The utility electricity sector in India has one National Grid with an installed capacity of 330.86 GW as on 31 December 2017.[4] Renewable
India: Electricity sector
power plants constituted 31.7% of total installed capacity. During the fiscal year 2016-17, the gross electricity generated by utilities in India was
1,236.39 TWh and the total electricity generation (utilities and non utilities) in the country was 1,433.4 TWh.[3][5] The gross electricity Data
consumption was 1,122 kWh per capita in the year 2016-17.[3] India is the world's third largest producer and fourth largest consumer of Electricity 81% (2013)[1]
electricity.[6][7] Electric energy consumption in agriculture was recorded highest (17.89%) in 2015-16 among all countries.[3] The per capita coverage
electricity consumptionis low compared to many countries despite cheaperelectricity tariff in India.[8] Installed 330.86 GW
India has surplus power generation capacity but lacks adequate infrastructure for supplying electricity to all needy people. In order to address the
capacity
lack of adequate electricity supply to all the people in the country by March 2019, the Government of India launched a scheme called "Power for Share of fossil 66.2%
All".[9] This scheme will ensure continuous and uninterrupted electricity supply to all households, industries and commercial establishments by energy
creating and improving necessary infrastructure. Its a joint collaboration of the Government of India with states to share funding and create Share of 31.8%
overall economic growth.[10][11] renewable
energy
India's electricity sector is dominated by fossil fuels, and in particular coal, which in 2016 produced about two thirds of all electricity. However,
the government is pushing for an increased investment in renewable energy. The Draft National Electricity Plan of 2016 prepared by the GHG emissions 2066.01
Government of India states that the country does not need additional non-renewable power plants in the utility sector until 2027, with the from electricity MtCO2[2]
commissioning of 50,025 MW coal-based power plants under construction and achieving 275,000 MW total installed renewable power generation (2015)
capacity.[12][13] Average 1,122 kWh per
electricity capita
use (2016-17)
Transmission & 21.81%
Contents Distribution
History
losses (2015-16)

Installed capacity Residential 24.32%[3]


Utility power consumption
Captive power (% of total, 2016-
Installed capacity by state or territory 17)
Demand Industrial 40.01%[3]
Rural electrification
consumption
Per-Capita consumption
(% of total, 2016-
Electricity generation
17)
Thermal power
Pollution from thermal power plants
Agriculture 18.33%[3]
Coal supply constraints consumption
Natural gas supply constraints (% of total, 2016-
Replacement of old thermal power plants 17)
Renewable energy Commercial 9.22%[3]
Hydro power consumption
Solar power (% of total, 2016-
Wind power
17)
Biomass power
Geothermal energy Traction 1.61%[3]
Tidal power consumption
Nuclear power (% of total, 2016-
17)
Electricity transmission and distribution
Regulation and administration Services
Trading Share of private 44% (October
Government-owned power companies sector in 2017)
Funding of power infrastructure
generation
Borrowing by state owned discoms
Budgetary support Institutions
Human resource development Responsibility Ministry of
Problems with India's power sector for policy-setting Power
Foreign electricity trade Responsibility Ministry of New
Electricity as substitute to imported LPG and kerosene for renewable and Renewable
Electric vehicle energy Energy
Energy reserves Responsibility Ministry of
See also for the Environment,
References environment Forest and
External links Climate Change
Electricity sector Electricity Act,
law 2003
History
The first demonstration of an electric light in Calcutta (now Kolkata) was conducted on 24 July 1879 by P.W. Fleury & Co. On 7 January 1897, Kilburn & Co secured the Calcutta electric
lighting license as agents of the Indian Electric Co, which was registered in London on 15 January 1897. A month later, the company was renamed the Calcutta Electric Supply Corporation. The
control of the company was transferred from London to Calcutta only in 1970. Enthused by the success of electricity in Calcutta, power was thereafter introduced in Bombay (now Mumbai).[14]
Mumbai saw electric lighting demonstration for the first time in 1882 at Crawford Market and the Bombay Electric Supply & Tramways
Electricity generation by source in India
.[15]
Company (BEST) set up a generating station in 1905 to provide electricity for the tramway
in FY 2016-17
The first hydroelectric installation in India was installed near a tea estate at Sidrapong for the Darjeeling Municipality in 1897.[16] The
first electric street light in Asia was lit on 5 August 1905 in Bangalore.[17] The first electric train in the country ran on the Harbour Line
between Bombay's Victoria Terminus and Kurla on 3 February 1925.[18] On 18 August 2015, Cochin International Airport became the
world's first fully solar powered airport with the inauguration of a dedicatedsolar plant.[19][20]

India began utilizing grid management on a regional basis in the 1960s. Individual State grids were interconnected to form 5 regional
grids covering mainland India. The grids were the Northern, Eastern, Western, North Eastern and Southern Grids. These regional links
were established to enable transmission of surplus electricity between States in each region. In the 1990s, the Indian government began
planning for a national grid. Regional grids were initially interconnected by asynchronous HVDC back-to-back links facilitating limited
[21]
exchange of regulated power. The links were subsequently upgraded to high capacity synchronous links.

The first interconnection of regional grids was established in October 1991 when the North Eastern and Eastern grids were
interconnected. The Western Grid was interconnected with the aforementioned grids in March 2003. The Northern grid was also
interconnected in August 2006, forming a Central Grid synchronously connected operating at one frequency.[21] The sole remaining
regional grid, the Southern Grid, was synchronously interconnected to the Central Grid on 31 December 2013 with the commissioning Coal: 944,861 GWh (76.5%)
of the 765 kV Raichur-Solapur transmission line, thereby establishing the National Grid.[21][22] Large Hydro: 122,313 GWh (9.9%)
Small Hydro: 7,673 GWh (0.6%)
By the end of calendar year 2015, despite poor hydro electricity generation, India had become a power surplus nation with huge electric Wind Power: 46,011 GWh (3.7%)
[13][23][24] The calendar year 2016 started with steep fall in the international
power generation capacity idling for want of power demand. Solar Power: 12,086 GWh (1.0%)
price of energy commodities such as coal, diesel oil, naphtha, bunker fuel and LNG which are used in electricity generation in Biomass: 14,159 GWh (1.1%)
India.[25][26][27][28][29] Earlier many of the power stations which are using fuels other than coal are unable to operate due to high cost of Nuclear: 37,916 GWh (3.1%)
LNG and petro products. This situation has changed due to glut in petroleum products globally. The prices are falling to such an extent Gas: 49,094 GWh (4.0%)
that these fuels have become cheaper to give competition for pit head coal based power generators. Many of the stranded gas and liquid Diesel: 275 GWh (0.0%)
fuel based power stations would be competing with indigenous coal based power stations in an electricity market where demand growth
is not encouraging.[30] All the segments of the electricity sector such as fuel suppliers, fuel transporters (railways, harbours, pipelines,
etc.), electricity generators, electricity transmission companies and distribution companies would be facing severe competition to cut Installed capacity by source in India as
down the prices and improve their operating efficiency in a final consumer dictated market.[31] Due to tepid growth in electricity on 31 December 2017[4]
[32][33]
consumption, coal stocks are continuously building up at power stations as well as coal mines.

On March 29, 2017 the Central Electricity Authority stated that for the first time India has become net exporter of electricity. India
exported 5,798 GWh to neighbouring countries, against a total import of 5,585 GWh.

Installed capacity
The total installed power generation capacity is sum of utility capacity
, captive power capacity and other non-utilities

Utility power

Coal: 192,971.5 MW (58.3%)


Large Hydro: 44,963.42 MW
(13.6%)
Small Hydro: 4,389.55 MW (1.3%)
Wind Power: 32,700.64 MW (9.9%)
Solar Power: 14,771.69 MW (4.5%)
Biomass: 8,295.78 MW (2.5%)
Nuclear: 6,780 MW (2.0%)
Gas: 25,150.38 MW (7.6%)
Diesel: 837.63 MW (0.3%)
Growth of Installed Capacity in India[3]
Thermal (MW) Renewable (MW)
Installed Capacity Nuclear % Growth
Sub-Total Other Sub-Total Total (MW)
as on Coal Gas Diesel (MW) Hydro (on yearly basis)
Thermal Renewable Renewable
31-Dec-1947 756 - 98 854 - 508 - 508 1,362 -
31-Dec-1950 1,004 - 149 1,153 - 560 - 560 1,713 8.59%
31-Mar-1956 1,597 - 228 1,825 - 1,061 - 1,061 2,886 13.04%
31-Mar-1961 2,436 - 300 2,736 - 1,917 - 1,917 4,653 12.25%
31-Mar-1966 4,417 137 352 4,903 - 4,124 - 4,124 9,027 18.80%
31-Mar-1974 8,652 165 241 9,058 640 6,966 - 6,966 16,664 10.58%
31-Mar-1979 14,875 168 164 15,207 640 10,833 - 10,833 26,680 12.02%
31-Mar-1985 26,311 542 177 27,030 1,095 14,460 - 14,460 42,585 9.94%
31-Mar-1990 41,236 2,343 165 43,764 1,565 18,307 - 18,307 63,636 9.89%
31-Mar-1997 54,154 6,562 294 61,010 2,225 21,658 902 22,560 85,795 4.94%
31-Mar-2002 62,131 11,163 1,135 74,429 2,720 26,269 1,628 27,897 105,046 4.49%
31-Mar-2007 71,121 13,692 1,202 86,015 3,900 34,654 7,760 42,414 132,329 5.19%
31-Mar-2012 112,022 18,381 1,200 131,603 4,780 38,990 24,503 63,493 199,877 9.00%

31 Mar 2017[34] 192,163 25,329 838 218,330 6,780 44,478 57,260 108,518 326,841 10.31%

The total installed capacity is after deducting the retired capacity (if any) which are very old and obsolete. As of 31 March 2017 (i.e. end of 12th five-year plan), the achieved thermal power
generation capacity addition excluding renewable power is 91,730 MW against the target of 161,403 MW during the 12th five-year plan.[35] Nearly 70,000 MW is in various stages of
construction as on 31 March 2017.

.[36]
The total installed utility power generation capacity as on 30 April 2017 with sector wise & type wise break up is as given below

Thermal (MW) Renewable (MW)


Nuclear
Sector Sub-Total Other Total (MW) %
Coal Gas Diesel (MW) Hydro
Thermal Renewable
Central 55,245.00 7,490.83 0.00 62,735.83 6,780.00 11,651.42 0.00 81,167.25 25
State 65,145.50 7,257.95 363.93 72,767.38 0.00 29,703.00 1,963.80 104,447.28 32
Private 74,012.38 10,580.60 473.70 85,066.68 0.00 3,240.00 55,283.33 143,590.01 43
All India 194,402.88 25,329.38 837.63 220,569.88 6,780.00 44,594.42 57,260.23 329,204.53 100

Captive power
The installed captive power generation capacity (above 1 MW capacity) in the industries is 50,289 MW as on 31 March 2017.[3] Another 75,000 MW capacity diesel power generation sets
(excluding sets of size above 1 MW and below 100 kVA) are also installed in the country.[37][38] In addition, there are innumerable DG sets of capacity less than 100 kVA to cater to emergency
[39]
power needs during thepower outages in all sectors such as industrial, commercial, domestic and agriculture.

