Professional Documents
Culture Documents
DOCUMENTS
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
1. Introduction ......................................................................................................................................... 1
2. Description of proposed activity........................................................................................................... 2
2.1 Materials handled ..................................................................................................................... 2
2.2 Loading and unloading .............................................................................................................. 2
2.3 Process description ................................................................................................................... 3
2.4 Products ................................................................................................................................... 9
2.5 Hours of operation .................................................................................................................... 9
3. Proposal area ..................................................................................................................................... 10
3.1 General Description ................................................................................................................ 10
3.2 Tenure .................................................................................................................................... 10
3.3 Soils and elevation .................................................................................................................. 10
3.4 Land use and zoning ................................................................................................................ 11
3.5 Climate ................................................................................................................................... 11
3.6 Map and site plan ................................................................................................................... 14
3.7 Biodiversity values .................................................................................................................. 14
3.8 Rationale and alternatives....................................................................................................... 16
4. Statutory context ............................................................................................................................... 16
4.1 Commonwealth Environment Protection and Biodiversity Conservation Act 1999 .................... 17
4.2 State Policy on Water Quality Management 1997 ................................................................... 18
4.3 Existing activity details ............................................................................................................ 18
4.4 Local ....................................................................................................................................... 18
5. Potential impacts from the proposal .................................................................................................. 28
5.1 Stormwater management ....................................................................................................... 28
5.2 Significant areas ...................................................................................................................... 28
5.3 Air emissions........................................................................................................................... 29
5.4 Liquid effluent......................................................................................................................... 29
5.5 Solid wastes ............................................................................................................................ 29
5.6 Noise emissions ...................................................................................................................... 30
5.7 Transport impacts ................................................................................................................... 30
5.8 Other off-site impacts ............................................................................................................. 30
5.9 Hazardous substances ............................................................................................................. 30
5.10 Site contamination (historical) ................................................................................................ 31
5.11 Climate change ....................................................................................................................... 31
5.12 Sites of high public interest ..................................................................................................... 32
5.13 Monitoring .............................................................................................................................. 32
5.14 Rehabilitation ......................................................................................................................... 32
6. Commitments .................................................................................................................................... 33
7. Consultation ...................................................................................................................................... 34
List of figures
Figure 1 Materials processing ....................................................................................................................... 4
Figure 2 General locality ............................................................................................................................. 10
Figure 3 Mean maximum temperature over time (Source: Bureau of Meteorology) .................................... 12
Figure 4 Mean minimum temperature over time (Source: Bureau of Meteorology) .................................... 12
Figure 5 Average monthly rainfall over time (Source: Bureau of Meteorology) ............................................ 13
Figure 6 Wind rose for Ti Tree Bend 9:00 am – 1980 to 2017 (Source: Bureau of Meteorology)................... 13
Figure 7 Wind rose for Ti Tree Bend 3:00 pm – 1980 to 2017 (Source: Bureau of Meteorology) .................. 14
Figure 8 Locality map .................................................................................................................................. 15
Figure 9 Zoning map ................................................................................................................................... 19
List of plates
Plate 1 Oil stored prior to processing ............................................................................................................ 5
Plate 2 Wash down upon delivery ................................................................................................................. 5
Plate 3 Oil filters stored for processing .......................................................................................................... 6
Plate 4 Part of current water processing system ........................................................................................... 6
Plate 5 Part of current water / oil separation system .................................................................................... 7
Plate 6 Trays of oil solids draining at current site........................................................................................... 7
Plate 7 Labelled drums of recycled product pending sale .............................................................................. 8
Plate 8 Plastic drums waiting for filling with recycled product ....................................................................... 8
Appendices
Appendix A: Plans of proposed development
Appendix B: Title documents
Appendix C: Protected Matters Search
Revision History
Rev
Description Prepared by Reviewed by Authorised by Date
No.
A Draft to client L. Knight I. Woodward I. Abernethy 3/11/2017
B Draft to EPA L. Knight I. Abernethy I. Abernethy 8/11/2017
C Final to EPA L. Knight I. Abernethy I. Abernethy 29/11/2017
0 Final for DA lodgement L. Knight I. Abernethy I. Abernethy 4/12/2017
1 Revisions for TasWater RFI L Knight I. Abernethy I. Abernethy 8/3/2018
2 Final for advertising L Knight I. Abernethy I. Abernethy 11/7/2018
© 2017 pitt&sherry
This document is and shall remain the property of pitt&sherry. The document may only be used for the purposes for
which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorised use of
this document in any form is prohibited.
1. Introduction website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
The Gourmet Oil Company (Australia), trading as Hagen Oil Pty Ltd, proposes the relocation of an existing oil
recycling facility from 26 Murphy St Invermay to 1 Venture Court, Invermay.
The Environment Protection Authority (EPA) advised on 4 August 2017 that the environmental impact of the
above proposal will be assessed by the Board of the Environment Protection Authority (the Board) as a class
2A assessment under the Environmental Management and Pollution Control Act 1994 (the EMPC Act).
The EPA issued guidelines for the preparation of this Environmental Effects Report (EER) in August 2017 and
this EER follows the format and heading system as suggested in that advice.
The Murphy St site operates under Environment Protection Notice (EPN) No 7804/1 which provides for the
use of the site as an oil refinery where “used oil is refined or reprocessed by filtration or physical or chemical
separation”. All waste water is discharged to an external treatment plant. This EPN outlines requirements for
decommissioning and rehabilitation of the site including a requirement for the submission of a draft
Decommissioning and Rehabilitation Plan (DRP) prepared in accordance with any guidelines provided by the
Director. This will include removal or mitigation of all environmental hazards or land contamination likely to
pose an ongoing risk.
Part B Proposal description reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
The proposal involves the relocation of the existing Hagen Oil facility from 26 Murphy St to 1 Venture Court,
Invermay. The operation will be located within an addition to the existing building on that site. This addition
was approved by City of Launceston Council (DA0490/2016 on 10 January 2017) and complies with all
requirements of the Launceston Interim Planning Scheme 2015 and building requirements. The office
component of the approved development has been constructed.
Hagen Oil currently operate under the following permits which will be renewed at the new premises:
• Controlled Waste Handler Certificate of Registration.
• Tasmanian Fire Service approved plan
• Safe Work Tasmania compliance.
The following sections of this report outline the processes involved. Site plans showing the location of
equipment and processing facilities are provided in Appendix A.
Solid wastes in small amounts may also be accepted where they form part of the oil or oil/water mixtures.
The site will not accept the following:
• any form of PCB or PBB material (these are shipped to Sibelco at Mole Creek with appropriate disposal
documents)
• solvents in any form
• organochlorine or organophosphate pesticides
• grease trap waste.
