5-7700-0020
COORDINATION AND
Rev. No. 4
COMMUNICATION Page 1 of 1
________________________________________________________________________________________________________
PROCEDURE
FOR PROJECT CORDINATION
AND COMMUNICATION
Abbreviations
______________________________________________________________________________________________________
Template No. 5-0000-0001-T2 Rev.1 Copyrights EIL – All rights reserved
PROCEDURE FOR PROJECT Document No.
COORDINATION AND 5-7700-0020
COMMUNICATION Rev. No. 4
Page 3 of 12
________________________________________________________________________________________________________
CONTENTS
1.0 PURPOSE 4
2.0 SCOPE 4
3.0 REFERENCE 4
4.0 DEFINITIONS 4
ATTACHMENTS
______________________________________________________________________________________________________
Template No. 5-0000-0001-T2 Rev.1 Copyrights EIL – All rights reserved
PROCEDURE FOR PROJECT Document No.
COORDINATION AND 5-7700-0020
COMMUNICATION Rev. No. 4
Page 4 of 12
________________________________________________________________________________________________________
4. Document Transmittal (external) – 5-7700-0020 F3 Rev.1
1.0 PURPOSE
1.1 This procedure has been prepared for defining systematic and
orderly administrative relationship among the related parties for the
EIL Project (hereinafter referred to as the Project)
2.0 SCOPE
3.0 REFERENCE
4.0 DEFINITIONS
4.3 Project means the facilities which are the subject matter of Contract
and includes Process Units, Utility, Off-site Facilities, Plant and Non
Plant Building, Infrastructure Facilities and Interconnections.
4.6 “Process Units” means and includes Licensed Units and Non-Licensed Units
(Open Art Units).
4.7 “Licensed Unit” means units designed by Process Licensor other than EIL
and/or as listed in Project Definition.
4.8 Open Art Units mean units designed by EIL and/or as listed in Project
Definition.
4.9 “Utility & Offsite facilities” mean the generation and / or distribution, storage
and handling of supporting facilities required to operate various process
units and/or offsite units/general facilities as listed in Project Definition.
General supporting facilities are mainly workshop, godowns, lab, canteen,
administrative building, plant building and control room etc. that form part of
Project Complex and as listed in the Project Definition.
4.10 Project Manager means designated officer from EIL in charge for
coordination, management and implementation of the Project.
4.12 “Sub Supplier” or Sub Vendor” means any person(s), firm(s) from whom
equipment/materials are purchased by Vendor. Contractually,
supplier/vendor shall be fully responsible for work/supply/ actions of the sub
supplier.
______________________________________________________________________________________________________
Template No. 5-0000-0001-T2 Rev.1 Copyrights EIL – All rights reserved
PROCEDURE FOR PROJECT Document No.
COORDINATION AND 5-7700-0020
COMMUNICATION Rev. No. 4
Page 6 of 12
________________________________________________________________________________________________________
4.15 “Sub Contractor” shall mean any organization/individual who provides
construction/fabrication/storage/erection services for
Contractor/Agency/EPCC.
4.16 “EIL Scope of Work” or “EIL Scope of Services” mean services and
deliverables to be provided by EIL for project as defined in the contract.
4.19 “Mechanical Completion” means, that the project or the said Units, Facilities
or any part thereof, has been erected in accordance with the applicable
drawings and specifications and has been mechanically and structurally
completed as set forth in the provisions of CONTRACT.
4.23 “Project Schedule” means period within which EIL shall complete all
activities defined in EIL scope of services as per provisions of
contract.
5.1.1 Customer
______________________________________________________________________________________________________
Template No. 5-0000-0001-T2 Rev.1 Copyrights EIL – All rights reserved
PROCEDURE FOR PROJECT Document No.
COORDINATION AND 5-7700-0020
COMMUNICATION Rev. No. 4
Page 7 of 12
________________________________________________________________________________________________________
Representative’s Name & : ____________________
Designation
E-mail : ____________________
2) Administrative office :
Address (if any) ____________________
E-mail : ____________________
E-mail : ____________________
______________________________________________________________________________________________________
Template No. 5-0000-0001-T2 Rev.1 Copyrights EIL – All rights reserved
PROCEDURE FOR PROJECT Document No.
COORDINATION AND 5-7700-0020
COMMUNICATION Rev. No. 4
Page 8 of 12
________________________________________________________________________________________________________
Name : __________________________
Address :___________________________
E Mail : ______________________
5.1.3 Licensor
E-Mail : _____________________
E-Mail : _____________________
E-Mail : _____________________
______________________________________________________________________________________________________
Template No. 5-0000-0001-T2 Rev.1 Copyrights EIL – All rights reserved
PROCEDURE FOR PROJECT Document No.
COORDINATION AND 5-7700-0020
COMMUNICATION Rev. No. 4
Page 9 of 12
________________________________________________________________________________________________________
Letters/Faxes/E-mail to Licensors
Transmittals to Customer/Vendor/Contractor/
EPCC Contractor/Site/internal
Technical Memorandum
Inter-Office Memorandum
ii) Project Manager is the sole point of contact with Customer as well
as other parties for all activities of the Project. Therefore, all
correspondence between EIL and Customer/other parties shall be
directly done with/by Project Manager or by his authorized
representative. With parties namely vendors and contractors, the
correspondence is done by others under intimation to Project
Manager. However, depending upon the exigencies of the
situation, Project Manager can directly correspond with these
outside parties.
vi) Each message shall preferably deal with one subject and the
subject matter shall be described in brief.
______________________________________________________________________________________________________
Template No. 5-0000-0001-T2 Rev.1 Copyrights EIL – All rights reserved
PROCEDURE FOR PROJECT Document No.
COORDINATION AND 5-7700-0020
COMMUNICATION Rev. No. 4
Page 11 of 12
________________________________________________________________________________________________________
5.5 DELIVERABLES
______________________________________________________________________________________________________
Template No. 5-0000-0001-T2 Rev.1 Copyrights EIL – All rights reserved
PROCEDURE FOR PROJECT Document No.
COORDINATION AND 5-7700-0020
COMMUNICATION Rev. No. 4
Page 12 of 12
________________________________________________________________________________________________________
The “List of Deliverables” shall be as discussed and agreed with
Customer broadly based on the document as per Annexure-A
attached.