2014

Vodafone Qatar Tornado Project

ALU RF team
Alcatel-Lucent
Date 24/5/2014
Site 1014
Sites Health Report

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 2/17
Table of Contents

1 INTRODUCTION ..................................................................................................................................... 4
2 SERVING CELL ID .................................................................................................................................. 7
3 DL RSSI PLOT & STATISTICS .............................................................................................................. 8
4 DL RSRP PLOT & STATISTICS ............................................................................................................. 9
5 DL RSRQ PLOT & STATISTICS .......................................................................................................... 10
6 DL SNR PLOT & STATISTICS ............................................................................................................. 11
7 DL THROUGHPUT PLOT & STATISTICS .......................................................................................... 12

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 3/17
1 INTRODUCTION
This report is presenting the drive test results for site 1014 in order to check the field
KPIs and verify the site physical parameters and deployment conditions.

Site 1014 on map

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 4/17
Site Physical Parameters are as below:

Site
Site ID Site 1014
Address Doha
Latitude 25.33539
Longitude 51.50065
Integrated
Integration Status:

Alarm Status (from integrated sites): Clear


Cell Availability (from integrated sites): available
Bandwidth 10 MHz
DL/UL Frequency 1875/1780
Test Duration: 3 Hrs
Sectors

Alpha Beta Gamma

Cell Name/ID Sit1014_1 Sit1014_2 Sit1014_3


PCI 257 255 256

Antenna Height 18.5 18.5 18.5

Electrical tilt* 4 2 5

Mechanical Tilt 1 1 1

Azimuth* 60 180 300

Conditions of the Network for the Drive test:


 Sites sectors Online
 MIMO Closed Loop Enabled all over the sectors of the NW
 Re-use 1 used for the 4 sites
 BW 10 MHZ used
 RSSI is the measured DL Power all over the RB’s in the 10MHZ channel
 SNR Signal to Noise Ratio in DL
 PCI is the Physical Cell ID of the serving Sector
 The plots will be included with the indicated legend.

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 5/17
Summary of Call test procedure Status:

ID Category Sub-Category Sector A Sector B Sector C


1 Average RSRP -77.69 -79.53 -79.74
2 Coverage Average SINR 18.67 18.31 14.74
3 Average CQI 11.34 11.10 10.22
Attach procedure
4 Pass Pass Pass
(5 Attempts)
RRC Setup Procedure
5 Pass Pass Pass
(5 Attempts)
Accessibility
Average Call setup time
6 6.996 Sec 8.142 Sec 5.308 Sec
(CSFallBack)
Average Session setup
7 0.093 Sec 0.106 Sec 0.016 Sec
time (CSFallBack)
Round Trip Time @32
8 byte Peak Stationary 35 ms / 0 % 27 ms / 0 % 26 ms / 0 %
(20 Pings)
Physical Layer
31.8 / 19.6 22.5 / 17.2 22.7 / 19.6
9 Throughput UL Peak
Mbps Mbps Mbps
Stationary
Physical Layer
61.6 / 61.2 60.5 / 55.1 65.8 / 55.2
10 Throughput DL Peak
Mbps Mbps Mbps
Integrity Stationary
Average DL Throughput 61.44 / 27.02 59.93 / 32.69 58.45 / 29.67
11
per cell drive Mbps Mbps Mbps
Average Cell Edge 29.70 / 22.21 14.16 / 7.49 30.59 / 25.45
12
Throughput DL Mbps Mbps Mbps
Average Cell Edge 5.07 / 4.05 9.16 / 7.49 6.52 / 5.64
13
Throughput UL Mbps Mbps Mbps
14 Handover Latency 56 ms
15 Intra Site HO Pass Pass Pass
16 Mobility Inter Site HO Pass Pass Pass
17 Inter RAT PS HO Pass Pass Pass
18 Retainability RRC Drop Pass Pass Pass
19 PCIDs Pass Pass Pass
Serving Cell PCI (Cross
20 Physical
Pass Pass Pass
Sector Check)
Physical Design
21 Pass Pass Pass
Parameters
HTTP/Browsing –
22 Pass Pass Pass
Smart Phone
Services
UDP/Streaming – USB
23 Pass Pass Pass
Modem
CSFB (CONNECTED)
24 Pass Pass Pass
MO – Smart Phone
CSFB (CONNECTED) MT
25 Pass Pass Pass
– Smart Phone
CSFB
CSFB (IDLE) MO –
26 Pass Pass Pass
Smart Phone
CSFB (IDLE) MT –
27 Pass Pass Pass
Smart Phone

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 6/17
2 SERVING CELL ID
- Site 1014 drive test

Serving Cell ID plot from the DT

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 7/17
3 DL RSSI PLOT & STATISTICS
- Site 1014 drive test

DL RSSI plot for the paths covered in DT

Statistics for the RSSI Field values:

Tabled Graph for the RSSI intervals vs. #of Samples#

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 8/17
4 DL RSRP PLOT & STATISTICS
- Site 1014 drive test

DL RSRP plot for the paths covered in DT

Statistics for the RSRP Field values:

Tabled Graph for the RSRP intervals vs. #of Samples

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 9/17
5 DL RSRQ PLOT & STATISTICS
- Site 1014 drive test

DL RSRQ plot for the paths covered in DT

Statistics for the RSRQ Field values:

Tabled Graph for the RSRQ intervals vs. #of Samples

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 10/17
6 DL SNR PLOT & STATISTICS
- Site 1014 drive test

DL SNR plot for the paths covered in DT

Statistics for the SNR Field values:

Tabled Graph for the SNR intervals vs. #of Samples

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 11/17
7 DL THROUGHPUT PLOT & STATISTICS
- Site 1014 drive test

DL Throughput plot for the paths covered in DT

Statistics for the DL Throughput Field values:

Tabled Graph for the DL Throughput intervals vs. #of Sample

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 12/17
8 UL THROUGHPUT PLOT & STATISTICS
- Site 1014 drive test

UL Throughput plot for the paths covered in DT

Statistics for the UL Throughput Field values:

Tabled Graph for the UL Throughput intervals vs. #of Sample

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 13/17
9 STATIC TEST SNAPSHOTS:

Sec 1 – Dl

Sec 1 – Ul

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 14/17
Sec 2 – Dl

Sec 2 – Ul

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 15/17
Sec 3 – Dl

Sec 3 - Ul

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 16/17
END OF THE DOCUMENT

ED 01

ALU VFQ Tornado Project – ALU RF 26 May 2014 Site 1014 Sites Health Report 17/17