SCHEDULE - C
PROJECT FACILITIES
1. Project Facilities
The Concessionaire shall construct the Project Facilities in accordance with the
provisions of this Agreement. Such Project Facilities shall include:
(a) Toll Plaza;
(b) Roadside furniture;
(c) Pedestrian Facilities;
(d) Truck Lay-Byes;
(e) Bus Shelters;
(f) Buildings For Traffic Aid Posts;
(g) Buildings For Medical Aid Posts;
(h) Rest Areas and
(i) Others;
2. Project Facilities for Four Laning/ Two Laning with Paved Shoulder
Project Facilities forming part of Four laning/ Two laning with paved shoulder and to
be completed on or before the Project completion Date have been described in
Annex-I of this Schedule-C.
Annex – I
(SCHEDULE – C)
PROJECT FACILITIES
1. Project Facilities
The Concessionaire shall construct the Project Facilities described in this Annex-I to form
part of the Two-Lane with paved shoulder Project highway. The Project Facilities shall
include:
Specifications and other requirements of the toll plaza shall be strictly as per
corresponding Manuals as specified in Annex-I of Schedule-D.
2. Pavement Markings
Pavement markings shall cover road marking provided for the entire Project Highway.
3. Crash barrier
Provide W-beam crash barrier along the project highway at the locations as suggested
in corresponding Manuals recommended in Schedule-D.
4. Delineators
Delineators for the entire Project Highway at the locations as suggested in corresponding
Manuals recommended in Schedule-D.
5. Boundary Stones
For the entire Project Highway as suggested in relevant IRC Manuals recommended in
Schedule-D.
6. Hectometer / Kilometer stones
For the entire Project Highway as suggested in relevant IRC Manuals recommended in
Schedule D.
(c) Pedestrian Facilities
Pedestrian Facilities shall be provided in accordance with the Manuals of Specifications
and Standards as referred in Schedule D.
(d) Truck Lay-byes
Truck lay byes shall be provided at the following locations for a capacity of 15 bays,
bearing the size of 7.5m x 3.5m.
Existing Design
S.No. Side Village
Chainage (Km) Chainage (Km)
1 Km. 32.117 Km. 32.700 Both Dhidwana
2 Km. 64.572 Km. 64.453 Both Shirooppura
Medical Aid Post(s) shall be deemed to be part of the Site and shall vest in the
Authority.
(h) Rest Areas
Wayside Amenities shall be provided at locations as given below :
Existing Design
S.No Side Village
Chainage Chainage
1 Km. 29.411 Km. 30.022 RHS Salempura
2 Km. 61.067 Km. 60.963 LHS Samel
Note: LHS & RHS correspond to Dausa to Kauthun direction respectively
(i) Others
1. Highway Lighting
Locations where lighting is provided along project stretch are provided in Appendix II.
4. Highway Patrol
1 (one) number of Highway Patrol unit each shall be provided at proposed toll plazas
recommended in Schedule C.
1 (one) number of GPS fitted Ambulance unit each shall be provided at proposed toll
plazas recommended in Schedule C.
6. Crane Service
1 (one) number of GPS fitted Crane unit, of minimum 20 MT capacity, shall be provided
each at proposed toll plazas recommended in Schedule C.
7. Communication System
Appendix I
Existing Design
Section
S.No. Chainage Chainage Side Location Name
(Km) (Km)
1 1.722 1.700 LHS
Dausa
2 2.322 2.300 RHS
3 5.972 5.950 LHS
Khedla Khurd
4 6.315 6.300 RHS
5 7.768 7.750 LHS
Khedla Khurd
6 8.125 8.100 RHS
7 9.816 9.808 LHS
Bhijawas
8 10.319 10.307 RHS
9 10.859 10.832 LHS
Badegaon
10 10.992 10.968 RHS
11 12.650 12.600 LHS
Badegaon
12 13.056 13.000 RHS
13 13.763 13.700 LHS
Kanpuria
14 14.166 14.100 RHS
15 19.529 19.700 LHS
Talameena
16 19.225 19.400 RHS 4 Lane Section
17 20.658 21.300 LHS
Nayawas
18 20.457 21.100 RHS
19 21.657 22.300 LHS
Patalwas
20 22.755 23.400 RHS
21 23.662 24.300 LHS
Rawas
22 23.813 24.450 RHS
23 25.663 26.300 LHS
Patalwas
24 25.361 26.000 RHS
25 26.709 27.342 LHS
Dholawas
26 27.294 27.924 RHS
27 29.779 30.400 LHS
Salempura
28 30.079 30.700 RHS
29 31.208 31.818 LHS
Ralas
30 31.402 32.000 RHS
31 32.656 33.230 LHS
Dhidwana
32 32.929 33.500 RHS
33 50.037 49.922 LHS
Lakhanpura
34 50.188 50.082 RHS
35 52.491 52.407 LHS
Bada Kapada
36 52.651 52.567 RHS
37 54.219 54.122 LHS 2 Lane section
Shivsingapura
38 54.386 54.285 RHS
39 58.520 58.425 LHS
Samel
40 58.680 58.585 RHS
41 60.040 59.943 LHS
Samel
42 59.900 59.802 RHS
Existing Design
Section
S.No. Chainage Chainage Side Location Name
(Km) (Km)
43 63.137 63.024 LHS
Datwas
44 63.297 63.185 RHS
45 65.160 65.042 LHS
Shirpura
46 65.320 65.202 RHS
47 69.756 69.642 LHS
Turkiya
48 69.916 69.802 RHS
49 71.737 71.622 LHS
Nangal Nehar
50 71.897 71.782 RHS
51 76.764 77.392 LHS
Saawaliya
52 76.924 77.552 RHS
53 78.352 78.982 LHS
Harvhawata
54 78.522 79.153 RHS
55 79.661 80.292 LHS
Bhurtiya
56 79.791 80.425 RHS
57 82.390 83.022 LHS
Kauthun
58 82.547 83.182 RHS
Note: LHS & RHS correspond to Dausa to Kauthun direction respectively
Appendix II
Built-up Locations
Double Arm Post - 76
Km 5.600 to Josh ki Poti
1 Nos.
Km 7.490