The operation may look to expanding its operations to take grease trap waste in the future but that does not
form part of this application.
The process for waste receipt and processing at the site will be as follows: reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
• Trucks enter the yard with tankered materials or individual 205 L drums. Trucks are compartmentalised
to allow for separate containment of coolant, mixed fuels and waste oils. Waste oils, coolant and other
product is also delivered to the site in small containers (retails size bottles, etc).
• Material is checked against transmittal papers, the volume measured and logged into a database on
arrival.
• A sample of the material is assessed for odour, colour and the presence of solids. A flame test is carried
out and laboratory analysis may be undertaken if required.
• If the material does not meet specifications and is unable to be processed it is not accepted by Hagen Oil
and is sent back to the source. The responsibility for appropriate disposal lies with the person generating
the material. If material does not meet specifications but is suitable for on-processing elsewhere then it
will be stored in a bunded and covered area for forwarding to interstate processors.
• After initial assessment, the liquid oil wastes are discharged via hose to a waste oil settling tank which
allows oil to be skimmed off and water to be discharged to holding tanks.
• Other materials (coolant, oil filters, etc) are transferred to respective storage areas. Coolant is treated
using separation by gravity to remove any solids then is stored for re-sale or discharged to the general
waste water stream for processing (see below). The resultant effluent is discharged to the TasWater
system in accordance with the relevant trade waste agreement (TWA). Containers are stored for
processing (see below).
• Oil filters are drained and then stored pending sale – they are not washed
• Plastic bottles are drained, rinsed, crushed or shredded then either stored in bins or baled up and stored
on the floor until a sufficient quantity is accumulated for sale
• Oil drums have the tops removed, are drained, washed then crushed and baled up – these are stored on
the floor pending sale as scrap
• Water from rinsing drums or containers goes through the waste water stream
• Mixed diesel/petrol is collected for storage for sale - this generally occurs within 3 months of collection
• Waste oil and oil/water mixes are directed to a series of oil settling tanks for further refinement
• Some of the settling processes may take up to several months to achieve the objective of separation for
reuse or management. No mechanical agitation processes or chemicals are utilised. Any solid material
that settles to the bottom of the tank is treated as solid waste after excess oil is drained
• Oil is decanted off and put through a number of further settlement/filtration processes until graded and
placed into individual containers for storage prior to sale
• Sludge is allowed to settle and separate multiple times until it is reduced enough to be dried (in the open
air – no heat application or other means) – then sold or disposed of to landfill
• Any waste water generated is processed prior to discharge to sewer. This is treated by settling and
decanting and removal of solids. The final step involves detention and treatment to reduce the levels of
glycol, hydrocarbons, metals and BOD/COD. This will aim to reduce the concentration of these
contaminants to levels suitable for discharge to the sewage treatment plant (STP). The final waste water
will be discharged as trade waste in accordance with the TWA.
• Waste will be stored in JJ Richards skip bins under cover. No bins will be stored in the open.
This process is indicated schematically in Figure 1 with photographs of the current operation in Plate 1 to
Plate 8.
2.4 Products
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
The operation will generate approximately 3000 tonnes of recycled oil products per annum. Oil drums are
cleaned for resale while containers (including surplus drums) are drained and/or cleaned and sold for
recycling. The following volumes of material/product are present on site at any given time (Table 1).
Material Maximum present From 2015 return Volume sold / From 2016 return
on site disposed of per
annum
Oil 300,000 L 2,000,000 L 1,700,000 L
Oily solids 7 m3 2-3 tonnes sold
Oil water mix 250,000 L
Coolant 20,000 L 31,800 L As much as 31,800 L
possible
Diesel / fuel mix 5000 L All received
Oil filters 2 tonnes 40 tonnes All received 40.5 tonnes
General solid 1 skip bin 21.6 tonnes To waste 21.6 tonnes
waste (eg plastics management
in oil) facility (21.6
tonnes year
ending June 15)
Waste water 1,100,000 L To sewerage as 1,900,000 L
trade waste including truck
washout
Drums 2329 All 282
Construction of the building has been approved and is expected to commence upon approval of the use of
the facility.
3.2 Tenure
The land parcel is legally described as PID: 2903297 and Title Reference: 155196/1. A copy of the title is
provided in Appendix B. Figure 2 presents an aerial image which shows the site and general location.
The land is generally flat, being located on an alluvial plain. Soils on site are mapped in the Mineral Resources
Tasmania (MRT) Geological Polygons, 1:25,000 mapping.
The site is zoned General Industrial under the Launceston Interim Planning Scheme 2015 (the Planning
Scheme) and was previously used as a depot for the housing and maintenance of buses (Sainty’s Coaches).
The area is predominantly industrial in nature with the long term presence of the STP limiting the nature of
development in the locality. The sports fields are used as required by the school, including on week days and
weekends, when the proposed facility will not be in use.
There is residential development (approximately 85 lots) within 500 m of the site, to the south and east.
However, the latter is separated from the site by the highway. The nearest residential development is located
approximately 180 m to the south off Weaving Place.
3.5 Climate
A weather station is located at the Ti-Tree Bend STP. Data for the period 1980 to 2017 from
http://www.bom.gov.au/climate/averages/tables/cw_091237.shtml was accessed on 7 September 2017.
The average summer maximum temperature is 24.6 oC and the average winter maximum temperature is
12.6 oC. The average summer minimum temperature is 12.3 oC and the average winter minimum is 2.3 oC.
These records are consistent with patterns since 1980 as demonstrated in Figure 3 and Figure 4. The highest
rainfall is recorded during July and August. The period between April and November typically averages a
minimum of 50 mm a month as demonstrated in Figure 5. Winds are predominantly (approximately 50%)
from the north and north east throughout the day and predominantly less than 30 km/hr in strength in the
later portion of the day. Morning winds are predominantly less than 10 km/hr. Wind roses for 9:00 am and
3:00 pm are provided at Figure 6 and Figure 7.
PLANNING EXHIBITED
DOCUMENTS
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
PLANNING EXHIBITED
DOCUMENTS
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Figure 6 Wind rose for Ti Tree Bend 9:00 am – 1980 to 2017 (Source: Bureau of Meteorology)
Figure 7 Wind rose for Ti Tree Bend 3:00 pm – 1980 to 2017 (Source: Bureau of Meteorology)
The proposal involves the relocation of an existing oil recycling business to a new site. The facility will be
established as new on this site and will better accommodate the operational and space requirements of the
business. The processing will all be conducted under cover which reduces the potential for the movement of
oils into stormwater and lowers the potential for odour and visual impacts. There is sufficient area on site for
the manoeuvring of large vehicles and parking of all employee and client vehicles.
