You are on page 1of 2

1.

Location : 33/132KV Pooling Substation Thaguparthy Phase-I

Feeder Name : 132KV PTR-2 HV SF6 CB

2. Equipment Details:

3. General Inspection: OK

4. IR Test:

Time: 11:10 AM Temp: 400 C Duration: 1 min

Ref Measured Values in (MΩ)


R – R’ Y – Y’ B – B’
Open
5000 5000 5000
R–E Y–E B–E
Close
5000 5000 5000
RY YB BR
Close
4000 4000 4000

5. Contact Resistance Measurement:

Time: 12:00 PM Temp: 440 C Inj. Current: 200A

Reference Measured Values in (µΩ)


R 30
Y 31
B 28

6. Timing Test: Measured Values in milliseconds

Measured Values in (ms)


Ref
R Y B
Close 57 57 57
Open 1 30 30 30
Open 2 30 30 30
Close – Open 1 34 35 35
Close – Open 2 35 35 35

7. Coil Resistance Test:

Reference Measured Values in (Ω)


Closing Coil 205.6
Trip Coil – 1 206
Trip Coil – 2 205.1
Spring Charge Motor 11.0
8. Operational Checks : (Whether Operational Checks OK / Not OK / Not Available)

1 Manual (close/open) OK
2 Breaker Should be mounted properly OK
3 Breaker Mechanical open & close indication properly working OK
4 Breaker Spring Charging Indication properly working OK

9. Comments : Nil.

10. Result : Breaker Found Healthy.