You are on page 1of 1

Empty (Bare) means Weight of Assembled

Deaerator (includes both storage tank & dome


+ their internals) which comes out from M/s.
This condition Grand Prix Shop
includes
Platforms 11000
+Ladder+
Operating 37716 4440 8555
Liquid +
Insulation 46000 3540 6229
1770 3195
This condition
includes Higher of Shop & Field Hydro
Platforms 5000 TL TO TL
+Ladder+
filled full of XYZ To Derive Seismic Shear &
water Moment During Empty
Save As Operating Condition
in PVElite model & delete
operating liquid & Run the

2400
calculation. Report Values
accordingly.
1714

1714
(NOTE-6) (NOTE-6)

3200 900

M24 BOLT (NOTE-2)


DIA.

20
125
160 160 1806 6
1730
1730
1806
1660

M24 BOLT DIA.


(NOTE-2)

20
125

30 250 30 250

(1) ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED.


(2) SETTING BOLTS WITH WASHERS AND NUTS ARE IN EQUIPMENT SUPPLIER'S SCOPE OF SUPPLY.
(3) SETTING BOLT MATERIAL: ASTM A325N TYPE 1 (AS PER JOB SPECIFICATION FOR STRUCTURAL STEEL MATERIALS, SUPPLY
FABRICATION AND ERECTION Doc. No. 067401-0000-JSS-1800-001).
(4) OPERATING TEMPERATURE: 110°C.
(5) VERTICAL SEISMIC SHALL BE CONSIDERED AS PER ASCE 7-05.
(6) ELE. OF TOP OF CIVIL STRUCTURAL BEAM AT FIXED SADDLE = ELE. OF TOP OF CIVIL STRUCTURAL BEAM AT SLIDING SADDLE

01 FIRST ISSUE XYZ XYZ XYZ XX-XXX-XXXX


DEAERATOR

804-V-01

IL-6929 FRBD-MES-DL-D2-067 01

You might also like