The alternative is to leave the facility at its current location which is undesirable from operational and
environmental perspectives. There is insufficient land area at the current site and some processes and
storage are located in the open where they are exposed to the elements. The use proposed requires an
industrial location and the proposed location is appropriately zoned and located near uses that will not be
impacted by the operations.
4. Statutory context
Legislation exists at federal, state and local levels directed at the protection of the environment and the
sustainable management of development. This legislation and its effect is summarised in Table 2 and relevant
requirements discussed in this section.
Statute Requirement
Commonwealth
Environment Protection and This act provides for the protection of nationally significant species
Biodiversity Conservation Act and ecological communities as well as compliance, enforcement and
1999 (EPBC Act) fines. All activities require consideration against this act.
An assessment against this act is included in this EER.
State
Aboriginal Relics Act 1975 This act relates to the protection of Aboriginal cultural heritage. The
site has been developed and no additional ground disturbance is
proposed. No impacts on Aboriginal cultural heritage are expected.
Environmental Management and The proposal is a Level 2 activity under Schedule 2 of EMPCA. The
Pollution Control Act 1994 Board of the Environmental Protection Authority will assess the
(EMPCA) potential environmental impacts in accordance with this Act and, if it
allows the project to proceed, will determine conditions for Council to
include in the permit if the project is approved. Regulations and
environmental protection policies made under EMPCA will also apply
to the proposed activity.
Statute Requirement content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Historic Cultural Heritage Act This Act relates to the protection of European and other cultural
1995 heritage. The site has been developed and no additional ground
disturbance is proposed. No impacts on heritage are expected.
Land Use Planning and Approvals Under LUPAA, Councils are required to administer the development
Act 1993 (LUPAA) and use of land within their municipal boundary. The assessment of
development and use is undertaken in accordance with the relevant
planning scheme. This proposal will be the subject of a permit
application under LUPAA to Launceston City Council.
Nature Conservation Act 2002 This act identifies and regulates threatened native vegetation
communities.
The site is comprised entirely of hardstand and existing infrastructure
and no remnant vegetation is present. There are no requirements
under this act.
The State Policies and Projects Act Currently there are three State policies
1993 established the process to • State Coastal Policy 1996
put in place State policies under
• State Policy on Water Quality Management 1997
the RMPS of Tasmania.
• State Policy on Protection of Agricultural Land 2009
The Coastal Policy is applicable to State waters and land within one
kilometre inland of the high-water mark. The site is not within the
coastal zone. The site is not prime agricultural land and is not subject
to the last of these policies. This report assesses the impact of the
policy on water quality management.
Threatened Species Protection Act This act lists threatened species and regulates activities that may
1995 result in their disturbance. The requirements of this act are addressed
in this EER.
The site and land in the locality has been cleared and there is no native
vegetation in close proximity other than limited riparian vegetation
300 m to the north.
Weed Management Act 1999 This act declares certain plants as weeds and outlines measures for
their control, including land owner obligations.
Local
Launceston Interim Planning The proposal is located within the boundaries of the Launceston local
Scheme 2015 (Planning Scheme). government area. The proposed use and development will be
assessed in accordance with the Planning Scheme.
Some terrestrial carnivores (raptors, quolls and devils) have potential to occur within the wider locality
outside Launceston urban area but the site does not offer any suitable habitat for these species or for the
other species recorded throughout Launceston, the swift parrot. The site is comprised entirely of hardstand
and existing infrastructure and no remnant vegetation is present. The proposed project is not expected to
have any impact on matters of MNES and does not propose any MNES actions. Referral under the EPBC Act
is therefore not required.
The State Policy on Water Quality Management 1997 contains provisions that require consideration of
erosion and stormwater controls during construction and use to ensure that best practice environmental
management is implemented at development sites. It is considered that the planning scheme and EPA
requirements, with input from TasWater, will ensure that a best practice approach to stormwater
management is adopted.
The proposed use will be conducted in a purpose-built facility with no exposure to rain, limiting the potential
for any waterborne contaminants to enter stormwater systems. Any spills will be contained by bunding and
collected for return to the processing facilities on site. The car park and turning areas will be sealed to prevent
the generation of dust and transport of sediment into stormwater systems.
PLANNING EXHIBITED
DOCUMENTS
4.3 Existing activity details Ref. No:
Date
DA 0656/2017
advertised: 25/07/2018
Hagen Oil currently operates under the following: Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
• Environment Protection Notice 74804/1 content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
• TasWater Agreement D13/72 – a new agreement for continued operations is being negotiated
• Controlled Waste Handler Registration No CWTEMP139TA.
During the 2015 and 2016 reporting periods there were no complaints received and no incidences of non-
compliance.
4.4 Local
The land is within the area covered by the Launceston Interim Planning Scheme 2015 (the Planning Scheme).
The following Planning Scheme definitions apply to the proposed development:
• Recycling and waste disposal - which means the use of land to collect, dismantle, store, dispose of, recycle
or sell scrap material. Examples include a recycling depot, refuse disposal site, scrap yard, vehicle
wrecking yard and waster transfer station.
• Level 2 activity which means a use defined under the Environmental Management and Pollution Control
Act 1994. Specifically, the activity is listed in Schedule 2 of EMPCA under Part 1. Petroleum and Chemical,
(c) Oil refineries: the conduct of works at which crude petroleum oil or shale oil is refined, at which
lubricating oil is produced or at which used oil is refined or reprocessed by filtration or physical or
chemical separation.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 18
4.4.1 Zoning content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
The site is zoned General Industrial under the Planning Scheme as shown in Figure 9. Within the General
Industrial zone recycling and waste disposal is generally a Permitted use; however, in this case there are
overlays applicable to the site which alter the level of assessment to Discretionary.
4.4.2 Zone Purpose (numbers reflect clauses within Interim Planning Scheme)
Purpose statements applicable to the General Industrial zone are:
• 25.1.1.1 To provide for manufacturing, processing, repair, storage and distribution of goods and materials
where there may be impacts on neighbouring uses.
• 25.1.1.2 To provide for uses that are complementary to and compatible with the above purpose.
The proposed use is consistent with the purpose of the zone. The relocation of the facility to this site will
allow for improved operating conditions and consequently improved environmental management outcomes.
The site is located adjacent industrial land, playing fields and the STP with limited potential for impacts on
residential uses in the locality.
There are no local area objectives or desired future character statements for the General Industrial zone.
Use standards
• Invermay/Inveresk Flood Inundation Area – Riveredge Industrial content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Level 2 activities assessed by the Board of the Environment Protection Authority are exempt from application
of the Environmental Impacts and Attenuation Code. Issues associated with the construction of a building in
a flood affected area were addressed in the DA for the building extension. The Invermay/Inveresk Flood
Inundation Area Code also applies to use and is considered below.