Captive Power Generation


Source Captive Power Capacity (MW) Share
Coal 29,888 59.43%
Hydroelectricity 54 0.11%
Renewable energy source Included in 'Oil'
Natural Gas 6,061 12.05%
Oil 14,285 28.41%
Total 50,289 100.00%

Installed capacity by state or territory

State-wise All India installed capacity as of July 2015


[40]
State-wise All India installed capacity as of July 2015
(including allocated shares in joint and central sector utilities)

Thermal (in MW) Renewable (in MW)


Nuclear Total
State/Union Territory Sub-Total Other Sub-Total % of Total
Coal Gas Diesel (in MW) Hydro (in MW)
Thermal Renewable Renewable
Maharashtra 24,669.27 3,475.93 - 28,145.20 690.14 3,331.84 6,205.65 9,537.49 38,372.83 13.91%
Gujarat 16,010.27 6,806.09 - 22,816.36 559.32 772.00 4,802.40 5,574.4 28,950.08 10.49%
Madhya Pradesh 11,126.39 257.18 - 11,383.57 273.24 3,223.66 1,670.34 4,894.00 16,550.81 6.00%
Chhattisgarh 13,193.49 - - 13,193.49 47.52 120.00 327.18 447.18 13,688.19 4.96%
Goa 326.17 48.00 - 374.17 25.80 - 0.05 0.05 400.02 0.14%
Dadra & Nagar Haveli 44.37 27.10 - 71.47 8.46 - - - 79.93 0.03%
Daman & Diu 36.71 4.20 - 40.91 7.38 - - - 48.29 0.02%
Central - Unallocated 1,622.35 196.91 - 1,819.26 228.14 - - - 2,047.40 0.74%
Western Region 67,029.01 10,815.41 - 77,844.42 1,840.00 7,447.50 13,005.62 20,453.12 100,137.54 36.29%
Rajasthan 9,400.72 825.03 - 10,225.75 573.00 1,719.30 4,710.50 6,429.8 17,228.55 6.24%
Uttar Pradesh 11,677.95 549.97 - 12,227.92 335.72 2,168.30 989.86 3,158.16 15,721.80 5.70%
Punjab 6,444.88 288.92 - 6,733.80 208.04 3,145.13 503.42 3,648.55 10,590.38 3.84%
Haryana 6,527.53 560.29 - 7,087.82 109.16 1,456.83 138.60 1,595.43 8,792.41 3.19%
Delhi 5,001.87 2,366.01 - 7,367.88 122.08 822.05 34.71 856.76 8,346.72 3.03%
Himachal Pradesh 152.02 61.88 - 213.90 34.08 3,421.51 728.91 4,150.42 4,398.40 1.59%
Uttarakhand 399.50 69.35 - 468.85 22.28 2,441.82 244.32 2,686.14 3,177.27 1.15%
Jammu & Kashmir 329.32 304.14 - 633.46 77.00 1,805.21 156.53 1,961.74 2,672.20 0.97%
Chandigarh 32.54 15.32 - 47.86 8.84 62.32 5.04 67.36 124.06 0.04%
Central - Unallocated 977.19 290.35 - 1,267.54 129.80 754.30 - 754.30 2,151.64 0.78%
Northern Region 40.943.50 5,331.26 12.99 46,274.76 1,620.00 17,796.77 7,511.89 25,308.66 73,203.42 26.53%
Tamil Nadu 10,075.10 1026.30 411.66 11,513.06 986.50 2,182.20 8,423.15 10,605.35 23,104.91 8.37%
Karnataka 6,408.46 - 234.42 6,642.88 475.86 3,599.80 4552.48 8,152.28 15,271.02 5.53%
Andhra Pradesh 5,849.21 1,672.65 16.97 7,538.83 127.16 1,721.99 2,002.65 3,724.64 11,390.64 4.13%
Telangana 5,598.47 1,697.75 19.83 7,316.05 148.62 2012.54 62.75 2,075.29 9,539.96 3.46%
Kerala 1,038.69 533.58 234.60 1,806.87 228.60 1881.50 204.05 2,085.55 4,121.02 1.49%
Puducherry 249.32 32.50 - 281.82 52.78 - 0.03 0.03 334.63 0.12%
Central - NLC 100.17 - - 100.17 - - - - 100.17 0.04%
Central - Unallocated 1,523.08 - - 1,523.08 300.48 - - - 1,823.56 0.66%
Southern Region 30,842.50 4,962.78 917.48 36,722.76 2,320.00 11,398.03 15,245.11 26,643.14 65,685.90 23.81%
West Bengal 8,083.83 100.00 - 8,183.83 - 1,248.30 131.45 1,379.75 9,563.84 3.47%
Odisha 6,753.04 - - 6,753.04 - 2,166.93 116.55 2,283.48 9,036.52 3.28%
DVC 7,160.66 90.00 - 7,250.66 - 193.26 - 193.26 7,443.92 2.70%
Bihar 2,516.24 - - 2,516.24 - 129.43 114.12 243.55 2,759.79 1.00%
Jharkhand 2,404.93 - - 2,404.93 - 200.93 20.05 220.98 2,625.91 0.95%
Sikkim 92.10 - - 92.10 - 174.27 52.11 226.38 318.48 0.12%
Central - Unallocated 1,572.07 - - 1,572.07 - - - - 1,572.07 0.57%
Eastern Region 28,582.87 190.00 - 28,772.87 - 4,113.12 434.54 4,547.66 33,320.53 12.08%
Assam 187.00 718.62 - 905.62 - 429.72 34.11 463.83 1,369.45 0.50%
Tripura 18.70 538.82 - 557.52 - 62.37 21.01 83.38 640.90 0.23%
Meghalaya 17.70 105.14 - 122.84 - 356.58 31.03 387.61 510.45 0.19%
Arunachal Pradesh 12.35 43.06 - 55.41 - 97.57 104.64 202.21 257.62 0.09%
Manipur 15.70 67.98 36.00 119.68 - 80.98 5.45 86.43 206.11 0.07%
Nagaland 10.70 46.35 - 57.05 - 53.32 29.67 82.99 140.04 0.05%
Mizoram 10.35 38.29 - 48.64 - 34.31 36.47 70.78 119.42 0.04%
Central - Unallocated 37.50 104.44 - 141.94 - 127.15 - 127.15 269.09 0.10%
North-Eastern Region 310.00 1,662.70 36.00 2,008.70 - 1,242.00 262.38 1,504.38 3,513.08 1.27%
Andaman & Nicobar - - 40.05 40.05 - - 10.35 10.35 50.40 0.02%
Lakshadweep - - - - - - 0.75 0.75 0.75 0.00%
Islands - - 40.05 40.05 - - 11.10 11.10 51.15 0.02%
Total 167,707.88 22,962.15 993.53 191,663.56 5,780 41,997.42 36,470.64 78,468.06 275,911.62 100.00%

Demand
Demand trends

During the fiscal year 2016-17, the energy availability was 1,135.334 billion KWh with a short fall of requirement by 7.595 billion KWh (-0.7%) against the 1.1% surplus anticipated. The peak
load met was 156,934 MW with a short fall of requirement by 2,608 MW (-1.6%) against the 2.6% surplus anticipated. In LGBR 2017 report, India's Central Electricity Authority anticipated for
the 2017–18 fiscal year, energy surplus and peaking surplus to be 8.8% and 6.8% respectively.[41] Though few states are expected to face energy shortage, power would be made available
adequately from the surplus regions with the higher capacity inter regional transmission links.[42] By the end of calendar year 2015, India has become power surplus country despite lower power
tariffs.[23][24][43][44]

Demand drivers

Of the 1.4 billion people in the world who have no access to electricity, India accounts for over 300 million, some 50 million homes. The International Energy Agency estimates India will add
between 600 GW to 1,200 GW of additional new power generation capacity before 2050.[45] This added new capacity is equivalent to the 740 GW of total power generation capacity of
European Union (EU-27) in 2005. The technologies and fuel sources India adopts, as it adds this electricity generation capacity, may make significant impact to global resource usage and
environmental issues.[46]

Some 500 million Indians (40%) use traditional fuels – fuelwood, agricultural waste and biomass cakes – for cooking and general heating needs.[47] These traditional fuels are burnt in cook
stoves, known as chulah or chulha in some parts of India.[48] Traditional fuel is inefficient source of energy, its burning releases high levels of smoke, PM10 particulate matter, NOX, SOX,
PAHs, polyaromatics, formaldehyde, carbon monoxide and other air pollutants.[49][50][51] Some reports, including one by the World Health Organisation, claim 300,000 to 400,000 people in
India die of indoor air pollution and carbon monoxide poisoning every year because of biomass burning and use of chullahs.[52] Traditional fuel burning in conventional cook stoves releases
unnecessarily large amounts of pollutants, between 5 and 15 times higher than industrial combustion of coal, thereby affecting outdoor air quality, haze and smog, chronic health problems,
damage to forests, ecosystems and global climate. Burning of biomass and firewood will not stop, these reports claim, unless electricity or clean burning fuel and combustion technologies
become reliably available and widely adopted in rural and urban India. The growth of electricity sector in India may help find a sustainable alternative to traditional fuel burning.

In addition to air pollution problems, a 2007 study finds that discharge of untreated sewage is single most important cause for pollution of surface and ground water in India. There is a large gap
between generation and treatment of domestic wastewater in India. The problem is not only that India lacks suf
ficient treatment capacity but also that the sewage treatment plants that exist do not
operate and are not maintained. Majority of the government-owned sewage treatment plants remain closed most of the time in part because of the lack of reliable electricity supply to operate the
plants. The wastewater generated in these areas normally percolates in the soil or evaporates. The uncollected wastes accumulate in the urban areas cause unhygienic conditions, release heavy
metals and pollutants that leaches to surface and groundwater.[53][54] Almost all rivers, lakes and water bodies are severely polluted in India. Water pollution also adversely impacts river,
wetland and ocean life. Reliable generation and supply of electricity is essential for addressing India's water pollution and associated environmental issues.

Other drivers for India's electricity sector are its rapidly growing economy
, rising exports, improving infrastructure and increasing household incomes.

Growth of Electricity Consumption in India[3]

Fiscal year Consumption % of Total Per-Capita Consumption


ending on (GWh) Domestic Commercial Industrial Traction Agriculture Misc (in kWh)

31-Dec-1947 4,182 10.11% 4.26% 70.78% 6.62% 2.99% 5.24% 16.3


31-Dec-1950 5,610 9.36% 5.51% 72.32% 5.49% 2.89% 4.44% 18.2
31-Mar-1956 10,150 9.20% 5.38% 74.03% 3.99% 3.11% 4.29% 30.9
31-Mar-1961 16,804 8.88% 5.05% 74.67% 2.70% 4.96% 3.75% 45.9
31-Mar-1966 30,455 7.73% 5.42% 74.19% 3.47% 6.21% 2.97% 73.9
31-Mar-1974 55,557 8.36% 5.38% 68.02% 2.76% 11.36% 4.13% 126.2
31-Mar-1979 84,005 9.02% 5.15% 64.81% 2.60% 14.32% 4.10% 171.6
31-Mar-1985 124,569 12.45% 5.57% 59.02% 2.31% 16.83% 3.83% 228.7
31-Mar-1990 195,098 15.16% 4.89% 51.45% 2.09% 22.58% 3.83% 329.2
31-Mar-1997 315,294 17.53% 5.56% 44.17% 2.09% 26.65% 4.01% 464.6
31-Mar-2002 374,670 21.27% 6.44% 42.57% 2.16% 21.80% 5.75% 671.9
31-Mar-2007 525,672 21.12% 7.65% 45.89% 2.05% 18.84% 4.45% 559.2
31-March-2012 785,194 22.00% 8.00% 45.00% 2.00% 18.00% 5.00% 883.6
31-March-2013 824,301 22.29% 8.83% 44.40% 1.71% 17.89% 4.88% 914.4
31-March-2014 881,562 22.95% 8.80% 43.17% 1.75% 18.19% 5.14% 957
31-March-2015 938,823 23.53% 8.77% 42.10% 1.79% 18.45% 5.37% 1010.0
31-March-2016 1,001,191 23.86% 8.59% 42.30% 1.66% 17.30% 6.29% 1075
31-March-2017 1,066,268 24.32% 9.22% 40.01% 1.61% 18.33% 6.50% 1122

The per capita annual domestic electricity consumption in India during the year 2009 was 96 kWh in rural areas and 288 kWh in urban areas for those with access to electricity in contrast to the
[55]
worldwide per capita annual average of 2,600 kWh and 6,200 kWh in the European Union.

