00 0.70 0.30 0.00
0203020003 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 23.6000 2.95 69.71 48.80 20.91 0.00
0203020003001 ACERO DE REFUERZO FY=4200GRADO 60 kg 3,744.4100 2.95 11,054.24 4,421.70 6,632.54 0.00
0204000000 ARENA FINA m3 9.1100 30.00 273.98 191.79 82.19 0.00
0205000004 PIEDRA CHANCADA DE 3/4" m3 45.2800 50.00 2,264.00 1,584.80 679.20 0.00
0205000009 PIEDRA GRANDE DE 8" m3 6.9600 28.00 194.88 136.42 58.46 0.00
0205000011 PIEDRA MEDIANA DE 6" m3 1.1600 28.00 32.34 22.64 9.70 0.00
0205010000 AFIRMADO m3 3.9400 28.00 110.26 77.18 33.08 0.00
0205010004 ARENA GRUESA m3 47.0200 32.50 1,529.22 1,070.45 458.77 0.00
0207010000 CABLE TW # 14 AWG 2.5 mm2 m 114.4500 0.75 85.83 60.08 0.00 25.75
0210140078 ACCESORIO COMPLETO PARA TANQUE ELEVADO u 1.0000 150.00 150.00 0.00 0.00 150.00
0212010039 TOMACORRIENTE BIPOLAR DOBLE + TOMA TIERRA u 1.0000 15.25 15.25 0.00 0.00 15.25
0212030029 INTERRUPTOR BAKELITA X 1 SWITCH u 1.0000 4.58 4.58 0.00 0.00 4.58
0212030031 INTERRUPTOR BAKELITA X 3 SWITCH u 1.0000 15.25 15.25 0.00 0.00 15.25
0212090003 CAJA OCTOGONAL GALVANIZADA LIVIANA 4" X 4" X 2 1/2 u 1.0000 0.90 0.90 0.00 0.00 0.90
0212090004 CAJA RECTANGULAR GALVANIZADA LIVIANA DE 4" X 2 1/8" u 3.0000 1.15 3.46 0.00 0.00 3.46
0212090049 CAJA OCTOGONAL GALVANIZADA LIVIANA 4" X 2 1/8 " u 10.0000 1.00 10.00 0.00 0.00 10.00
0212100104 PLACA DE MARMOL JASPIADO u 1.0000 450.00 450.00 0.00 0.00 450.00
0212140043 FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PANTALLA u 6.0000 58.90 353.40 0.00 0.00 353.40
0212140044 FLUORESCENTE RECTO ISPE 1X40 W C/EQ + PANTALLA u 2.0000 45.32 90.64 0.00 0.00 90.64
0217000024 LADRILLO KING KONG 18 HUECOS 9 X 12 X 24 cm SOGA- INDUSTRIAL u 6,945.5000 0.60 4,167.30 1,458.56 2,708.75 0.00
12.-CRONOGRAMA DE DESEMBOLSO DE MATERIALES
: MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL PRONOEI SAGRADO CORAZÓN DE JESÚS DEL AA.HH. SANTA MARÍA DE TECAPA-META: CONSTRUCCIÓN DE UN AULA Y CERCO PERIMÉTRICO II
ETAPA, DISTRITO DE SAN JOSÉ, PROVINCIA DE PACASMAYO-LA LIBERTAD
: MUNICIPALIDAD DISTRITAL DE SAN JOSÈ
: AGOSTO DEL 2013