4.4.7 Codes
Within the Interim Planning Scheme there are a number of Codes which need to be considered. These are
addressed below and comments provided where applicable. The prefixes refer to the Codes as presented
within the Interim Planning Scheme.
Code Comment
E1.0 Bushfire-Prone Areas Code Not applicable
E2.0 Potentially Contaminated Not applicable – the use proposed is not a sensitive use or a use
Land Code specified in Table E2.2.1. The subject land has not been subject to
a notice issued under the EMPC Act or issued a permit for a
potentially contaminating activity. The use of the site as a bus
depot is not one which is likely to result in site contamination
however any materials present on site would be consistent with
those likely to be present under the proposed use (e.g. oils,
coolant, etc).
E3.0 Landslide Code Not applicable
E4.0 Road and Railway Assets Code See below
E5.0 Flood Prone Land Code Not applicable - This Code does not apply to use and development,
including subdivision, on land shown within Code E16.0
Invermay/Inveresk flood inundation area on the planning scheme
overlay maps
E6.0 Parking and Sustainable See below
Transport Code
E7.0 Scenic Management Code Not applicable
E8.0 Biodiversity Code Not applicable
E9.0 Water Quality Code Not applicable
E10.0 Open Space Code Not applicable – no subdivision proposed
E11.0 Environmental Impacts and Not applicable - level 2 activities assessed by the Board of the
Attenuation Code Environment Protection Authority are exempt from this code.
E12.0 Airports Impact Not applicable
Management Code
E13.0 Local Historic Cultural Not applicable
Heritage Code
E14.0 Coastal Code Not applicable - land shown within Code E16 Invermay/Inveresk
Flood Inundation Area on the planning scheme overlay maps is
exempt.
E15.0 Telecommunications Code Not applicable
E16.0 Invermay/Inveresk Flood See below
Inundation Area Code
E17.0 Cataract Gorge Management Not applicable
Area Code
E18.0 Signs Code Not applicable – no signs are proposed
E19.0 Development Plan Code Not applicable
Use Standards
E4.5.1 Existing road accesses and junctions
To ensure that the safety and efficiency of roads is not reduced by increased use of existing accesses
and junctions.
Acceptable solution Comment
A1 – applies to Category 1 and 2 roads Not applicable
A2 – applies to roads with a speed limit in excess Not applicable
of 60 km per hour
A3 Complies
The annual average daily traffic (AADT) of vehicle Vehicle numbers will not increase by more than
movements, to and from a site, using an existing 20% or by 40 vehicle movements per day.
access or junction, in an area subject to a speed
limit of 60km/h or less, must not increase by more
than 20% or 40 vehicle movements per day,
whichever is the greater.
Development Standards
E4.6.1 Development adjacent to roads and railways
To ensure that development adjacent to category 1 or category 2 roads or the rail network:
(a) ensures the safe and efficient operation of roads and the rail network;
(b) allows for future road and rail widening, realignment and upgrading; and
(c) is located to minimise adverse effects of noise, vibration, light and air emissions from roads and the
rail network.
Acceptable solution Comment
A1.1 Not applicable
Except as provided in A1.2, the following
development must be located at least 50m from
the rail network, or a category 1 road or category
2 road, in an area subject to a speed limit of more
than 60km/h:
(a) new buildings;
(b) other road or earth works; and
(c) building envelopes on new lots.
A1.2 Not applicable
Buildings must be:
(a) located within a row of existing buildings and
setback no closer than the immediately adjacent
building; or
(b) an extension which extends no closer than:
(i) the existing building; or
(ii) an immediately adjacent building.
E4.6.2 Road accesses and junctions
To ensure that the safety and efficiency of roads is not reduced by the creation of new accesses and
junctions
Acceptable solution Comment
A1 Not applicable
No new access or junction to roads in an area
subject to a speed limit of more than 60km/h.
A2 Complies
(b) rail level crossings must comply with AS1742.7 Planning Administration
This document is subject to copyright and is protected by law. In displaying this
Use Standards
E6.5.1 Car parking numbers
To ensure that an appropriate level of car parking is provided to meet the needs of the use.
Acceptable solution Comment
A1 Satisfies performance criteria
The number of car parking spaces must:
(a) not be less than 90% of the requirements of The site has an area of 4,115 m2 requiring 8 spaces
Table E6.1 (except for dwellings in the General with an additional 10 spaces required for staff (18
Residential Zone); or total).
(b) not be less than 100% of the requirements of
Table E6.1 for dwellings in the General Residential 14 car spaces are provided on site which is less
Zone; or than 90% of the above requirement. However, as
(c) not exceed the requirements of Table E6.1 by the 10 employees working on site include part
more than 2 spaces or 5% whichever is the time and job/share workers it is not considered
greater, except for dwellings in the General necessary for a space to be allocated for each.
Residential Zone; or Additionally, the use proposed is restricted to the
(d) be in accordance with an acceptable solution bunded and internal areas on site which have an
contained within a parking precinct plan. area significantly less than the total site area
(approximately 1583 m2). There is no capacity for
The code requires the provision of: the use to expand beyond the bunded area due to
licensing requirements to meet environmental
obligations. If calculated on the actual area to be
Development Standards
E6.6.1 Construction of parking areas
To ensure that parking areas are constructed to an appropriate standard.
Acceptable solution Comment
A1 Complies
All parking, access ways, manoeuvring and
circulation spaces must: PLANNING EXHIBITED
(a) have a gradient of 10% or less; DOCUMENTS
DA 0656/2017 Ref. No:
(b) be formed and paved; Date
25/07/2018 advertised:
(c) be drained to the public stormwater system, or Planning Administration
contain stormwater on the site; This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
A1.2
All accessible spaces for use by persons with a
disability must be located closest to the main
entry point to the building.
A1.3
Accessible spaces for people with disability must
be designated and signed as accessible spaces
where there are 6 spaces or more.
A1.4
Accessible car parking spaces for use by persons
with disabilities must be designed and constructed
in accordance with AS/NZ2890.6 – 2009 Parking
facilities - Off-street parking for people with
disabilities.
E6.3.3 to E6.3.6 and E6.7 not applicable
Development Standards
E16.7.1 Intensification of residential development – not applicable
E16.7.2 Flood Impact.
To ensure that new buildings and infrastructure are sited and designed to avoid or mitigate the risk and
minimise the impact of flooding
Acceptable solution Comment
A1 Not applicable
Floor levels of all habitable rooms within the
Residential use class must be at least 3.7m AHD.