Rural electrification
[56] Of those who did have access to electricity in rural India, the supply was intermittent and unreliable.
As of 30 November 2017, 99.59% of 597,464 villages in India are electrified. [11]

Rural
electrification [57]
State (Electrification rate, Unelectrified villages)
rate
100% 17 states and all 7 union territories
Karnataka (99.97%, 8), Madhya Pradesh (99.92%, 34), Uttarakhand (99.79%, 33), Bihar (99.72%, 111), Odisha (99.62%, 182), Jharkhand (99.40%,
99.00-99.99%
176), Meghalaya (99.23%, 50), Assam (99.16%, 214), Chhattisgarh (99.10%, 176)
98.00-98.99% Mizoram (98.44%, 11), Jammu & Kashmir (98.44%, 99), Manipur (97.73%, 54)
Below 80% Arunachal Pradesh (79.67%, 1,069)
India's Ministry of Power launched Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) as one of its flagship programme in July 2015 with the objective of providing round the clock power
to the rural areas . It focuses on reforms in rural power sector by separation of feeder lines (rural households & agricultural) and strengthening of transmission and distribution infrastructure.The
[58]
earlier scheme for rural electrification viz. Rajiv Gandhi Grameen iVdyutikaran Yojana (RGGVY) has been subsumed in the new scheme as its rural electrification component.

Up to 31 January 2018, 142 million rural households are provided with electricity [59]
, which is 79% of the 181 million total rural households.

Rural
household
State
electrification
rate
100% Andhra Pradesh, Goa, Punjab, Tamil Nadu, Kerala, Gujarat
95.00-99.99% Himachal Pradesh (99.04%), Puducherry (99.63%), W
est Bengal (99.08%)
Arunachal Pradesh (65.02%), Assam (53.02%), Chhattisgarh(85.64%), Haryana (79.43%), Jammu & Kashmir (79.02%), Karnataka (87.32%), Madhya
50.00-94.99% Pradesh (59.71%), Maharashtra (85.86%), Manipur (72.37%), Meghalaya (69.92%), Mizoram (89.78%), Odisha (54.33%), Rajasthan (76.14%), Sikkim
(84.90%), Telangana (82.65), Tripura (72.00%), Uttarakhand (87.89%)
0.00-49.99% Uttar Pradesh (49.78), Bihar (45.27%), Jharkhand (39.94%), Nagaland (44.93%)

Per-Capita consumption

Per-Capita Electricity consumption(kWh)[60] (in 2014–15 provisional)


Per-Capita Consumption
State/Union Territory Region
(kWh)
Dadra & Nagar Haveli Western 13,769
Daman & Diu Western 6,960
Goa Western 1,803
Gujarat Western 2,105
Chhattisgarh Western 1,719
Maharashtra Western 1,257
Madhya Pradesh Western 813 Satellite pictures of India show thick
haze and black carbon smoke above
Puducherry Southern 1,655 India and other Asian countries. This
Tamil Nadu Southern 1,616 problem is particularly severe along
the Ganges Basin in northern India.
Andhra Pradesh[61] Southern 1,040 Major sources of particulate matter
Telangana Southern 1,356 and aerosols are believed to be
smoke from biomass burning in rural
Karnataka Southern 1,211 parts of India, and air pollution from
Kerala Southern 672 large cities in northern India.

Lakshadweep Southern 657


Punjab Northern 1,858
Haryana Northern 1,909
Delhi Northern 1,561
Himachal Pradesh Northern 1,336
Uttarakhand Northern 1,358
Chandigarh Northern 1,052
Jammu & Kashmir Northern 1,169 Play media
India lit up at night. This media,
Rajasthan Northern 1,123 courtesy of NASA, was taken by the
Uttar Pradesh Northern 502 crew of Expedition 29 on 21 October
2011. It starts over Turkmenistan,
Odisha Eastern 1,419
moving east. India begins past the
Sikkim Eastern 685 long wavy solid orange line, marking
the lights at the India-Pakistan
Jharkhand Eastern 835
borderline. New Delhi, India's capital
West Bengal Eastern 647 and the Kathiawar Peninsula are lit.
Andaman & Nicobar Islands Eastern 361 So are Mumbai, Hyderabad,
Chennai, Bangalore and many
Bihar Eastern 203 smaller cities in central and southern
Arunachal Pradesh North Eastern 525 India, as this International Space
Station's video shifts south-eastward
Meghalaya North Eastern 704 through southern India, into the Bay
Mizoram North Eastern 449 of Bengal. Lightning storms are also
present, represented by the flashing
Nagaland North Eastern 311
lights throughout the video. The pass
Tripura North Eastern 303 ends over western Indonesia.
Assam North Eastern 314
Manipur North Eastern 295
National 1,010

Note: Per Capita Consumption=(Gross Electricity Generation + Net Import) / Mid ear
Y Population.
Electricity generation
India's electricity generation from 1950 to 1985 were very low when compared to developed nations. Since 1990, India has
recorded faster growth in electricity generation. India's electricity generation has increased from 179 TW
-hr in 1985 to 1,057 TW-
hr in 2012.[6] Power generation by coal fired plants and non conventional renewable energy sources (RES) has mainly
contributed to the growth in the total electricity generation, whereas the contribution from natural gas, oil and hydro plants has
decreased in the last five years (2012-2017). The gross utility electricity generation (excluding imports from Bhutan) is 1,236
billion kWh during the year 2016-17 against the corresponding actual generation of 1,168 billion Kwh during the year 2015-16
with 5.81% annual growth.[62] The CEA generation data is nearly 5% more than the NLDC data which is based on prompt data
on daily basis.
*Electricity generation in India till 2012

Yearly gross electricity generation by source(GWh)[3][63]

Fossil Fuel RES[64] Utility and Captive Power


Sub
Year Nuclear Hydro
total Mini Bio Sub
Coal Oil Gas Solar Wind Other Utility Captive Misc Total
hydro mass total
2011-
612,497 2,649 93,281 32,286 130,511 871,224 na na na na na 51,226 922,451 134,387 na 1,056,838
12
2012-
691,341 2,449 66,664 32,866 113,720 907,040 na na na na na 57,449 964,489 144,009 na 1,108,498
13
2013-
746,087 1,868 44,522 34,228 134,847 961,552 na 3,350 na na na 59,615 1,021,167 156,643 na 1,177,810
14
2014-
835,838 1,407 41,075 36,102 129,244 1,043,666 8,060 4,600 28,214 14,944 414 61,780 1,105,446 166,426 na 1,271,872
15
2015-
896,260 406 47,122 37,413 121,377 1,102,578 8,355 7,450 28,604 16,681 269 65,781 1,168,359 183,611 na 1,351,970
16
2016-
944,861 275 49,094 37,916 122,313 1,154,523 7,673 12,086 46,011 14,159 213 81,869 1,236,392 197,000 na 1,433,392
17

Notes: Coal includes lignite also; Misc includes emer


gency DG sets generation, etc.; na → data not available

The total generation from all renewable energy sources is nearly 15% of the total electricity generation (utility and captive) in India.

Thermal power
.[65]
India's electricity sector consumes about 72% of the coal produced in the country

Pollution from thermal power plants


The high ash content in India's coal affects the thermal power plant's potential emissions.[66] Therefore, India's Ministry of Environment and
Forests has mandated the use of beneficiated coals whose ash content has been reduced to 34% (or lower) in power plants in urban, ecologically
sensitive and other critically polluted areas, and ecologically sensitive areas. Coal benefaction industry has rapidly grown in India, with current
capacity topping 90 MT.

India has an extensive review process, one that includes environment impact assessment, prior to a thermal power plant being approved for
construction and commissioning. The Ministry of Environment and Forests has published a technical guidance manual to help project proposers
and to prevent environmental pollution in India from thermal power plants.[67] The operating coal fired power stations need to invest nearly INR
12.5 millions per MW capacity for installing pollution control equipment to comply with the latest emission norms notified by the Ministry of
Environment and Forests in the year 2016.[68][69][70]

Coal supply constraints


A large part of Indian coal reserve is similar to Gondwana coal. It is of low calorific value and high ash content. The carbon content is low in A thermal power plant in
India's coal, and toxic trace element concentrations are negligible. The natural fuel value of Indian coal is poor. On average, the Indian power Maharashtra
plants using India's coal supply consume about 0.7 kg of coal to generate a kWh, whereas United States thermal power plants consume about
0.45 kg of coal per kWh. This is because of the difference in the quality of the coal, as measured by the Gross Calorific Value (GCV). On
average, Indian coal has a GCV of about 4500 Kcal/kg, whereas the quality elsewhere in the world is much better; for example, in Australia, the
GCV is 6500 Kcal/kg approximately.[72] India imported nearly 95 Mtoe of steam coal and coking coal which is 29% of total consumption to
meet the demand in electricity, cement and steel production.[73] China has banned import of high ash coal, high sulphur coal and contaminated
[74]
coal with trace metals which are causing air pollution.

The state and central power generation companies are permitted by Government of India with flexible coal linkage swaps from inefficient plants
to efficient plants and from plants situated away from coal mines to pit head to minimize cost of coal transportation thus leading to reduction in Demand, production and import of
cost of power[75] coal[71] (in million tonnes)

The consumption of coal by the thermal power stations is stagnant during 2017-18 (9 months) as the net capacity addition is negligible after
accounting the retired thermal power capacity and the existing capacity operating at stagnant capacity utilisation (PLF). Most of the incremental electricity demand is catered by the must run
solar, wind, etc. renewable generation capacity.[76][77]

Natural gas supply constraints


The installed capacity of natural gas-based power plants (including the plants ready to be commissioned with the commencement of natural gas supply) is nearly 26,765 MW at the end of
financial year 2014-15. These base load power plants are operating at overall PLF of 25% only due to severe shortage of Natural gas in the country.[78] Imported LNG was too costly for the
power generation. Many of these power stations are shut down throughout the year for lack of natural gas supply. Natural gas shortage for power sector alone is nearly 100 MMSCMD.[79] The
break even price for switching from imported coal to LNG in electricity generation is estimated near 6 US$/mmBtu.[80] Indian government has taken steps to enhance the generation from the
[81]
stranded gas based power plants for meeting peak load demand by waiving applicable import duties and taxes due to drastic fall in the LNG and crude oil international prices.

During the year 2016, global LNG spot prices have been falling drastically below 6 US$/mmBtu due to excess production capacity.[82] Though LNG landed prices are competitive to the
electricity generation from the imported coal, there is limitation to import LNG due to lack of adequate regasification capacity.[83] By the middle of 2016,LPG international spot prices have also
fallen drastically due to LPG market glut.[84] This would facilitate use of LPG in place of Naphtha or diesel oil (23 kg of LPG is equal to one mmbtu) where the gas based power plants are not
able to receive re-gasified LNG.[85] This is possible by injecting cheap imported LPG in to the natural gas supply pipelines up to the permitted
hydrocarbon dew point.

Gasification of coal or lignite or pet coke or biomass, produces syngas or coal gas or wood gas which is a mixture of hydrogen, carbon monoxide and carbon
dioxide gases.[86] Coal gas can be converted into synthetic natural gas by using Fischer–Tropsch process at low pressure and high temperature. Coal gas can
also be produced by underground coal gasification where the coal deposits are located deep in the ground or uneconomical to mine the coal.[87] Synthetic
natural gas production technologies have tremendous scope to meet the SNG requirements of gas-based power stations fully using the locally available coal
(or imported coal in short run).[88] Dankuni coal complex is producing syngas which is piped to the industrial users in Calcutta.[89] Many coal based Gasification of Char/Coal
fertiliser plants which are shut down can also be retrofitted economically to produce synthetic natural gas for bridging natural gas shortages. It is estimated
that SNG production cost would be below 6 $ per mmBtu.[90][91] The indigenously produced natural gas by the Exploration & Production (E&P)
contractors sold at prevailing international gas prices do not guarantee the natural gas supply whereas the SNG produced from coal/ biomass is reliable & dependable fuel supply to the gas based
power stations and other natural gas consumers.

Replacement of old thermal power plants


India's coal-fired, oil-fired and natural gas-fired thermal power plants are inefficient and offer significant potential for greenhouse gas (CO2)
emission reduction through better technologies. India's thermal power plants emit 50% to 120% more CO2 per kWh produced when compared to
the average emissions from their European Union (EU-27) counterparts.[92] The central government has firmed up plans to shut down 11,000
MW of thermal power generation capacity that are at least 25 years old and replace with bigger size plants of super-critical pressure technology
totalling to at least 20,000 MW with for an estimated investment of ₹70,000 crore (US$11 billion).[93] As part of this plan around 100 old units
of capacities ranging between 60 MW to 220 MW will be replaced by around 30 state-of-the-art super-critical units ranging between 660 MW to
800 MW, thus saving ₹40,000 crore (US$6.2 billion) on land acquisition as well infrastructure cost like rail and water linkages along with
facilities like ash pond and power evacuation lines. A super thermal power plantin
Rajasthan
Recently few old diesel generator plants and gas turbine plants (Vatwa 100 MW) were also decommissioned. However their residual life can be
[94]
used effectively for ancillary services by keeping them in working condition and connected to grid.

