SUBMISSION NOTICE

All the students from SE ,TE and BE Civil class, The final Submission for the A.Y.
2017-18 of SEM-II for the respected subject is scheduled as follows-

Class Subject Date Batch


SE 1)BMCT-a)Report of Expt., 09/04/2018 B4,B2
b)Assignments, 10/04/2018 After 3 PM B1,B3
c) Sketches
2)BDD- 10/04/2018 After 3 PM B4
a) Dwg-Residential Building
G+1Plan, Section plan, Site Plan,
Detail dwg, Schedule of
Opening, Construction Notes
b) Dwg-Public Building G+1Plan,
Section plan, Site Plan, Schedule
of Opening, Construction Notes
c) Roof Plan, Foundation Plan,
staircase section plan, and
Typical door and window Plan of
Above drawings.
d)One point/Two Point
Perspective View of Building
Plan
e) Working drawing Sheet with
CAD of Any one drawing from
above
TE 1)APH-II Experiments 10/04/2018 After 3PM B1,B2
2)GT-II Experiments(B1) 11/04/2018 After B3, B4
10AM
BE BE Project Report and 10/04/2018 After BE Students
Presentation 10AM
Follow the schedule as per given guideline without fail.

Prof. V.R. Kasar


Subject Teacher/Guide
Remedial Lab Session Notice
Date 18/04/2018

The remedial Lab sessions for SE and TE Class for the A.Y. 2017-18 of second half
of semester for the respected subject is scheduled as follows-

SE(BMCT)
Batch Content Date and Time
Batch B1, B4, B2 Revision of major 8 23/04/2018 After 2 PM
Experiments
TE(GT-II)
Batch B1 Revision of Major 6 23/04/2018 from 10AM
Experiments to 2PM
SE(BDD)
Batch B4 Discussion on Drawing 21/04/2018 After 4PM
Sheets , Submission
Drawings
All the students of respected batch attend the remedial lab sessions who were
absent during academic practical sessions.

Prof. V. R .Kasar,

Asst. Prof. Dept of Civil Engineering