A2 Not applicable
PLANNING EXHIBITED
DOCUMENTS
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
5. Potential impacts from the proposal This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
All processing will occur under cover to ensure that rain is not falling on stored materials or processing
equipment. Internal areas where processing occurs will be bunded to ensure any spills are contained. The
location of all operations under cover in bunded areas prevents the release of potential pollutants to
stormwater systems. Pits in the operational/bunded areas will be pumped out and material processed
through the facility to maximise recovery of oils. Residual water will be discharged in accordance with the
TWA.
Materials in the tanks on site will be undergoing different stages in the separation and recycling process and
the tanks are not interconnected. The largest tank volumes in the bunded areas are 55,000 L and 22,000 L.
The requirements are that the bunded area have a capacity equivalent to the greater of the following:
• at least 110% of the combined volume where tanks are interconnected – not applicable
• at least 110% of the volume of the largest vessel – 55,000 L tanks require 60,500 L; 22,000 L tanks require
24,200 L
• at least 25% of the total volume of all vessels in that bunded area – 41,250 L and 33,000 L required for
the areas proposed
• the capacity of the largest tank plus the output of the firewater system over a 20 minute period (fire
system output unknown)
The relevant volumes for the tank storage areas proposed are 60,500 L (three tank area) and 33,000 L (six
tank area). The bunded capacity of these areas is 169,000 L and 158,000 L respectively. This exceeds the
requirements for storage of hazardous substances (which includes fuels and oils) in tanks that are not
interconnected.
Processing predominantly occurs in closed tanks, all under cover which prevents any ingress of rainfall. Winds
(and therefore rain drift) are predominantly from the northwest and north which are areas occupied by the
truck access and three large tanks. Much of the process area is located behind the office/truck parking
(existing building) section of the building.
The site has been filled above the 1% ARI flood event and during flood events no material will be brought to
the site for processing due to the disruption of transport routes. This will prevent the need for storage of
materials outside covered areas.
Tamar River and riparian zone is zoned Environmental Management; however, this is 260 m from the site
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Any potential odours should also be considered in light of the STP which is located directly opposite and is a
continuous source of odours significantly greater than the odour of oil. No mitigation is considered necessary.
Prior to commencement of operations at the new site all equipment will be installed and tested to ensure
proper operation. During commissioning of the facility monitoring of all proposed discharges will be
undertaken prior to release to ensure compliance criteria are met. During operations, ongoing monitoring
will be carried out to ensure continued compliance including monthly and quarterly testing for biological
factors such as pH, nutrient levels, BOD, chemical oxygen demand, salts, suspended solids, glycol, sulphides,
dissolved solids and metals.
A new TWA is being developed in consultation with TasWater. Details of a trade waste management plan will
be part of that process.
No discharge to the environment is proposed. Waste water is stored in tanks within bunded areas to prevent
any accidental escape to the environment. During times of high pressure on the treatment plant (e.g.
flooding) deliveries to the facility will be limited by road closures. Materials delivered can only be
accommodated in tanks so there is no uncontrolled storage of substances on site. No mitigation or changes
are considered necessary.
•
advertised: 25/07/2018
C&D – 5 Planning Administration
This document is subject to copyright and is protected by law. In displaying this
• C&D – 4
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
• C&D – 2
These categories fall within the Commercial and Industrial Waste and the Construction and Demolition Waste
groups.
Processing involves filtration and gravity separation with no mechanical equipment other than pumps
involved. The nearest sensitive receptor is located approximately 180 m to the south off Weaving Place and
separated from the site by a bus depot and other industrial activities. No mitigation is considered necessary.
The terms hazardous waste, prescribed waste and controlled waste are used by various Australian
environment protection agencies and to all intents and purposes are interchangeable. Tasmania has adopted
the terminology of the National Environment Protection (Movement of Controlled Waste between States
and Territories) Measure 2004 (NEPM) which uses the term controlled waste.
Controlled waste includes those wastes that exhibit toxicity, chemical or biological reactivity, environmental
persistence, or the ability to bio-accumulate or enter the food chain. These wastes may be produced in a
gaseous, liquid or solid state. Controlled wastes are listed in the regulations and the handling of them requires
the approval of the Director of the EPA. Gourmet Oil (Australia) Pty Ltd hold a current Controlled Waste
Handler Certificate of Registration (CWTEMP139TA) and any controlled waste generated from treatment or
pre-treatment will be managed under this certificate. This certificate registers Gourmet Oil as a controlled
waste agent and transporter and covers the following:
• Acidic solutions or acids in solid form
• Basic Solutions or bases in solid form
• Waste from the production, formulation and use of inks, dyes, pigments, paints, lacquers and varnish
• Waste from the production, formulation and use of resins, latex, plasticisers, glues and adhesives
• Waste oil/water, hydrocarbons/water mixtures or emulsions
PLANNING EXHIBITED
• Containers which are contaminated with residues of substances referred to in this list* DOCUMENTS
DA 0656/2017
•
Ref. No:
Soils contaminated with a controlled waste Date
advertised: 25/07/2018
• Encapsulated, chemically-fixed, solidified or polymerised wastes referred to in this list* Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
• Filter cake contaminated with residues of substances referred to in this list*. website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
*Note that “in this list” means in Schedule A – List 1: Waste Categories, of the NEPM as varied November
2010.
5.13 Monitoring
During commissioning of the facility monitoring of all proposed discharges will be undertaken prior to release
to ensure compliance criteria are met. Ongoing monitoring will be carried out to ensure continued
compliance, as outlined in the self-monitoring program requirements in the draft transitional agreement for
the current Murphy St site of the facility. This includes testing of biological factors such as pH, nutrient levels,
BOD, chemical oxygen demand, salts, suspended solids, dissolved solids, glycol and metals.
5.14 Rehabilitation
The site is already developed and the current proposal is not expected to have any significant impact on the
nature of the site or the surrounding land. In the event that the facility ceases to operate there will be
significant infrastructure on site available for future users. However, there are no environmental features
that will warrant rehabilitation. The permit issued is expected to outline decommissioning requirements and
a Decommissioning and Rehabilitation Plan will be required to be prepared.
PLANNING EXHIBITED
DOCUMENTS
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Planning Administration
25/07/2018
6. Commitments
The following commitments are proposed to ensure that operations do not result in environmental
impacts.
Commitments
7. Consultation website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
No consultation has been undertaken with the community or adjoining land owners. This proposal represents
an opportunity to relocate the existing facility from a site which is no longer suitable and is the outcome of
several years of discussions with Council and the EPA. There will be a statutory public consultation period
once the application is lodged with Council.
Appendix A
SITE DETAIL
G ILM ER
MAIN
m
• IS NOT A COMPLETE REPRESENTATION OF ALL SURFACE AND
UNDERGROUND DETAIL.