Renewable energy
India's renewable energy sector is amongst the world's most active players in renewable energy utilization, especially solar and wind electricity generation.[95] As of 30 December 2017, India
had grid connected installed capacity of about 62.85 GW non-conventional renewable technologies-based electricity capacity exceeding the capacity of major hydroelectric power for the first
time in history.[96]

Renewable energy installed capacity in India[4][96] (as of 30 December 2017)


Capacity
Type
(in MW)
Grid Connected Power
Wind 32,848.46
Solar 17,052.37
Small Hydro Power Projects 4,418.35
Biomass Power & Gasificationand Bagasse Cogeneration 8,413.80
Waste to Power 114.08
Total - Grid Connected Power 62,847.06
Off-Grid/Captive Power
Biomass (non-bagasse) Cogeneration 662.61
SPV Systems (>1 kW) 566.96
Waste to Power 178.70
Biomass Gasifiers 163.37
Aerogenerator/Hybrid Systems 3.29
Total - Off-Grid/Captive Power 1,574.93

India has 62.85 GW installed capacity Renewable energy, bidding process for further 115 GW will be completed by Solar resources in India
the end of FY 2019-20 to achieve a total of 175 GW total installed capacity by 31 March 2022, and the central govt
[97]
has set up US$350 million fund to finance the solar projects.

Hydro power
The hydro-electric power plants at Darjeeling and Shivanasamudram were established in 1898 and 1902 respectively and were among the first in Asia.

India is endowed with economically exploitable and viable hydro potential assessed to be about 84,000 MW at 60% load factor. Viable hydro potential keeps on varying depending on the
technological improvements and the prevailing costs of electricity generation from other sources. In addition, 6740 MW from Small, Mini, and Micro Hydro potential have been assessed. Also,
56 sites for pumped storage schemes with an aggregate installed capacity of 94,000 MW have been identified. It is the most widely used form of renewable energy. India is blessed with immense

[98]
amount of hydro-electric potential and ranks 5th in terms of exploitable hydro-potential on global scenario.
[98]
amount of hydro-electric potential and ranks 5th in terms of exploitable hydro-potential on global scenario.

The present installed capacity as of 31 October 2017 is approximately 44,765 MW which is 13.52% of total
installed utility capacity in India.[99] In addition, 4399 MW capacity from Small, Mini, and Micro Hydro schemes
have been installed.[96] The public sector has a predominant share of 97% in this sector.[100] National
Hydroelectric Power Corporation (NHPC), Northeast Electric Power Company (NEEPCO), Satluj jal vidyut nigam Indira Sagar Dam partially completed in 2008
(SJVNL), Tehri Hydro Development Corporation, NTPC-Hydro are a few public sector companies engaged in
development of hydroelectric power in India.

Pumped storage schemes are perfect centralised peaking power stations for the load management in the electricity grid. Pumped storage schemes
would be in high demand for meeting peak load demand and storing the surplus electricity as India graduates from electricity deficit to electricity
surplus.[101] They also produce secondary /seasonal power at no additional cost when rivers are flooding with excess water. Storing electricity
by other alternative systems such as batteries, compressed air storage systems, etc. is more costly than electricity production by standby
hydro power plants.[102][103]
generator. India has already established nearly 4785 MW pumped storage capacity which is part of its installed

Solar power
Nagarjuna Sagar Dam and the 810
India is endowed with vastsolar energy. The solar radiation of about 5,000 trillion kWh per year is incident over its land mass with average daily MW hydroelectric power plant on the
solar power potential of 0.25 kWh per m2 of used land area with the available commercially proven technologies.[105] As of 31 January 2017, Krishna River.
the installed capacity was 9 GW meeting 1% of the utility electricity generation.[64] New solar installations in India is expected to be 4.8 GW in
2016-17 with nearly 21 GW development in pipeline.

Installation of solar power plants require nearly 2.4 hectares (0.024 km2) land per MW capacity which is similar to
coal-fired power plants when life cycle coal mining, consumptive water storage & ash disposal areas are also accounted
and hydro power plants when submergence area of water reservoir is also accounted. 1.33 million MW capacity solar
plants can be installed in India on its 1% land (32,000 square km). There are vast tracts of land suitable for solar power
in all parts of India exceeding 8% of its total area which are unproductive barren and devoid of vegetation.[106] Part of
waste lands (32,000 square km) when installed with solar power plants can produce 2,000 billion Kwh of electricity
(two times the total generation in the year 2013-14) with land annual productivity/yield of ₹1.0 million (US$16,000)
per acre (at 4 Rs/kWh price) which is at par with many industrial areas and many times more than the best productive
irrigated agriculture lands.[107] Moreover, these solar power plants are not dependent on supply of any raw material and
are self productive. There is unlimited scope for solar electricity to replace all fossil fuel energy requirements (natural
gas, coal, lignite, nuclear fuels and crude oil) if all the marginally productive lands are occupied by solar power plants
in future.[108] The solar power potential of India can meet perennially to cater per capita energy consumption at par
with USA/Japan for the peak population in itsdemographic transition.[109]

Indian solar PV power tariff has fallen to ₹2.44 (3.8¢ US) per kWh in May 2017 which is lower than any other type of
power generation in India.[110] In the year 2017, the levelized tariff in US$ for solar electricity has fallen to 1.79 Price history of silicon PV cells (not modules) since 1977.
[111] The great thing about solar power is that it is a technology
cents/kWh which is far cheaper than the fuel cost incurred by coal based power plants in India.
and not a fuel. It is unlimited and the more it is deployed the
Solar thermal power plants with thermal storage are emerging as cheaper (US 5 ¢/kWh) and clean load following power cheaper it would be.[104] While the more limited fossil fuels
are used, the more expensive they become.
plants compared to fossil fuel power plants.[112][113][114] They can cater the load/ demand round the clock perfectly
and work as base load power plants also when the extracted solar energy is found excess in a day.[115] Proper mix of
solar thermal and solar PV can fully match the load fluctuations without the support of costly battery storage or costly non solar power plants
with dispatchability and reliability.[116][117]

Land acquisition is a challenge to solar farm projects in India. Some state governments are exploring means to address land availability through
innovation; for example, by exploring means to deploy solar capacity above their extensive irrigation canal projects, thereby harvesting solar
energy while reducing the loss of irrigation water by solar evaporation.[118] The state of Gujarat was first to implement the Canal Solar Power
Project, to use 19,000 km (12,000 mi) long network of Narmada canals across the state for setting up solar panels to generate electricity. It was
the first ever such project in India.
Solar thermal power plant with a field
of heliostats and a central solar
Synergy with irrigation water pumping and hydr
o power stations
power tower.
The major disadvantage of solar power (PV type only) is that it can not produce electricity during the night time and cloudy daytime also. In
India, this disadvantage can be overcome by installing pumped-storage hydroelectricitystations. Ultimate electricity requirement for river water
pumping (excluding ground water pumping) is 570 billion kWh to pump one cubic meter of water for each square meter area by 125 m height on
average for irrigating 140 million hectares of net sown area (42% of total land) for three crops in a year.[119] This is achieved by utilising all the
usable river waters by interlinking Indian rivers.[120] These river water pumping stations would also be envisaged with pumped-storage
hydroelectricity features to generate electricity when necessary to stabilise the grid needs. Also, all existing and future hydro power stations can
be expanded with additional pumped-storage hydroelectricity units to cater night time electricity consumption. Most of the ground water
[121]
pumping power can be met directly by solar power during the day time.

Canal Solar Power Project in Kadi,


Wind power Gujarat
India has the fifth largest installed wind power capacity in the world. In the year 2015-16, wind power accounted for 8.5% of India's total
installed power capacity, and 2.5% of the country's power output. India targets to install an additional 60 GW of wind power capacity by
2022[122][123]

The development of wind power in India began in the 1990s in Tamil Nadu and has significantly increased in the last decade. As of 30 September 2017, the installed capacity of wind power was
32.70 GW, spread across many states of India.[96] The largest wind power generating state is Tamil Nadu accounting for nearly 30% of installed capacity, followed in decreasing order by
Maharashtra, Gujarat, Rajasthan and Karnataka.[124]

Biomass power
Biomass is organic matter derived from living, or recently living organisms. As an energy source, biomass can either be used directly via
combustion to produce heat, or indirectly after converting it to various forms of biofuel. Conversion of biomass to biofuel can be achieved by
different methods which are broadly classified into: thermal, chemical, and biochemical methods.[125] In this system biomass, bagasse, forestry,
domestic organic wastes, industrial organic wastes and agro residue & agricultural wastes are used as fuel to produce electricity.[126] Nearly 750
million tons of non edible (by cattle) biomass is available annually in India which can be put to use for higher value addition.[127] Biomass is a
renewable energy source as it is generated by extracting the carbon dioxide gas from the atmosphere. Its use for electricity generation is carbon-
neutral fuel because it would also release global warming green house gasses like methane and carbon dioxide when it is left to decay /
degenerate without using as an energy source. The total biomass traditional use in India is nearly 177Mtoe in the year 2013.[128]
Wind farm in Rajasthan.
40% of house holds in India use biomass and charcoal for cooking purpose. As traditional use of biomass is being replaced by LPG in rural areas
at faster pace, biomass burning in agriculture fields has become major source for causing higher level air pollution in nearby towns and
cities.[129][127]

Torrefied biomass

Huge quantity of imported coal is being used in pulverised coal-fired power stations. Raw biomass is not suitable for use in the pulverised coal
mills as they are difficult to grind into fine powder due to its caking problem. However 100% biomass can be fired after Torrefaction in the
pulverised coal mills for replacing imported coal.[130] Torrefied biomass plants can be integrated with existing pulverised coal-fired power
stations using the available hot flue gas as heat source. Cofiring dry biomass up to 20% heat input with coal is possible directly in pulverised
Wind turbines midst India's
coal-fired power stations without facing caking problem.[131] North west and southern regions can replace imported coal use with biomass
agricultural farms.
where surplus agriculture/crop residue biomass is burnt in the fields causing pollution problems. Many old and smaller capacity coal fired power
plants are being shut down permanently due to pollution problems.[132][133] These units can be retrofitted economically to produce electricity
from biomass without appreciable pollution.[134]

Biomass gasifier

India has been promoting biomass gasifier technologies in its rural areas, to utilise surplus biomass resources such as rice husk, crop stalks, small
wood chips, other agro-residues. The goal was to produce electricity for villages with power plants of up to 2 MW capacities. During 2011, India
installed 25 rice husk based gasifier systems for distributed power generation in 70 remote villages of Bihar. The largest biomass-based power
plant in India is at Sirohi, Rajasthan, having the capacity of 20 MW, i.e., Sambhav Energy Limited. In addition, gasifier systems are being
installed at 60 rice mills in India. During the year
, biomass gasifier projects of 1.20 MW in Gujaratand 0.5 MW in Tamil Nadu were successfully
installed.[135]

Biogas

This pilot programme aims to install small-scale biogas plants for meeting the cooking energy needs in rural areas of India. During 2011, some
45000 small-scale biogas plants were installed. Cumulatively
, India has installed 4.44 million small-scale biogas plants.

In 2011, India started a new initiative with the aim to demonstrate medium size mixed feed biogas-fertiliser pilot plants. This technology aims
for generation, purification/enrichment, bottling and piped distribution of biogas. India approved 21 of these projects with aggregate capacity of
1.[135]
37016 cubic metre per day, of which 2 projects have been successfully commissioned by December 201 Wind farms midst paddy fields in
India.
India has additionally commissioned 158 projects under its Biogas based Distributed/Grid Power Generation programme, with a total installed
capacity of about 2 MW.

