SUBPROJECT DESCRIPTION

1. Name of the Proponent LGU: Municipality of Sultan Dumalondong


2. Region: Autonomous Region in Muslim Mindanao (ARMM)
3. Province: Lanao del Sur District II
4. Income Class: 6th Class Municipality
5. Type of Subproject:

6. Please check which of the following is appropriate for your Subproject:

____Construction at new site _____ Rehabilitation


_____ Construction at old site _____ Expansion

7. Purpose/Objective of the Subproject:


1. To accommodate offices which is vital for administrations and
facilitating of services that are deem necessary for every municipal line
agencies offices;
2. To serve as facilitating agents for all the municipal activities that
takes place in the Municipality of Sultan Dumalondong.
3. To provide for the center through the offices, of all transactions
and operations of the municipality;
4. To meet the ideals and standards of Department Interior and
Local Government as mandated by the provisions of the local
government code of the Philippines
5. To provide for quality and genuine services that will make the
current administration as the catalyst of introducing a change in the
municipality.

8. Project Site (Please provide detailed description of site including vicinity):

The proposed municipal hall is located in the 1.421 hectares of family-


owned are which was donated by the members of the Bacaraman
family as reflected in the deed of donation. The municipal hall is
bounded in the area of Barangay Lumbac of Sultan Dumalondong.
9. Existing Condition of the Subproject:

This municipality is now 19 years of existence and still has no MUNICIPAL


HALL to house the offices of the Local Government Unit (LGU). In our
advocacy under the flagship of the newly minted mayor Jamel
Bacaraman Kurangking to introduce a real change in the area and our
quest to render genuine and sincere services to its constituents

10. Target Beneficiaries of the Subproject:


BENEFICIARIES BENEFITS
The targeted beneficiaries of the This will facilitate all transactions
building are the constituents of and operation of the municipality.
Sultan Dumalondong The offices that were lodged in the
municipal hall building shall cater
to the municipal mayor, vice-
mayor, Sanggunian members, line
agencies personnel and staff.

11. Possible Affected Persons/Parties and Action Plans:


AFFECTED PERSONS/PARTIES
EFFECTS ACTION PLANS
No affected persons or parties
since the land is family owned.

12. Possible Environmental Impacts:


ACTIVITY IMPACTS MITIGATING MEASURES
The building will occupy This will probably Replanting of trees and
most of the 1.42 change the beautifying it with
hectares which requires environmental decorative plants.
cutting of trees and condition of the
various improvements area.
will affect the land area
13. Estimated Project Cost
(The program of works will be attached in a separate document)

14. Funding
ITEMS AMOUNT
Equity Component (Municipality/City)
Loan P9,000,000.00
Grant
Total Cost P9,000,000.00

15. Implementation Schedule/Workplan


ACTIVITY TIME TABLE
Subproject Proposal Preparation October 12-19
Loan Processing October 23 to 31
Detailed Engineering (DE)
 Invitation November 13 to 17
 Evaluation and Awarding of Contracts November 27 to 30
 DE Plan Preparation December 4 to 6
Civil Works
 Invitation December to
 Evaluation and Awarding of Contracts January 2017
 Construction
Operation and Maintenance January to
March 2017

Prepared by:

JAMIL B. ASUM
Municipal/Provincial Planning & Development Officer

Approved by:

HON. JAMEL B. KURANGKING


Municipal Mayor
List of LGU Contact Numbers:

NAME CONTACT NUMBER’S FAX EMAIL


NUMBER ADDRESS
Hon. Jamel B. 09483829322 jamelkurangkin
g@gmail.com
Kurangking
Jamil B. Asum 09278141871 Jamilasum@ya
hoo.com

Macabantog D. 09076774479 spider_mac13@


yahoo.com
Lampaco

You might also like