WAT
EX. 48
85. • SHOULD ONLY BE USED FOR THE PURPOSES INTENDED.
ARY
BO
UN D
BO THE LOCATIONS OF UNDERGROUND SERVICES ARE
UND
APPROXIMATE ONLY AS INDICATED BY SURFACE FEATURES.
PROPOSED NEW INLINE FIRE
AR
PLUG IN ROAD RESERVE TO
5m
RM
A IN PRIOR TO ANY CONSTRUCTION REFER TO RELEVANT AUTHORITIES
Y4
AT E
EX.
W BE INSTALLED BY TAS WATER FOR DETAILED LOCATION OF ALL SERVICES.
EAS
AT DEVELOPERS EXPENSE INSTALL NEW
2.8
GATES FOR TAS CONTOUR INTERVAL 0.1m
8m
ME
FIRE ACCESS
NT
12 LEGEND
11
00 BOL BOLLARDS TO DETAIL
200
EXISTING SURFACE TO REMAIN PROPOSED RECYCLING
CENTRE UNDER STAGE 1
COVERED AREA
10
9
8 14
LAN
BOL
7
DS
6 13 EX. PIT
9
728
CA
BOL
PIN
RY
G
T
EN
0
412
1-
T A GE USLY 315
0
S O
EVI
BOL
ED
PR ROV
P
132
AP
0
BOL
EX
00
0
227
1 EXISITNG WAREHOUSE
EXI ER P
SEW
STI
NG IPE
2
VEN
3
TUR
30
EX.
00
LAN
WA
BOL
DS
TER
EC
4
CA
BO
MA
P IN
IN
G
UND
OUR
5
AR
3m
9 4.8
Y4
Y
AR
T
UND
4.0
BO
Y
TR
0
EN
m
IT
EX
LAN
DS
CA
PIN
G
Client name:
A NOTE:
500 HIGH BUNDING WALLS DIMENSIONS DO NOT INCLUDE CLADDING
2000
55,000 LITRE OIL TANK
2000
ON GROUND
3000 ø
3000 ø
PIT
L
O
O
C
C
EX
EX
1500
55,000 LITRE OIL TANK BUNDED AREA VOLUME
ON GROUND CAPACITY - 169m3
3000 ø
OR 169,000 LITRES
L
O
C
EX
FHR
10000
DR
L.
L.
EX
L.
O
O
IVE
.C
.C
.C
.C
EX
EX
EX
OV
L.
ER
32854
BU
ND
ING
L
O
C
S
FL
EX
LL
WA
AP
FHR
G
N D IN
BU
H
H IG
00
5 TRUCK ON-LOAD AREA
L
O
4000 LITRE CAPACITY
C
EX
PIT PIT
L.
O
.C
EX
L.
LL
WA
O
.C
G
EX D IN
L
DRIVE OVER BUNDING FLAP
O
C
EX
EX EX EX
L.
.C .C .C
O
O O O
L. L. L.
EX
22,000L WATER 22,000L WATER 22,000L WATER 22,000L WATER 22,000L WATER 22,000L WATER
TANK - UPRIGHT TANK - UPRIGHT TANK - UPRIGHT TANK - UPRIGHT TANK - UPRIGHT TANK - UPRIGHT
B
500 HIGH
L
L
BUNDING WALLS
O
O
C
C
EX
EX
EX
EX
EX
EX
EX
EX
FLOOR PLAN
1 : 100
29/06/2017 1 : 100 @ A1
Project/Drawing no: Revision:
PD16213 - 02 04
Document Set ID: 3846903 Accredited building practitioner: Frank Geskus -No CC246A
Version: 1, Version Date: 18/07/2018
PLANNING EXHIBITED
DOCUMENTS
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Client name:
GOURMET OIL (AUSTRALIA) PTY
LTD
Drawing:
PERSPECTIVES
29/06/2017 @ A1
Project/Drawing no: Revision:
PD16213 - 03 04
Document Set ID: 3846903 Accredited building practitioner: Frank Geskus -No CC246A
Version: 1, Version Date: 18/07/2018
PLANNING EXHIBITED
DOCUMENTS
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Appendix B
Title documents
Appendix C
Information on the coverage of this report and qualifications on data supporting this report are contained in the
caveat at the end of the report.
Information is available about Environment Assessments and the EPBC Act including significance guidelines,
forms and application process details.
Summary
Details
Matters of NES
Other Matters Protected by the EPBC Act
Extra Information
Caveat
Acknowledgements
Coordinates
Buffer: 1.0Km
Planning Administration
DA 0656/2017
25/07/2018
This part of the report summarises the matters of national environmental significance that may occur in, or may
relate to, the area you nominated. Further information is available in the detail part of the report, which can be
accessed by scrolling or following the links below. If you are proposing to undertake an activity that may have a
significant impact on one or more matters of national environmental significance then you should consider the
Administrative Guidelines on Significance.
This part of the report summarises other matters protected under the Act that may relate to the area you nominated.
Approval may be required for a proposed activity that significantly affects the environment on Commonwealth land,
when the action is outside the Commonwealth land, or the environment anywhere when the action is taken on
Commonwealth land. Approval may also be required for the Commonwealth or Commonwealth agencies proposing to
take an action that is likely to have a significant impact on the environment anywhere.
The EPBC Act protects the environment on Commonwealth land, the environment from the actions taken on
Commonwealth land, and the environment from actions taken by Commonwealth agencies. As heritage values of a
place are part of the 'environment', these aspects of the EPBC Act protect the Commonwealth Heritage values of a
Commonwealth Heritage place. Information on the new heritage laws can be found at
http://www.environment.gov.au/heritage
A permit may be required for activities in or on a Commonwealth area that may affect a member of a listed threatened
species or ecological community, a member of a listed migratory species, whales and other cetaceans, or a member of
a listed marine species.
Extra Information
This part of the report provides information that may also be relevant to the area you have nominated.