India is rich in biomass and has a potential of 16,881 MW (agro-residues and plantations), 5000 MW (bagasse cogeneration) and 2700 MW (energy recovery from waste). Biomass power
generation in India is an industry that attracts investments of over INR 6 billion every year, generating more than 5000 million units of electricity and yearly employment of more than 10 million
man-days in the rural areas.

As of 2010, India burnt over 200 million tonnes of coal replacement worth of traditional biomass fuel every year to meet its energy need for cooking and other domestic use. This traditional
biomass fuel – fuelwood, crop waste and animal dung – is a potential raw material for the application of biomass technologies for the recovery of cleaner fuel, fertilisers and electricity with
significantly lower pollution.

Biomass available in India can and has been playing an important role as fuel for sugar mills, textiles, paper mills, and small and medium enterprises (SME). In particular there is a significant
potential in breweries, textile mills, fertiliser plants, the paper and pulp industry .[136]
, solvent extraction units, rice mills, petrochemical plants and other industries to harness biomass power

Geothermal energy
Geothermal energy is thermal energy generated and stored in the Earth. Thermal energy is the energy that determines the temperature of matter. India's geothermal energy installed capacity is
experimental. Commercial use is insignificant.

According to some ambitious estimates, India has 10,600 MW of potential in the geothermal provinces but it still needs to be exploited.[137] India has potential resources to harvest geothermal
energy. The resource map for India has been grouped into six geothermal provinces:[138]

Himalayan Province – Tertiary Orogenic belt with Tertiary magmatism


Areas of Faulted blocks – Aravalli belt, Naga-Lushi, West coast regions and Son-Narmada lineament.
Volcanic arc – Andaman and Nicobar arc.
Deep sedimentary basin of Tertiary age such as Cambay basin in Gujarat.
Radioactive Province – Surajkund, Hazaribagh, Jharkhand.
Cratonic province – Peninsular India
India has about 340 hot springs spread over the country. Of this, 62 are distributed along the northwest Himalaya, in the States of Jammu and Kashmir, Himachal Pradesh and Uttarakhand. They
are found concentrated along a 30-50-km wide thermal band mostly along the river valleys. Naga-Lusai and West Coast Provinces manifest a series of thermal springs. Andaman and Nicobar arc
is the only place in India where volcanic activity, a continuation of the Indonesian geothermal fields, and can be good potential sites for geothermal energy. Cambay graben geothermal belt is
200 km long and 50 km wide with Tertiary sediments. Thermal springs have been reported from the belt although they are not of very high temperature and discharge. During oil and gas drilling
in this area, in recent times, high subsurface temperature and thermal fluid have been reported in deep drill wells in depth ranges of 1.7 to 1.9 km. Steam blowout have also been reported in the
drill holes in depth range of 1.5 to 3.4 km. The thermal springs in India's peninsular region are more related to the faults, which allow down circulation of meteoric water to considerable depths.
The circulating water acquires heat from the normal thermal gradient in the area, and depending upon local condition, emerges out at suitable localities. The area includes Aravalli range, Son-
[138]
Narmada-Tapti lineament, Godavari and Mahanadi valleys and South Cratonic Belts.

In a December 2011 report, India identified six most promising geothermal sites for the development of geothermal ener
gy. These are, in decreasing order of potential:

Tattapani in Chhattisgarh
Puga in Jammu & Kashmir
Cambay Graben in Gujarat
Manikaran in Himachal Pradesh
Surajkund in Jharkhand
Chhumathang in Jammu & Kashmir
Jammu and Kashmir.[139]
India plans to set up its first geothermal power plant, with 2–5 MW capacity at Puga in

Tidal power
Tidal power, also called tidal energy, is a form of hydropower that converts the energy obtained from tides into useful forms of power, mainly electricity. The potential of tidal wave energy
becomes higher in certain regions by local effects such as shelving, funnelling, reflection and resonance.

India is surrounded by sea on three sides, its potential to harness tidal energy is significant. Energy can be extracted from tides in several ways. In one method, a reservoir is created behind a
barrage and then tidal waters pass through turbines in the barrage to generate electricity. This method requires mean tidal differences greater than 4 metres and also favourable topographical
conditions to keep installation costs low. One report claims the most attractive locations in India, for the barrage technology, are the Gulf of Khambhat and the Gulf of Kutch on India's west
coast where the maximum tidal range is 11 m and 8 m with average tidal range of 6.77 m and 5.23 m respectively. The Ganges Delta in the Sunderbans, West Bengal is another possibility,
although with significantly less recoverable energy; the maximum tidal range in Sunderbans is approximately 5 m with an average tidal range of 2.97 m. The report claims, barrage technology
could harvest about 8 GW from tidal energy in India, mostly in Gujarat. The barrage approach has several disadvantages, one being the effect of any badly engineered barrage on the migratory
fishes, marine ecosystem and aquatic life. Integrated barrage technology plants can be expensive to build.

In December 2011, the Ministry of New & Renewable Energy, Government of India and the Renewable Energy Development Agency of Govt. of West Bengal jointly approved and agreed to
implement India's first 3.75 MW Durgaduani mini tidal power project. Indian government believes that tidal energy may be an attractive solution to meet the local energy demands of this remote
delta region.[139]

Another tidal wave technology harvests energy from surface waves or from pressure fluctuations below the sea surface. A report from the Ocean Engineering Centre, Indian Institute of
Technology, Madras estimates the annual wave energy potential along the Indian coast is between 5 MW to 15 MW per metre, suggesting a theoretical maximum potential for electricity
harvesting from India's 7500 kilometre coast line may be about 40 GW. However, the realistic economical potential, the report claims, is likely to be considerably less.[140] A significant barrier
to surface energy harvesting is the interference of its equipment to fishing and other sea bound vessels, particularly in unsettled weather. India built its first seas surface energy harvesting
technology demonstration plant inVizhinjam, near Thiruruvananthpuram.

The third approach to harvesting tidal energy consists of ocean thermal energy technology. This approach tries to harvest the solar energy trapped in ocean waters into usable energy. Oceans have
a thermal gradient, the surface being much warmer than deeper levels of ocean. This thermal gradient may be harvested using modified Rankine cycle. India's National Institute of Ocean
Technology (NIOT) attempted this approach over the last 20 years, but without success. In 2003, with Saga University of Japan, NIOT attempted to build and deploy a 1 MW demonstration
plant.[141] However, mechanical problems prevented success. After initial tests near Kerala, the unit was scheduled for redeployment and further development in the Lakshadweep Islands in
2005. The demonstration project's experience have limited follow-on ef
forts with ocean thermal energy technology in India.

Nuclear power
As of 31 December 2017 India had 6.78 GW of installed nuclear electricity generation capacity or 2% of total installed electricity generation
[142]
capacity in India. India's Nuclear plants generated 37,835 million units in year 2014-15.

India's nuclear power plant development began in 1964. India signed an agreement with General Electric of the United States for the
construction and commissioning of two boiling water reactors at Tarapur. In 1967, this effort was placed under India's Department of Atomic
Energy. In 1971, India set up its first pressurized heavy water reactors with Canadian collaboration in Rajasthan. In 1987, India created Nuclear
Power Corporation of India Limited to commercialize nuclear power
.
Kudankulam Nuclear Power Plant(2
Nuclear Power Corporation of India Limited is a public sector enterprise, wholly owned by the Government of India, under the administrative x 1000 MW) under construction in
control of its Department of Atomic Energy. Its objective is to implement and operate nuclear power stations for India's electricity sector. The 2009.
state-owned company has ambitious plans to establish 63 GW generation capacity by 2032, as a safe, environmentally benign and economically
viable source of electrical energy to meet the increasing electricity needs of India.[143]

India's nuclear power generation effort satisfies many safeguards and oversights, such as getting ISO-14001 accreditation for environment management system and peer review by World
Association of Nuclear Operators including a pre-start up peer review. Nuclear Power Corporation of India Limited admits, in its annual report for 2011, that its biggest challenge is to address
, particularly after the Fukushima incident in Japan.[142]
the public and policy maker perceptions about the safety of nuclear power

In 2011, India had 18 pressurized heavy water reactors in operation, with another four projects of 2.8 GW capacity launched. The country plans to implement fast breeder reactors, using
plutonium based fuel. Plutonium is obtained by reprocessing spent fuel of first stage reactors. India is in the process of launching its first prototype fast breeder reactor of 500 MW capacity in
Tamil Nadu.

India has nuclear power plants operating in the following states: Maharashtra, Gujarat, Rajasthan, Uttar Pradesh, Tamil Nadu and Karnataka. These reactors have an installed electricity
generation capacity between 100 MW and 540 MW each. KKNPP Unit-1 with a capacity of 1,000 MWe was commissioned in July, 2013 while KKNPP Unit-2, also with a capacity of 1,000
MWe is nearing first approach to criticality in 2016.

In 2011, The Wall Street Journal reported the discovery of uranium in a new mine in India, the country's lar
gest ever. The estimated reserves of 64,000 tonnes, could be as lar
ge as 150,000 tonnes
(making the mine one of the world's largest). The new mine is expected to provide India with a fuel that it now imports. Nuclear fuel supply constraints had limited India's ability to grow its
[144]
nuclear power generation capacity. The newly discovered ore, unlike those in Australia, is of slightly lower grade. This mine is expected to be in operation in 2012.

India's share of nuclear power plant generation capacity is just 1.2% of worldwide nuclear power production capacity, making it the 15th largest nuclear power producer. India aims to supply 9%
of it electricity needs with nuclear power by 2032.[142] India's largest nuclear power plant project is planned to be implementedat Jaitapur, Maharashtra in partnership with Areva, France.
India's government is also developing up to 62, mostly thorium reactors, which it expects to be operational by 2025. It is the "only country in the world with a detailed, funded, government-
approved plan" to focus on thorium-based nuclear power. The country currently gets under 2% of its electricity from nuclear power, with the rest coming from coal (60%), hydroelectricity
.[145]
(16%), other renewable sources (12%) and natural gas (9%). It expects to produce around 25% of its electricity from nuclear power

Electricity transmission and distribution


Installed transmission (circuit km) and distribution capacityMVA)
( up to end of March
2015

Substations[146] Transmission lines[147]


Capacity c.km / MVA ratio[148]
(MVA) (c.km)
± 500 kV HVDC 13,500 9,432 0.699
765 kV 121,500 18,644 0.153
Electricity transmission grid in
400 kV 192,422 135,949 0.707
eastern India.
200 kV 268,678 149,412 0.556

As of 2013, India has a singlewide area synchronous gridthat covers the country.[149][150]

The spread of high voltage transmission lines is such that it can form a square matrix of area 416 km2 (i.e. on average, at least one HV line
within 10.2 km distance/vicinity) in entire area of the country. The length of high-voltage transmission lines is nearly equal to that of the United
States (322,000 km (200,000 mi) of 230 kV and above) but transmits far less electricity.[151] The HV transmission lines (132 kV and above)
installed in the country is nearly 700,000 km (430,000 mi) (i.e. on average, at least one ≥13 kV transmission line within 4.5 km distance).[152]
The length of transmission lines (400 V and above and excluding 220 V lines) is 10,558,177 km (6,560,547 mi) as on 31 March 2015 in the
country.[3] The spread of total transmission lines (≥400 V) is such that it can form a square matrix of area 36.8 km2 (i.e. on average, at least one
transmission line within 3 km distance) in entire area of the country
.

The all-time maximum peak load is not exceeding 163,242 MW in the unified grid whereas the all-time peak load met is 160,812 MW on 17
August 2017.[153] The maximum achieved demand factor of substations is not exceeding 60% at 200 kV level. The operational performance of
the huge capacity substations and the vast network of high voltage transmission lines with low demand factor is not satisfactory in meeting the
peak electricity load.[154][155] Detailed forensic engineering studies are to be undertaken and system inadequacies rectified to evolve into smart
[38]
grid for maximising utility of the existing transmission infrastructure with optimum future capital investments.

The July 2012 blackout, affecting the north of the country, was the largest power grid failure in history by number of people affected. The A tower supporting 220 kV line near
Ennore, Chennai
introduction of Availability Based Tariff (ABT) has brought about stability to a great extent in the Indian transmission grids. However, presently
it is becoming outdated in a power surplus grid.