U
Código Recurso n Cantid. Precio S/. Presupuestado S/. PRIMER MES SEGUNDO MES TERCER MES
i
d
0217010004 LADRILLO DE ARCILLA PARA TECHO h=15 cm u 341.0000 1.54 525.14 0.00 525.14 0.00
0221000001 CEMENTO PORTLAND TIPO I (42.5 kg) bls 315.9100 16.95 5,354.05 0.00 5,174.05 180.00
0221000094 CEMENTO PORTLAND TIPO MS (42.5 kg) bls 110.4100 17.79 1,964.18 1,669.55 294.63 0.00
0226030001 STOVE BOLT DE 1/8 X 1/2" u 4.0000 5.00 20.00 0.00 0.00 20.00
0226160019 BISAGRA CAPUCHINA PLOMA 4" X 4" u 4.0000 3.00 12.00 0.00 0.00 12.00
0229040001 CINTA AISLANTE rll 1.1000 3.18 3.52 0.00 0.00 3.52
0229060006 YESO bls 0.7700 1.55 1.54 1.54 0.00 0.00
0229120065 TECKNOPORT DE 1"X4"X8" pl 7.3800 13.50 99.56 0.00 0.00 99.56
0229200013 THINNER ACRILICO gal 10.7600 16.94 182.91 0.00 0.00 182.91
0229310012 PIZARRA ACRILICA 1.60 x 4.50 m u 1.0000 135.59 135.59 0.00 0.00 135.59
0230000002 PORCELANA kg 9.6900 5.04 48.78 0.00 0.00 48.78

0230150042 SELLADOR DE PARED TEKNO kg 20.1700 19.49 392.71 0.00 0.00 392.71

0230460032 SILICONA u 5.3600 13.45 72.41 0.00 0.00 72.41


0230460048 PEGAMENTO PARA CERAMICA bls 5.5000 11.35 62.45 0.00 0.00 62.45
0230470003 SOLDADURA CELLOCORD P 3/16" kg 0.5000 12.35 6.16 0.00 6.16 0.00
0230750111 PORTON DE FIERRO VEHICULAR Y PEATONAL INCLUIDO ACCESORIOS u 1.0000 3,850.00 3,850.00 0.00 0.00 3,850.00
0230990019 LIJA u 323.0100 1.50 484.88 0.00 339.42 145.46
0232010009 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS A OBRA glb 1.0000 1,500.00 1,500.00 750.00 0.00 750.00
0238000000 HORMIGON (PUESTO EN OBRA) m3 2.4600 35.00 85.97 85.97 0.00 0.00
0238000003 HORMIGON m3 14.1000 32.50 458.21 458.21 0.00 0.00
0239000000 COLA SINTETICA FULLER gal 0.2000 15.38 3.12 3.12 0.00 0.00
0239010100 ALQUILER DE LOCAL PARA ALMACEN DE OBRA mes 90.0000 10.00 900.00 300.00 300.00 300.00
0239020075 LIJA PARA MADERA u 2.0300 1.85 3.77 3.77 0.00 0.00
0239050000 AGUA m3 15.8600 8.00 125.76 62.88 62.88 0.00
0240130055 PORCELANATO 40 X40 cm2 PRIMERA CALIDAD m2 39.3400 38.14 1,500.02 0.00 0.00 1,500.02
0243040000 MADERA TORNILLO p2 155.0200 3.20 496.63 347.64 0.00 148.99
0243130000 MADERA DE CEDRO (p2) p2 114.2100 7.00 799.47 559.63 239.84 0.00
0244010002 ESTACA DE MADERA p2 1.5400 1.00 1.54 1.54 0.00 0.00
0245010001 MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 1,338.3100 3.50 4,685.08 3,279.56 1,405.52 0.00
0251010000 ANGULO DE ACERO LIVIANO DE 3/4" X 3/4" X 1/8" X 6 m pza 3.3200 18.57 61.58 0.00 61.58 0.00
0251010001 ANGULO DE ACERO LIVIANO DE 1" X 1" X 1/8" X 6 m pza 5.3000 35.28 187.07 0.00 187.07 0.00
0251020000 TEE DE ACERO LIVIANO DE 3/4" X 3/4" X 1/8" X 6 m pza 0.5800 28.45 16.40 0.00 16.40 0.00
0251020001 TEE DE ACERO LIVIANO DE 1" X 1" X1/8" X 6 m pza 3.3900 75.58 256.55 0.00 256.55 0.00
0254010006 PINTURA ESMALTE SINTETICO CPP gal 10.7600 49.15 528.55 0.00 528.55 0.00
0254030008 PINTURA LATEX PATO CPP gal 14.4100 22.03 317.70 0.00 317.70 0.00
0254130001 PINTURA IMPRIMANTE PARA MUROS gal 14.4100 4.67 67.00 0.00 67.00 0.00
0254160002 IMPRIMANTE gal 6.7200 3.50 24.21 0.00 24.21 0.00
0254190006 GIGANTOGRAFIA u 1.0000 220.00 220.00 220.00 0.00 0.00
0265700052 TIRAFONES DE 1/8" X 1 1/2" pza 4.0000 1.00 4.00 0.00 4.00 0.00
0274010025 TUBERIA PVC SEL PARA INSTALACIONES ELECTRICAS DE 5/8" pza 20.0000 1.65 33.04 0.00 33.04 0.00
0274010031 TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3.00 m pza 4.5000 3.85 17.34 0.00 17.34 0.00
0274020021 CURVA PVC SEL PARA INSTALACIONES ELECTRICAS 5/8" u 26.0000 2.35 61.10 0.00 61.10 0.00
0274020027 CURVA PVC SEL 3/4" pza 6.0000 1.05 6.30 0.00 6.30 0.00
0274030012 UNION PVC SEL 3/4" pza 1.0000 1.35 1.35 0.00 1.35 0.00
0274040002 CONEXION A CAJA PVC SAP 3/4" pza 2.0000 1.35 2.70 0.00 2.70 0.00
0274040020 CONEXION A CAJA PVC SEL PARA INSTALACIONES ELECTRICAS 5/8" u 20.0000 1.00 20.00 0.00 20.00 0.00
0274040033 CONEXION A CAJA PVC SEL 3/4" pza 6.0000 0.85 5.10 0.00 5.10 0.00
0279000015 VIDRIO TRANSPARENTE INCOLORO DOBLE p2 55.2500 5.51 304.68 0.00 304.68 0.00