Matters of National Environmental Significance This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Botaurus poiciloptilus
Australasian Bittern [1001] Endangered Species or species habitat
known to occur within area
Calidris ferruginea
Curlew Sandpiper [856] Critically Endangered Species or species habitat
may occur within area
Diomedea antipodensis
Antipodean Albatross [64458] Vulnerable Species or species habitat
likely to occur within area
Diomedea epomophora
Southern Royal Albatross [89221] Vulnerable Species or species habitat
likely to occur within area
Diomedea exulans
Wandering Albatross [89223] Vulnerable Species or species habitat
likely to occur within area
Diomedea sanfordi
Northern Royal Albatross [64456] Endangered Species or species habitat
likely to occur within area
Lathamus discolor
Swift Parrot [744] Critically Endangered Species or species habitat
may occur within area
Macronectes giganteus
Southern Giant-Petrel, Southern Giant Petrel Endangered Species or species
Numenius madagascariensis
Eastern Curlew, Far Eastern Curlew [847] Critically Endangered Species or species habitat
may occur within area
Thalassarche bulleri
Buller's Albatross, Pacific Albatross [64460] Vulnerable Species or species habitat
may occur within area
Thalassarche chrysostoma
Grey-headed Albatross [66491] Endangered Species or species habitat
may occur within area
Thalassarche impavida
Campbell Albatross, Campbell Black-browed Albatross Vulnerable Species or species habitat
[64459] likely to occur within area
Thalassarche melanophris
Black-browed Albatross [66472] Vulnerable Species or species habitat
likely to occur within area
Thalassarche salvini
Salvin's Albatross [64463] Vulnerable Species or species habitat
likely to occur within area
Fish
Prototroctes maraena
Australian Grayling [26179] Vulnerable Species or species habitat
known to occur within area
Frogs
Litoria raniformis
Growling Grass Frog, Southern Bell Frog, Green and Vulnerable Species or species habitat
Golden Frog, Warty Swamp Frog [1828] likely to occur within area
Mammals
Dasyurus maculatus maculatus (Tasmanian population)
Spotted-tail Quoll, Spot-tailed Quoll, Tiger Quoll Vulnerable Species or species habitat
(Tasmanian population) [75183] known to occur within area
Document Set ID: 3846903
Version: 1, Version Date: 18/07/2018
Name Status Type of Presence
Dasyurus viverrinus
PLANNING EXHIBITED
Eastern Quoll, Luaner [333] DOCUMENTS Endangered Species or species habitat
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018 known to occur within area
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
Perameles gunnii gunnii website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Sarcophilus harrisii
Tasmanian Devil [299] Endangered Species or species habitat
likely to occur within area
Plants
Barbarea australis
Native Wintercress, Riverbed Wintercress [12540] Endangered Species or species habitat
likely to occur within area
Caladenia caudata
Tailed Spider-orchid [17067] Vulnerable Species or species habitat
likely to occur within area
Dianella amoena
Matted Flax-lily [64886] Endangered Species or species habitat
known to occur within area
Epacris exserta
South Esk Heath [19879] Endangered Species or species habitat
known to occur within area
Glycine latrobeana
Clover Glycine, Purple Clover [13910] Vulnerable Species or species habitat
may occur within area
Lepidium hyssopifolium
Basalt Pepper-cress, Peppercress, Rubble Pepper- Endangered Species or species habitat
cress, Pepperweed [16542] may occur within area
Pterostylis commutata
Midland Greenhood [64535] Critically Endangered Species or species habitat
may occur within area
Reptiles
Chelonia mydas
Green Turtle [1765] Vulnerable Foraging, feeding or related
behaviour likely to occur
within area
Diomedea epomophora
Southern Royal Albatross [89221] Vulnerable Species or species habitat
likely to occur within area
Diomedea exulans
Wandering Albatross [89223] Vulnerable Species or species habitat
likely to occur within area
Macronectes giganteus
Southern Giant-Petrel, Southern Giant Petrel [1060] Endangered Species or species habitat
likely to occur within area
Macronectes halli
Northern Giant Petrel [1061] Vulnerable Species or species habitat
may occur within area
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Thalassarche chrysostoma
Grey-headed Albatross [66491] Endangered Species or species habitat
may occur within area
Thalassarche melanophris
Black-browed Albatross [66472] Vulnerable Species or species habitat
likely to occur within area
Myiagra cyanoleuca
Satin Flycatcher [612] Species or species habitat
known to occur within area
Calidris acuminata
Sharp-tailed Sandpiper [874] Species or species habitat
known to occur within area
Calidris ferruginea
Curlew Sandpiper [856] Critically Endangered Species or species habitat
may occur within area
Calidris melanotos
Pectoral Sandpiper [858] Species or species habitat
may occur within area
Gallinago hardwickii
Latham's Snipe, Japanese Snipe [863] Species or species habitat
may occur within area
Limosa lapponica
Bar-tailed Godwit [844] Species or species habitat
likely to occur within area
Numenius madagascariensis
Eastern Curlew, Far Eastern Curlew [847] Critically Endangered Species or species habitat
may occur within area
Tringa nebularia
Common Greenshank, Greenshank [832] Species or species habitat
may occur within area
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
Apus pacificus
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Ardea alba
Great Egret, White Egret [59541] Species or species habitat
likely to occur within area
Ardea ibis
Cattle Egret [59542] Species or species habitat
may occur within area
Calidris acuminata
Sharp-tailed Sandpiper [874] Species or species habitat
known to occur within area
Calidris ferruginea
Curlew Sandpiper [856] Critically Endangered Species or species habitat
may occur within area
Calidris melanotos
Pectoral Sandpiper [858] Species or species habitat
may occur within area
Diomedea antipodensis
Antipodean Albatross [64458] Vulnerable Species or species habitat
likely to occur within area
Diomedea epomophora
Southern Royal Albatross [89221] Vulnerable Species or species habitat
likely to occur within area
Diomedea exulans
Wandering Albatross [89223] Vulnerable Species or species habitat
likely to occur within area
Diomedea gibsoni
Gibson's Albatross [64466] Vulnerable* Species or species habitat
likely to occur within area
Diomedea sanfordi
Northern Royal Albatross [64456] Endangered Species or species habitat
likely to occur within area
Gallinago hardwickii
Latham's Snipe, Japanese Snipe [863] Species or species habitat
may occur within area
Haliaeetus leucogaster
White-bellied Sea-Eagle [943] Species or species habitat
known to occur within area
Hirundapus caudacutus
White-throated Needletail [682] Species or species habitat
known to occur within area
Lathamus discolor
Swift Parrot [744] Critically Endangered Species or species habitat
may occur within
Macronectes giganteus
Southern Giant-Petrel, Southern Giant Petrel [1060] Endangered Species or species habitat
likely to occur within area
Macronectes halli
Northern Giant Petrel [1061] Vulnerable Species or species habitat
may occur within area
Myiagra cyanoleuca
Satin Flycatcher [612] Species or species habitat
known to occur within area
Numenius madagascariensis
Eastern Curlew, Far Eastern Curlew [847] Critically Endangered Species or species habitat
may occur within area
Pachyptila turtur
Fairy Prion [1066] Species or species habitat
likely to occur within area
Thalassarche bulleri
Buller's Albatross, Pacific Albatross [64460] Vulnerable Species or species habitat
may occur within area
Thalassarche cauta
Tasmanian Shy Albatross [89224] Vulnerable* Species or species habitat