India's Aggregate Transmission and Commercial (ATC) losses is 24.62% in 2014-15.[156][157] Whereas the total ATC loss was only 9.43% out of the 4,113 billion kWh electricity supplied in
USA during the year 2013. The Government has pegged the national ATC losses at around 24% for the year 2011 & has set a target of reducing them to 17.1% by 2017 & to 14.1% by 2022. A
high proportion of non-technical losses are caused by illegal tapping of lines, and faulty electric meters that underestimate actual consumption also contribute to reduced payment collection. A
[45]
case study in Kerala estimated that replacing faulty meters could reduce distribution losses from 34% to 29%.

Regulation and administration


The Ministry of Power is India's apex central government body regulating the electrical energy sector in India. This ministry was created on 2 July 1992. It is responsible for planning, policy
formulation, processing of projects for investment decisions, monitoring project implementation, training and manpower development, and the administration and enactment of legislation in
regard to thermal, hydro power generation, transmission and distribution. It is also responsible for the administration of India's Electricity Act (2003), the Energy Conservation Act (2001) and to
undertake such amendments to these Acts, as and when necessary [158]
, in conformity with the Indian government's policy objectives.

Electricity is a concurrent list subject at Entry 38 in List III of the seventh Schedule of the Constitution of India. In India's federal governance structure, this means that both the central
government and India's state governments are involved in establishing policy and laws for its electricity sector. This principle motivates central government of India and individual state
governments to enter into memorandum of understanding to help expedite projects and reform electricity sector in respective state.[159] To bring transferency and dissemination of information to
[160]
the public in power purchases by the DisComs, Government of India recently stated posting data on daily basis in its website.

Trading
Bulk power purchasers can buy electricity on daily basis for short, medium and long term duration from reverse e-auction facility.[161] The electricity prices transacted under reverse e-auction
[162] Multi Commodity Exchangehas sought permission to offer electricity future markets in India.[163]
facility are far less than the prices agreed under bilateral agreements.

Government-owned power companies


India's Ministry of Power administers central government owned companies involved in the generation of electricity in India. These include National Thermal Power Corporation, Damodar
Valley Corporation, National Hydroelectric Power Corporation and Nuclear Power Corporation of India. The Power Grid Corporation of India is also administered by the Ministry; it is
responsible for the inter-state transmission of electricity and the development of national grid.

The Ministry works with various state governments in matters related to state government owned corporations in India's electricity sector. Examples of state corporations include Telangana
Power Generation Corporation, Andhra Pradesh Power Generation Corporation Limited, Assam Power Generation Corporation Limited, Tamil Nadu Electricity Board, Maharashtra State
Electricity Board, Kerala State Electricity Board, and Gujarat Urja Vikas Nigam Limited.

Funding of power infrastructure


India's Ministry of Power administers Rural Electrification Corporation Limited and Power Finance Corporation Limited. These central government owned public sector enterprises provide
loans and guarantees for public and private electricity sector infrastructure projects in India.
Borrowing by state owned discoms
The accumulated losses of state-owned discoms (without subsidies) rose from Rs 11,699 crore in 2004-05 to Rs 71,271 crore
in 2013-14. These losses have resulted in state discoms relying more on short-term loans to fund their operations. Borrowings
by state discoms rose from Rs 1,58,003 crore in 2007-08 to Rs 5,45,922 crore in 2013-14 (CAGR 23%).
Consequently, the interest cost on these loans worsens the poor finances of state discoms. Poor finances of the discoms fect
af
their ability to buy power, thus leading to power deficits.

Borrowings by state owned discoms


Budgetary support & Commercial losses of discoms
[164] State Electricity Boards get initial financial help
After the enactment of Electricity Act 2003 budgetary support to power sector is negligible.
from Central Government in the event of their unbundling.

Human resource development


Rapid growth of electricity sector in India demands that talent and trained personnel become available as India's new installed capacity adds new jobs. India has initiated the process to rapidly
expand energy education in the country, to enable the existing educational institutions to introduce courses related to energy capacity addition, production, operations and maintenance, in their
regular curriculum. This initiative includes conventional and renewable ener
gy.

A Ministry of Renewable and New Energy announcement claims State Renewable Energy Agencies are being supported to organise short-term training programmes for installation, operation
and maintenance and repair of renewable energy systems in such places where intensive RE programme are being implemented. Renewable Energy Chairs have been established in IIT Roorkee
and IIT Kharagpur.[135] Central Training Institute Jabalpuris a primer Power Distribution Engineering and Management training Institute.

Education and availability of skilled workers is expected to be a key challenge in India's fort
ef to rapidly expand its electricity sector.

Problems with India's power sector


[51][165][166][167]
India's electricity sector faces many issues. Some are:

Inadequate last mile connectivityis the main problem to supply electricity for all users. The country already has adequate generation and transmission capacity to meet
the full demand temporally and spatially .[3] However, due to lack of last-mile link-up withall electricity consumers and reliable power supply (to exceed 99%), many
consumers depend onDG sets using costly diesel oil for meeting unavoidable power requirements. [38] Also more than 10 million households are using battery storage UPS
as back-up in case of load shedding.[168] India imports nearly US$2 billion worth of battery storage UPS every year .[169] The distribution companies should focus on
providing uninterrupted power supply to all the consumers who are using costly DG set's power . This should be achieved by laying separate buried power cables (not to be
effected by rain and winds) for emergency power supply in addition to the normal supply lines. Emergency supply power line shall supply power when the normal power
supply line is not working. Emergency power supply would be charged at higher price without any subsidy but less than the generation cost from diesel oil. Nearly 80 billion
KWh electricity is generated annually in India by DG sets which are consuming nearly 15 million tons of diesel oil.
Demand build up measurescan be initiated to consume the cheaper electricity (average price Rs 2.5 per kWhr) available from the grid instead of running the coal/gas/oil
fired captive power plants in various electricity intensive industries. [170][171] The captive power generation capacity by coal/gas/oil fired plants is nearly 47,000 MW mainly

established in steel, fertiliser, aluminium, cement, etc. industries.[172][3] These bulk captive electricity producers can draw cheaper electricity from the grid on short term
open access (STOA) basis and avoid the costly imported coal/RLNG/natural gas or utilise these fuels for process purposes instead of electricity generation. [173][174] Some

of these idling captive power plants can be used forgrid reserve service for earning extra revenue.[175][176] At present substantial diesel oil is consumed by railways for rail
traffic on its non electrified rail lines. To eliminate the substantial cost of imported diesel fuel, power ministry is envisaging to fund the electrification of these lines and
achieve additional power demand of 7 billion units. [177]

No access to electricity: Over 300 million people in India or 60 million households have no access to electricity .[11] Of those who do, almost all find electricity supply
intermittent and unreliable.[178] However, many of the power stations are idling for lack of electricity demand. The idling generation capacity can supply three times the
domestic electricity needs (nearly 80 billion KWh) of the people who do not have access to electricity .
A system of cross-subsidizationis practiced based on the principle of 'the consumer's ability to pay'. In general, the industrial and commercial consumers subsidize the
domestic and agricultural consumers.[179][180] Further, Government giveaways such as freeelectricity for farmers, partly to curry political favor , have depleted the cash
reserves of state-run electricity-distribution system and led them to amassing a debt of ₹2.5 trillion (US$39 billion).[181] This has financially crippled the distribution network,
and its ability to pay for purchasing power to meet the demand in the absence of subsidy reimbursement from state governments. [182] This situation has been worsened by
state government departments that do not pay their electricity bills.
Name plate/declared capacityof the many coal fired plants owned by IPPs are overrated above the actual maximum continuous rating(MCR) capacity.[183] The reason
for overrating the capacity is to over-invoice the plant cost.[184] These plants operate 15 to 10% below theirdeclared capacity on daily basis and operate rarely at declared
capacity. Thus these units are not effectively contributing to the on line spinning reserves to maintain power system / grid stabilization. This is also due to reason that point
of connection charges are levied in India based on energy exported instead of MCR capacity as applicable for national grid in UK.
Intra day load and demandgraphs are not made in India at every 15 minutes or less intervals to understand power grid nature and its short comings with respect to grid
frequency. These graphs should be plotted with comprehensive data collected fromSCADA / on line for all grid connected generating stations (≥ 100 KW) and load data
from all substations to impart authenticity to the data presented. [185] Comprehensive list of grid connected power stations along with declared capacity shall be prepared by
CEA/POSOCO for all types of power plants (including wind, solar , biomass, co-generation, etc.) and update the data on weekly basis.
Coal supply: Despite abundant reserves of coal, the country isn't producing enough to feed its power plants. India's monopoly coal producer , state-controlled Coal India, is
constrained by primitive mining techniques and is rife with theft and corruption. Poor coal transport infrastructure has worsened these problems. o expand
T its coal
production capacity, Coal India needs to minenew deposits. However, most of India's coal lies under protected forests or designated tribal lands. Any mining activity or land
acquisition for infrastructure in these coal-rich areas of India, has been rife with political demonstrations, social activism and public interest litigations. By the end of year
2015, the international coal prices have dropped to US$42.55 per ton which is below the local coal producers sale price. This situation is transforming coastal power
station's generation cheaper than pit head power station's generation when electricity is made available to major load centers. [31] Being massive consumer of local and
imported coal, India should end the Coal India's coal pricing monopoly and implement coal trading commodities
in stock exchangeto arrive at market determined coal price
on daily basis.[186] This is possible by devising standard coal grades / trading instruments and identifying coal supply hubs in central India, eastern India, west coast and
[32]
east coast to facilitate trading in imported and local coal.
Poor pipeline connectivity and infrastructureto harness India's abundant coal bed methane and natural gas potential. The giant new offshore natural gas fieldhas
delivered far less gas than claimed causing shortage of natural gas.
Average transmission, distribution and consumer-level losses exceeding 30% which includes auxiliary power consumption of thermal power stations, fictitious
electricity generation by wind generators, solar power plants & independent power producers (IPPs), etc.
The residential building sectoris one of the largest consumers of electricity in India. Continuous urbanization and the growth of population result in increasing power
consumption in buildings. Thus, while experts express the huge potential for energy conservation in this sector , the belief still predominates among stakeholders that
energy-efficient buildings are more expensivethan conventional buildings, which adversely af fects the "greening" of the building sector .[187]
Key implementation challengesfor India's electricity sector include new project management and execution, ensuring availability of fuel quantities and qualities, lack of
initiative to develop large coal and natural gas resources available in India, land acquisition, environmental clearances at state and central government level, and training of
skilled manpower to prevent talent shortages for operating latest technology plants. [188]

Hydroelectric power projectsin India's mountainous north and north east regions have been slowed down by ecological, environmental and rehabilitation controversies,
coupled with public interest litigations.
Theft of power: In India, financial loss due totheft of electricity may be around $16 billion yearly. Populist pro-free power measures also bleed the power companies. Some
power companies continue to bleed and lead to bankruptcy due to one of these factors. This also lead to pay more by legal users. This creates a scenario where villages
have huge cut of power and simultaneously availability of power in the grid with no purchase by DISCOMs. It has become menace in India. In a recent case, an engineer
from a discom team died as his car lead to crash, as a mob gathered and attacked his team during there attempt to block the theft.
Losses in the connector systems/service connectionsleading to premature failure of capital equipments like transformers
India's nuclear power generation potentialhas been stymied by political activism since theFukushima disaster. The track record of executing nuclear power plants is
also very poor in India[189]
Lack of clean and reliable energy sourcessuch as electricity is, in part, causing about 500 million people in India to continue depending on traditional biomass energy
[190] Traditional fuel combustion is the primary so
sources – namely fuel wood, agricultural waste and livestock dung – for cooking and other domestic needs. urce of indoor
air pollution in India, causes between 300,000 and 400,000 deaths per year and other chronic health issues.

Foreign electricity trade


India's National Grid is synchronously interconnected to Bhutan, and asynchronously linked with Bangladesh and Nepal.[191] An interconnection with Myanmar,[192] and an undersea
interconnection to Sri Lanka (India–Sri Lanka HVDC Interconnection) has also been proposed.

