You are on page 1of 1

DRAWING NO.

REVISION CLIENT: PROJECT: CLIENT REF: PROJECTION 3RD

SHEET 1 OF 1
A - - - CAD

ALL DIMENSIONS IN mm UNLESS OTHERWISE STATED

TITLE

RBV Energy Ltd.


This design document is a
confidential document provided CHECK VALVE, 2" FIG 1502, M X F UNION ENDS, TOP
exclusively for the information to the
Centurion House customer identified hereon. It is not
New York Way
New York Industrial Estate
Newcastle Upon Tyne
to be copied, used or its contents
divulged in any form without prior ENTRY, FLAPPER TYPE 10K PSI, H2S SERVICE
written consent of RBV Energy Ltd.
NE27 0QF RBV Energy Ltd may seek relief by
United Kingdom
Tel: +44 (0)191 257 4058
way of injunction or monetary
compensation against unauthorised
Designed Checked Approved Date JOB No. - Sheet Revision
Fax: +44 (0)191 296 6097 copying, disclosure or use of this
www.rbvenergy.com information, including the fabrication DRG No.
and use of products derived
therefrom.
A ISSUED FOR INFORMATION JM SY CH 23/02/2018 JM SY CH 23/02/2018 1/1 A
REV DESCRIPTION DRN CKD APP DATE

You might also like