likely to occur within area
Thalassarche chrysostoma
Grey-headed Albatross [66491] Endangered Species or species habitat
may occur within area
Thalassarche impavida
Campbell Albatross, Campbell Black-browed Albatross Vulnerable Species or species habitat
[64459] likely to occur within area
Thalassarche melanophris
Black-browed Albatross [66472] Vulnerable Species or species habitat
likely to occur within area
Thalassarche salvini
Salvin's Albatross [64463] Vulnerable Species or species habitat
likely to occur within area
Thalassarche steadi
White-capped Albatross [64462] Vulnerable* Species or species habitat
likely to occur within area
Tringa nebularia
Common Greenshank, Greenshank [832] Species or species habitat
may occur within area
Reptiles
Chelonia mydas
Green Turtle [1765] Vulnerable Foraging, feeding or related
behaviour likely to occur
within area
Extra Information
State and Territory Reserves [ Resource Information ]
Name State
Tamar TAS
Anas platyrhynchos
Mallard [974] Species or species habitat
likely to occur within area
Carduelis carduelis
European Goldfinch [403] Species or species habitat
likely to occur within area
Carduelis chloris
European Greenfinch [404] Species or species habitat
likely to occur within area
Columba livia
Rock Pigeon, Rock Dove, Domestic Pigeon [803] Species or species habitat
likely to occur within area
Passer domesticus
House Sparrow [405] Species or species habitat
likely to occur within area
Streptopelia chinensis
Spotted Turtle-Dove [780] Species or species habitat
likely to occur within area
Sturnus vulgaris
Common Starling [389] Species or species habitat
likely to occur within area
Turdus merula
Common Blackbird, Eurasian Blackbird [596] Species or species habitat
likely to occur
Document Set ID: 3846903
Version: 1, Version Date: 18/07/2018
Name Status Type of Presence
within area
Mammals
Bos taurus
Domestic Cattle [16] Species or species habitat
PLANNING EXHIBITED
likely to occur within area
DOCUMENTS
DA 0656/2017
Canis lupus familiaris
Ref. No:
Date
advertised: 25/07/2018
Capra hircus
Goat [2] Species or species habitat
likely to occur within area
Felis catus
Cat, House Cat, Domestic Cat [19] Species or species habitat
likely to occur within area
Feral deer
Feral deer species in Australia [85733] Species or species habitat
likely to occur within area
Lepus capensis
Brown Hare [127] Species or species habitat
likely to occur within area
Mus musculus
House Mouse [120] Species or species habitat
likely to occur within area
Oryctolagus cuniculus
Rabbit, European Rabbit [128] Species or species habitat
likely to occur within area
Rattus norvegicus
Brown Rat, Norway Rat [83] Species or species habitat
likely to occur within area
Rattus rattus
Black Rat, Ship Rat [84] Species or species habitat
likely to occur within area
Plants
Anredera cordifolia
Madeira Vine, Jalap, Lamb's-tail, Mignonette Vine, Species or species habitat
Anredera, Gulf Madeiravine, Heartleaf Madeiravine, likely to occur within area
Potato Vine [2643]
Asparagus asparagoides
Bridal Creeper, Bridal Veil Creeper, Smilax, Florist's Species or species habitat
Smilax, Smilax Asparagus [22473] likely to occur within area
Cytisus scoparius
Broom, English Broom, Scotch Broom, Common Species or species habitat
Broom, Scottish Broom, Spanish Broom [5934] likely to occur within area
Genista monspessulana
Montpellier Broom, Cape Broom, Canary Broom, Species or species habitat
Common Broom, French Broom, Soft Broom [20126] likely to occur within area
Ulex europaeus
Gorse, Furze [7693] Species or species
Document Set ID: 3846903
Version: 1, Version Date: 18/07/2018
Name Status Type of Presence
habitat likely to occur within
area
PLANNING EXHIBITED
DOCUMENTS
Ref. No: DA 0656/2017
Date
advertised: 25/07/2018
Planning Administration
This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
Caveat
Ref. No:
Date
advertised: 25/07/2018
Planning Administration
The information presented in this report has been provided by a range of data sources as acknowledged at the end of the report. This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
This report is designed to assist in identifying the locations of places which may be relevant in determining obligations under the Environment
Protection and Biodiversity Conservation Act 1999. It holds mapped locations of World and National Heritage properties, Wetlands of International
and National Importance, Commonwealth and State/Territory reserves, listed threatened, migratory and marine species and listed threatened
ecological communities. Mapping of Commonwealth land is not complete at this stage. Maps have been collated from a range of sources at various
resolutions.
Not all species listed under the EPBC Act have been mapped (see below) and therefore a report is a general guide only. Where available data
supports mapping, the type of presence that can be determined from the data is indicated in general terms. People using this information in making
a referral may need to consider the qualifications below and may need to seek and consider other information sources.
For threatened ecological communities where the distribution is well known, maps are derived from recovery plans, State vegetation maps, remote
sensing imagery and other sources. Where threatened ecological community distributions are less well known, existing vegetation maps and point
location data are used to produce indicative distribution maps.
Threatened, migratory and marine species distributions have been derived through a variety of methods. Where distributions are well known and if
time permits, maps are derived using either thematic spatial data (i.e. vegetation, soils, geology, elevation, aspect, terrain, etc) together with point
locations and described habitat; or environmental modelling (MAXENT or BIOCLIM habitat modelling) using point locations and environmental data
layers.
Where very little information is available for species or large number of maps are required in a short time-frame, maps are derived either from 0.04
or 0.02 decimal degree cells; by an automated process using polygon capture techniques (static two kilometre grid cells, alpha-hull and convex hull);
or captured manually or by using topographic features (national park boundaries, islands, etc). In the early stages of the distribution mapping
process (1999-early 2000s) distributions were defined by degree blocks, 100K or 250K map sheets to rapidly create distribution maps. More reliable
distribution mapping methods are used to update these distributions as time permits.
Only selected species covered by the following provisions of the EPBC Act have been mapped:
- migratory and
- marine
The following species and ecological communities have not been mapped and do not appear in reports produced from this database:
Coordinates
-41.41977 147.12547
Planning Administration
25/07/2018
-Department of Environment, Water and Natural Resources, South Australia document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.
The Department is extremely grateful to the many organisations and individuals who provided expert advice
and information on numerous draft distributions.
© Commonwealth of Australia
Department of the Environment
GPO Box 787
Canberra ACT 2601 Australia
+61 2 6274 1111
0498 844 347 This document is subject to copyright and is protected by law. In displaying this
document on its website the Council grants website users a non-exclusive licence to
reproduce the document in their web browser for the sole purpose of viewing the
content. The Council reserves all other rights. Documents displayed on the Council's
website are intended for public perusal only and should not be reproduced
without the consent of the copyright owner.