EQUIPOS
0337010001 HERRAMIENTAS MANUALES %MO 740.16 325.77 184.34 230.05
0337030000 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" u 27.6400 5.00 135.28 135.28 0.00 0.00
0337540001 MIRAS Y JALONES hm 2.4600 10.00 24.65 24.65 0.00 0.00
0348040038 CAMION VOLQUETE 4 X 2 140-210 HP 6 m3 hm 1.8200 120.00 218.25 218.25 0.00 0.00
0348090002 ANDAMIO METAL TABLAS ALQUILER est 1.9600 5.00 9.69 9.69 4.36 -4.36
0348800004 ANDAMIO METALICO hm 75.8200 5.00 379.79 170.91 170.91 37.98
0348900001 SIERRA CIRCULAR hm 2.5900 10.00 25.92 0.00 0.00 25.92
0349030001 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 9.4000 10.00 94.03 0.00 94.03 0.00
0349030074 PLANCHA COMPACTADORA 7 HP hm 0.4100 10.00 4.08 0.00 4.08 0.00
0349040003 CARGADOR SOBRE ORUGAS 150-180 HP 2.5-2.75 yd hm 1.8200 180.00 327.39 229.17 98.22 0.00
0349070006 VIBRADOR DE CONCRETO 3/4" - 2" hm 9.7700 15.00 146.54 73.27 73.27 0.00
0349070050 MOTOSOLDADORA DE 250 A hm 3.3100 5.00 16.55 0.00 16.55 0.00
0349100007 MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 16.4100 15.00 246.20 246.20 0.00 0.00
0349100011 MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3 hm 7.4800 15.00 112.26 0.00 112.26 0.00
0349880003 TEODOLITO hm 2.4600 15.00 36.97 36.97 0.00 0.00
12.-CRONOGRAMA DE DESEMBOLSO DE MATERIALES
: MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL PRONOEI SAGRADO CORAZÓN DE JESÚS DEL AA.HH. SANTA MARÍA DE TECAPA-META: CONSTRUCCIÓN DE UN AULA Y CERCO PERIMÉTRICO II
ETAPA, DISTRITO DE SAN JOSÉ, PROVINCIA DE PACASMAYO-LA LIBERTAD
: MUNICIPALIDAD DISTRITAL DE SAN JOSÈ
: AGOSTO DEL 2013