Despite low electricity per capita consumption in India, the country is going to achieve surplus electricity generation during the 12th plan (2012 to 2017) period provided its coal production and
transport infrastructure is developed adequately.[193][194][195] India has been exporting electricity to Bangladesh and Nepal and importing excess electricity from Bhutan.[196][197] In 2015,
.[198][199]
Nepal imported 224.21 MW of electric power from India, and Bangladesh imported 500 MW

Bangladesh, Myanmar and Pakistan are producing substantial natural gas and using for electricity generation purpose. Bangladesh, Myanmar and Pakistan produce 55 million cubic metres per
day (mcmd), 9 mcmd and 118 mcmd out of which 20 mcmd, 1.4 mcmd and 34 mcmd are consumed for electricity generation respectively.[200][201] Whereas the natural gas production in India
is not even adequate to meet its non-electricity requirements.

Bangladesh, Myanmar and Pakistan have proven reserves of 184 billion cubic metres (bcm), 283 bcm and 754 bcm respectively. There is ample opportunity for mutually beneficial trading in
energy resources with these countries.[202] India can supply its surplus electricity to Pakistan and Bangladesh in return for the natural gas imports by gas pipe lines. Similarly India can develop
on BOOT basis hydro power projects in Bhutan, Nepal and Myanmar. India can also enter into long term power purchase agreements with China for developing the hydro power potential in
Brahmaputra river basin of Tibet region. India can also supply its surplus electricity to Sri Lanka by undersea cable link. There is ample trading synergy for India with its neighbouring countries
in securing its energy requirements.[203]

Electricity as substitute to imported LPG and kerosene


The net import of liquefied petroleum gas(LPG) is 6.093 million tons and the domestic consumption is 13.568 million tons with Rs. 41,546 crores subsidy to the domestic consumers in the year
2012-13.[204] The LPG import content is nearly 40% of total consumption in India.[205] The affordable electricity retail tariff (860 Kcal/Kwh at 90% heating efficiency) to replace LPG (lower
heating value 11,000 Kcal/Kg at 75% heating efficiency) in domestic cooking is 6.47 Rs/Kwh when the retail price of LPG cylinder is Rs 1000 (without subsidy) with 14.2 kg LPG content.
Replacing LPG consumption with electricity reduces its imports substantially
.

The domestic consumption of kerosene is 7.349 million tons with Rs. 30,151 crores subsidy to the domestic consumers in the year 2012-13. The subsidised retail price of kerosene is 13.69
Rs/litre whereas the export/import price is 48.00 Rs/litre. The affordable electricity retail tariff (860 Kcal/Kwh at 90% heating efficiency) to replace kerosene (lower heating value 8240 Kcal/litre
at 75% heating efficiency) in domestic cooking is6.00 Rs/Kwh when Kerosene retail price is 48 Rs/litre (without subsidy).

In the year 2014-15, the plant load factor (PLF) of coal-fired thermal power stations is only 64.46% whereas these stations can run above 85% PLF comfortably provided there is adequate
electricity demand in the country.[206] The additional electricity generation at 85% PLF is nearly 240 billion units which is adequate to replace all the LPG and kerosene consumption in
domestic sector.[207] The incremental cost of generating additional electricity is only their coal fuel cost which is less than 3 Rs/Kwh. Enhancing the PLF of coal-fired stations and encouraging
domestic electricity consumers to substitute electricity in place of LPG and kerosene in household cooking, would reduce the government subsidies and idle capacity of thermal power stations
can be put to use economically. The domestic consumers who are willing to surrender the subsidised LPG/kerosene permits or eligible for subsidized LPG/kerosene permits, may be given free
f.[178]
electricity connection and subsidised electricity tarif

During the year 2014, IPPs are offering to sell solar power below 5.50 Rs/Kwh to feed into the high voltage grid.[208][209] This price is close to affordable electricity tariff for the solar power to
replace LPG and Kerosene use (after including subsidy on LPG & Kerosene) in domestic sector
.

Electric vehicle
The retail prices of petrol and diesel are high in India to make electricity driven vehicles more economical as more and more electricity is generated from solar energy in near future without
appreciable environmental effects.[210] The retail price of diesel is 65.00 Rs/litre in the year 2017-18. The affordable electricity retail price (860 Kcal/Kwh at 75% input electricity to shaft power
efficiency) to replace diesel (lower heating value 8572 Kcal/litre at 40% fuel energy to crank shaft power efficiency) is 12.21 Rs/Kwh. The retail price of petrol is 70.00 Rs/litre in the year 2017-
18. The affordable electricity retail price (860 Kcal/Kwh at 75% input electricity to shaft power efficiency) to replace petrol (lower heating value 7693 Kcal/litre at 33% fuel energy to crank
shaft power efficiency) is 17.79 Rs/Kwh. In the year 2012-13, India consumed 15.744 million tons petrol and 69.179 millon tons diesel which are mainly produced from imported crude oil at
huge foreign exchange out go.[204]

Electricity driven vehicles would become popular in future when its energy storage/battery technology becomes more long lasting and maintenance free.[211][212] V2G is also feasible with
electricity driven vehicles to contribute for catering the peak load in the electricity grid. Electricity driven vehicles can also be continuously charged with Wireless Electricity Transmission
(WET) technology which transmits electricity over 5 km distance without wires to char [213][214]
ge devices (mobile and stationary) between the range of 3-12 volts under any weather conditions.

Energy reserves
India being located mostly south ofTropic of Cancer, its abundant solar power potential along with its wind, hydro and biomass power potential can meet all its energy needs perennially without
depending on fossil fuels.[215] According to Oil and Gas Journal, India had approximately 38 trillion cubic feet (Tcf) of proven natural gas reserves as of January 2011, world's 26th largest.
United States Energy Information Administration estimates that India produced approximately 1.8 Tcf of natural gas in 2010, while consuming roughly 2.3 Tcf of natural gas. The electrical
power and fertiliser sectors account for nearly three-quarters of natural gas consumption in India. Natural gas is expected to be an increasingly important component of energy consumption as
the country pursues energy resource diversification and overall energy security.[216][217]

Until 2008, the majority of India's natural gas production came from the Mumbai High complex in the northwest part of the country. Recent discoveries in the Bay of Bengal have shifted the
centre of gravity of Indian natural gas production.

The country already produces some coalbed methane and has major potential to expand this source of cleaner fuel. According to a 2011 Oil and Gas Journal report, India is estimated to have
between 600 and 2000 Tcf of shale gas resources (one of the world's largest). Despite its natural resource potential, and an opportunity to create energy industry jobs, India has yet to hold a
licensing round for its shale gas blocks. It is not even mentioned in India's central government energy infrastructure or electricity generation plan documents through 2025. The traditional natural
[92][165][218]
gas reserves too have been very slow to develop in India because regulatory burdens and bureaucratic red tape severely limit the country's ability to harness its natural gas resources.
See also
Energy in India Torrefaction Global electricity prices
Energy policy of India Grid parity Economics of new nuclear power
Availability-based tariff Net metering plants
Levelised energy cost Energy cannibalism List of electricity organisations in India
Energy returned on energy invested Electricity market Central Electricity Authority of India
Virtual power plant Demand response List of power stations in India
Coal slurry pipeline Spark spread Indian Rivers Inter-link
Reliance east west gas pipeline Index of solar energy articles

References
1. "WEO - Energy access database"(http://www.worldenergyoutlook.org/resources/ 22. "Indian power system becomes largest operating synchronous grid in the world"
energydevelopment/energyaccessdatabase/). www.worldenergyoutlook.org. (http://timesofindia.indiatimes.com/india/All-India-Power-Engineers-Federation-Ind
Retrieved 11 November 2016. ian-power-system/articleshow/28294988.cms) . The Times of India. Retrieved
2. "India: Indicators for 2015"(https://www.iea.org/statistics/statisticssearch/report/?c 2016-12-02.
ountry=INDIA&product=Indicators&year=2015) . International Energy Agency. 23. "Will try to keep power prices lower, says Piyush Goyal" (http://energy.economicti
Retrieved 6 October 2017. mes.indiatimes.com/news/power/will-try-to-keep-power-prices-lower-says-piyush-
3. "Growth of Electricity Sector in India from 1947-2017"(http://www.cea.nic.in/report goyal/50525720). Retrieved 13 January 2016.
s/others/planning/pdm/growth_2017.pdf)(PDF). CEA. Retrieved 17 February 24. "Dark future ahead? 11,000 mw thermal power capacity lying idle, largest outage
2017. is in the north" (http://energy.economictimes.indiatimes.com/news/power/dark-futu
4. "All India Installed Capacity of Utility Power Stations"(http://www.cea.nic.in/report re-ahead-11000-mw-thermal-power-capacity-lying-idle-largest-outage-is-in-the-no
s/monthly/installedcapacity/2017/installed_capacity-12.pdf)(PDF). Retrieved rth/50556138). Retrieved 13 January 2016.
5 January 2018. 25. "International oil market watch"(http://www.aip.com.au/pricing/marketwatch.htm).
5. "BP Statistical Review of World Energy June 2017" (https://www.bp.com/content/d 26. "Naphtha spot price" (http://www.quotenet.com/commodities/naphtha).
am/bp/en/corporate/pdf/energy-economics/statistical-review-2017/bp-statistical-re 27. "Bunker fuel spot price"(http://www.mabux.com).
view-of-world-energy-2017-full-report.pdf)(PDF).
28. "Global LNG prices lose ground on weak demand"(http://energy.economictimes.i
6. "BP Statistical Review of world energy, 2016" (http://www.bp.com/content/dam/bp/ ndiatimes.com/news/oil-and-gas/global-lng-prices-lose-ground-on-weak-demand/
pdf/energy-economics/statistical-review-2016/bp-statistical-review-of-world-energ 51163611). Retrieved 27 February 2016.
y-2016-electricity.pdf) (PDF).
29. "LNG looks poised to follow crude oil's plunge"(http://in.reuters.com/article/colum
7. "IBEF Power" (http://www.india-opportunities.es/archivos/publicaciones/Power-Ja n-russell-lng-asia-idINL3N15219G).
nuary-2016.pdf) (PDF). IBEF. Retrieved 28 October 2016.
30. "Peaking power generated from imported LNG at Rs 4.70 per unit"(http://economi
8. "Tariff & duty of electricity supply in India"(http://www.slideshare.net/ashishverma ctimes.indiatimes.com/industry/energy/oil-gas/ratnagiri-gmr-gvk-lanco-others-succ
061/tariff-and-duty-of-electricity-supply-in-various-state-of-indiaa-review-by-cea). essful-in-natural-gas-auction/articleshow/51487320.cms) . Retrieved 21 March
report. CEA, Govt. of India. March 2014. 2016.
9. "India can achieve 1,650 billion units of electricity next year , Piyush Goyal" (http:// 31. "Global coal price on down slide, no cheer for Indian power producers"(http://ww
economictimes.indiatimes.com/industry/energy/power/india-can-achieve-1-65-billi w.business-standard.com/article/economy-policy/global-coal-price-on-the-downsli
on-units-of-electricity-next-year-piyush-goyal/articleshow/53103685.cms) . de-115082700011_1.html). Retrieved 13 December 2015.
Retrieved 9 July 2016.
32. "Govt asks Coal India to liquidate pithead stock"(http://www.ptinews.com/news/70
10. "States resolve to provide 24x7 power to everyone by March 2019"(http://econom 30188_Govt-asks-Coal-India-to-liquidate-pithead-stock-.html) .
ictimes.indiatimes.com/industry/energy/power/states-resolve-to-provide-24x7-pow
33. "Daily coal stock report at power stations"(http://www.cea.nic.in/dailycoal.html).
er-to-everyone-by-march-2019/articleshow/52802534.cms) . Retrieved 18 June
2016. 34. "All India installed power capacity (In MW), CEA"(http://www.cea.nic.in/reports/m
onthly/installedcapacity/2017/installed_capacity-03.pdf)(PDF). Retrieved 17 May
11. "Government decides to electrify 5.98 crore unelectrified households by
2017.
December 2018" (http://economictimes.indiatimes.com/industry/energy/power/gov
ernment-decides-to-electrify-598-crore-un-electrified-households-by-december-20 35. "Broad status of thermal power projects, page 17"(http://www.cea.nic.in/reports/m
18/articleshow/52825361.cms). Retrieved 20 June 2016. onthly/broadstatus/2017/broad_status-03.pdf)(PDF). Central Electricity Authority.
April 2017. Retrieved 3 May 2017.
12. "Government decides to electrify 5.98 crore unelectrified households by
December 2018" (http://economictimes.indiatimes.com/industry/energy/power/gov 36. "Executive summary of Power sector, April 2017" (http://www.cea.nic.in/reports/m
ernment-decides-to-electrify-598-crore-un-electrified-households-by-december-20 onthly/executivesummary/2017/exe_summary-04.pdf)(PDF). Retrieved 25 May
18/articleshow/52825361.cms). Retrieved 20 December 2016. 2017.