U
Código Recurso n Cantid. Precio S/. Presupuestado S/. PRIMER MES SEGUNDO MES TERCER MES
i
d
0349900012 CEPILLADORA ELECTRICA hm 2.5900 10.00 25.92 0.00 0.00 25.92
SUB CONTRATOS
COSTO DIRECTO 76,734.09 25,581.28 32,024.40 19,128.41
GASTOS GENERALES (10%) 7,673.41 2,558.13 3,202.44 1,912.84
UTILIDAD (5%) 3,836.70 1,279.06 1,601.22 956.42
SUBTOTAL 88,244.20 29,418.47 36,828.06 21,997.67
IGV (18%) 15,883.96 5,295.32 6,629.05 3,959.58
TOTAL PRESUPUESTO S/. 104,128.16 S/. 34,713.79 S/. 43,457.11 S/. 25,957.25
9.-DESCONSOLIDACION DE GASTOS GENERALES
EJECUTADA POR CONTRATA

: MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL PRONOEI SAGRADO CORAZÓN DE JESÚS DEL AA.HH. SANTA MARÍA DE TECAPA-META:
CONSTRUCCIÓN DE UN AULA Y CERCO PERIMÉTRICO II ETAPA, DISTRITO DE SAN JOSÉ, PROVINCIA DE PACASMAYO-LA LIBERTAD
: MUNICIPALIDAD DISTRITAL DE SAN JOSÈ
: AGOSTO DEL 2013
MONTO DE LA PROPUESTA A COSTO DIRECTO : S/. 76,734.09
TIEMPO DE EJECUCION : DIAS 60.00

I.0 GASTOS GENERALES FIJOS UND MONTO CANT PARCIAL % Incid.

I.1 EXPEDIENTE TECNICO


I.1.1. Tipeos,Anillados,Copias ,Planos. VEZ - - -
I.1.2. Elaboracion de Expedientes Tecnico VEZ - - -
I.1.3. Ensayos de suelos VEZ - - -
SUB TOTAL S/. : - 0.00%
TOTAL GASTOS GENERALES FIJOS S/.: - 0.00%

II.0 GASTOS GENERALES VARIABLES CANT HONOR./MES MESES PARCIAL % Incid.


II.1 DE ADMINISTRACION Y GENERALES DE OBRA
II.1.1. DIRECCION TECNICA Y ADMINISTRATIVA (Honor. Prof.) CANT HONOR./MES MESES PARCIAL % Incid.
a). Personal Profesional y Técnicos
a.1.) Ingeniero Residente (90 Dias Coef. De Partic 0.75) Incl. Liquidacion 0.5 2,000.00 3.00 3,000.00 0.75
a.2.) Maestro de Obra General(90 Dias Cohef. De partic. 0.75) 0.75 1,850.00 3.00 4,162.50

SUB TOTAL S/. : 7,162.50 9.33%

II.1.2. EQUIPO NO INCLUIDO EN LOS COSTOS DIRECTOS CANT COSTO/MES VECES PARCIAL % Incid.
a:) Viaticos por compra de materiales 1 40.91 1.00 40.91
b.) Combustible y Lubricantes para Movilidad 1 25.00 2.00 50.00
c.) Otros Servicios a Terceros Alquiler de Computadora 1 60.00 1.00 60.00
d.) Diseño de Mezcla 1 120.00 2.00 240.00
e.) Ensayos a la Resistencia del Concreto 1 15.000 8.00 120.00
SUB TOTAL S/. : 510.91 0.67%

TOTAL GASTOS GENERALES OBRA S/.: 7,673.41 10.00%


TOTAL GASTOS GENERALES VARIABLES S/.: 7,673.41 10.00%

RESUMEN DE LOS GASTOS GENERALES % Incid.

GASTOS GENERALES FIJOS-NO RELACIONADOS CON EL TIEMPO DE


- 0.00%
EJECUCION DE LA OBRA
GASTOS GENERALES VARIABLES -RELACIONADOS CON EL TIEMPO
7,673.41 10.00%
DE EJECUCION DE LA OBRA

TOTAL GASTOS GENERALES S/. 7,673.41 10.00%


UTILIDAD S/. 3,836.70 5.00%
IGV (18%) S/. 15,883.96 18.00%
TOTAL DEL PROYECTO S/. 104,128.16 100.00%

NOTA: El proyecto no incluye gastos de elaboracion de expediente ni pagos de surpevision.