13. "Draft National Electricity Plan, 2016, CEA"(http://www.cea.nic.in/reports/committ 37. "Gensets add up to under half of installed power capacity; August, 2014" (http://in
ee/nep/nep_dec.pdf) (PDF). Retrieved 11 December 2016. dianexpress.com/article/india/india-others/gensets-add-up-to-under-half-of-installe
d-power-capacity/). Retrieved 13 May 2015.
14. "Let there be light" (http://www.telegraphindia.com/1090426/jsp/calcutta/story_108
66828.jsp). The Telegraph. 26 April 2009. 38. "Modification to existing transmission lines to double the capacity"(http://economi
ctimes.indiatimes.com/industry/energy/power/no-central-help-to-debt-ridden-state-
15. Electricity arrives in Mumbai(http://www.bestundertaking.com/mumbai.asp)
run-power-discoms-piyush-goyal/articleshow/47579813.cms) . Retrieved 9 June
16. "Archives Darjeeling Hydro Power System - IET history - The IET"(http://www.thei 2015.
et.org/resources/library/archives/featured/darjeeling.cfm) . Retrieved 29 July 2015.
39. "The True Cost of Providing Energy to Telecom Towers in India" (http://www.gsm
17. http://www.nyoooz.com/bangalore/118780/bengalurus-first-lamp-post-set-up-in- a.com/membership/wp-content/uploads/2013/01/true-cost-providing-energy-teleco
1905-stands-forgotten m-towers-india.pdf) (PDF). Retrieved 29 August 2015.
18. Daily News & Analysis (20 November 2011)."Relic of India's first electric railway 40. "Executive summary of month of July 2015"(http://www.cea.nic.in/reports/monthl
to be dismantled" (http://www.dnaindia.com/mumbai/report_relic-of-indias-first-ele y/executivesummary/2015/exe_summary-07.pdf)(PDF). Central Electricity
ctric-railway-to-be-dismantled_1614956). dna. Retrieved 29 July 2015. Authority, Ministry of Power, Government of India. July 2015. Retrieved 15 Sep
19. "Cochin International Airport set to become worlds's first fully solar powered major 2015.
airport" (http://www.livemint.com/Politics/nYRV0SGkot3GIOvQrqhBXL/Worlds-first 41. "Load Generation Balance Report 2017-18"(http://www.cea.nic.in/reports/annual/l
-solarrun-airport-in-Kochi.html). LiveMint. Kochi, India. 18 August 2015. gbr/lgbr-2017.pdf) (PDF). Retrieved 2 June 2016.
20. Menon, Supriya. "How is the world's first solar powered airport faring? - BBC 42. "India wont need extra power plants for next three years - Says government
News" (http://www.bbc.com/news/world-asia-india-34421419). Bbc.com. report" (http://economictimes.indiatimes.com/industry/energy/power/india-wont-ne
Retrieved 2016-12-01. ed-extra-power-plants-for-next-three-years-says-government-report/articleshow/5
21. "One Nation-One Grid"(http://www.powergridindia.com/_layouts/PowerGrid/User/ 2545715.cms). Retrieved 13 January 2016.
ContentPage.aspx?PId=78&LangID=english). Power Grid Corporation of India. 43. "Is a distress sale on by private power producers?"(http://www.thehindubusinessli
Retrieved 2 December 2016. ne.com/companies/is-a-distress-sale-on-by-private-power-producers/article74443
21.ece). Retrieved 21 July 2015.
44. "Indian power plants find Rs1.2 trillion of capacity has no takers"(http://www.livem 71. "From Adani to Ambani, How Alleged Over Invoicing of Imported Coal has
int.com/Industry/xBRsCnMXJOeGWTUVQb0ivN/Indian-power-plants-find-19-billio Increased Power Tariffs" (http://thewire.in/2016/04/06/from-adani-to-ambani-how-
n-of-capacity-has-no-take.html). Retrieved 29 June 2015. alleged-over-invoicing-of-imported-coal-has-increased-power-tariffs-27907/).
45. Uwe Remme; et al. (February 2011)."Technology development prospects for the Retrieved 6 April 2016.
Indian power sector" (https://www.iea.org/publications/freepublications/publicatio 72. "Economics of Coal and Gas Based Energy"(http://www.thirdwavesolutions.in/ind
n/technology_development_india.pdf)(PDF). International Energy Agency ex.php/reports-and-opinions/2-uncategorised/14-coal-gas-indian-perspective)
.
France; OECD. Third Wave Solutions. 2012.
46. "Analysis of the energy trends in the European Union & Asia to 2030"(http://www. 73. "Statistical Review of world energy 2014 workbook"(https://web.archive.org/web/
eeas.europa.eu/energy/events/asem_energy_2009/eu_asia_energy_trends_en.p 20140622090917/http://www.bp.com/content/dam/bp/excel/Energy-Economics/sta
df) (PDF). Centre for Energy-Environment Resources Development, Thailand. tistical-review-2014/BP-Statistical_Review_of_world_energy_2014_workbook.xls
January 2009. x). Archived from the original (http://www.bp.com/content/dam/bp/excel/Energy-Ec
47. "Page 1, Draft National Energy Policy, NITI Aayog, 2017" (http://niti.gov.in/writerea onomics/statistical-review-2014/BP-Statistical_Review_of_world_energy_2014_w
ddata/files/new_initiatives/NEP-ID_27.06.2017.pdf)(PDF). Retrieved 3 August orkbook.xlsx) on 22 June 2014. Retrieved 17 June 2014.
2017. 74. "China Bans Use of Coal With High Ash or Sulfur to Fight Smog"(https://www.blo
48. The Partnership for Clean Indoor Air – Sierra Club(http://www.pciaonline.org/sierr omberg.com/news/2014-09-16/china-bans-use-of-coal-with-high-ash-or-sulfur-to-c
a-club). Pciaonline.org. Retrieved on 13 January 2012. ombat-smog.html). Retrieved 17 September 2014.
49. Ganguly; et al. (2001)."INDOOR AIR POLLUTION IN INDIA – A MAJOR 75. "Cabinet nod for flexible domestic coal use to cut costs"(http://economictimes.indi
ENVIRONMENTAL AND PUBLIC HEALTH CONCERN" (http://icmr.nic.in/bumay0 atimes.com/industry/energy/power/cabinet-allows-flexible-use-of-domestic-coal-by
1.pdf) (PDF). Indian Council of Medical Research, New Delhi. -power-plants/articleshow/52114519.cms). Retrieved 5 May 2016.
50. "The Asian Brown Cloud: Climate and Other Environmental Impacts"(https://web. 76. "Subdued growth in thermal power plants utilization as renewables capture
archive.org/web/20120526093020/http://www .rrcap.unep.org/issues/air/impactstu demand" (https://energy.economictimes.indiatimes.com/news/power/subdued-gro
dy/Executive%20Summary.pdf) (PDF). United Nations Environmental wth-in-thermal-power-plants-utilization-as-renewables-capture-demand/6245765
Programme. 2002. Archived fromthe original (http://www.rrcap.unep.org/issues/ai 4). Retrieved 10 January 2018.
r/impactstudy/Executive%20Summary.pdf) (PDF) on 26 May 2012. 77. "Fuel wise electricity generation details — Coal/Lignite/Multi Fuel, December
51. "Indoor air pollution and household energy"(http://www.who.int/heli/risks/indoorai 2017" (http://www.cea.nic.in/reports/monthly/generation/2017/December/tentative/
r/indoorair/en/index.html). WHO and UNEP. 2011. opm_11.pdf) (PDF). Retrieved 10 January 2018.
52. "Green stoves to replace chullahs"(http://articles.timesofindia.indiatimes.com/200 78. "Plant load factor for the gas based power stations, 2013-14, CEA report"
(http://w
9-12-03/india/28096828_1_biomass-climate-renewable-energy-sources) . The ww.cea.nic.in/reports/monthly/generation_rep/actual/mar14/opm_17.pdf)(PDF).
Times of India. 3 December 2009. Retrieved 25 August 2014.
53. "Status of Sewage Treatment in India" (http://www.cpcb.nic.in/newitems/12.pdf) 79. "Growing India Becomes Major LNG Player"(http://oilprice.com/Energy/Natural-G
(PDF). Central Pollution Control Board, Ministry of Environment & Forests, Govt as/Growing-India-Becomes-Major-LNG-Player.html). Retrieved 17 June 2015.
of India. 2005. 80. "Page 71 of World LNG Report - 2015 Edition" (http://igu.org/sites/default/files/nod
54. "Evaluation of Operation And Maintenance Of Sewage rTeatment Plants in India- e-page-field_file/IGU-World%20LNG%20Report-2015%20Edition.pdf)(PDF).
2007" (http://www.cpcb.nic.in/upload/NewItems/NewItem_99_NewItem_99_5.pdf) Retrieved 17 June 2015.
(PDF). Central Pollution Control Board, Ministry of Environment & Forests. 2008. 81. "Imported LNG scheme ineffective for gas-based plants: India Ratings"(http://time
55. "World Energy Outlook 2011: Energy for All"(http://www.iea.org/papers/2011/weo sofindia.indiatimes.com/business/india-business/Imported-LNG-scheme-inef fectiv
2011_energy_for_all.pdf)(PDF). International Energy Agency. October 2011. e-for-gas-based-plants-India-Ratings/articleshow/47603054.cms) . Retrieved
17 June 2015.
56. "Progress report of village electrification as on 31-05-2017"(http://www.cea.nic.in/
reports/monthly/electrification/2017/village_electrification-11.pdf)(PDF). CEA. 82. "Global LNG-Prices extend slump on thin demand"(https://af.reuters.com/article/e
nergyOilNews/idAFL8N1563Q8?sp=true). Retrieved 27 January 2016.
57. http://cea.nic.in/reports/monthly/electrification/2017/village_electrification-10.pdf
83. "The US Drives Forward To Become A Player On The World LNG Market" (http://
58. http://pib.nic.in/newsite/PrintRelease.aspx?relid=123595
oilprice.com/Energy/Energy-General/The-US-Drives-Forward-T
o-Become-A-Playe
59. "Rural households electrification in India"(http://garv.gov.in/garv2/dashboard#2). r-On-The-World-LNG-Market.html). Retrieved 1 July 2016.
Government of India.
84. "Oil traders lose millions as LPG glut shocks market"(http://in.reuters.com/article/
60. "Rajya Sabha - Starred Question No. 897"(http://powermin.nic.in/upload/loksabha usa-lpg-china-idINKCN0ZZ0NI). Retrieved 20 July 2016.
table/pdf/RS_07122015_Eng.pdf)(PDF). Ministry of Power, Govt. of India.
85. "Saudi Aramco LPG Prices"(http://gasenergyaustralia.asn.au/reports-and-submis
Retrieved 2 February 2016.
sions/saudi-aramco-lpg-prices/). Retrieved 20 July 2016.
61. "Consumer wise real Time AP Power Supply Position" (http://www.apvidyutprava
86. "Coal gas can help lower import bill by $10 billion in 5 years: Coal Secy"(http://w
h.in/). Retrieved 4 July 2016.
ww.business-standard.com/article/economy-policy/coal-gas-can-help-lower-import
62. "Monthly generation - March 2017, CEA"(http://www.cea.nic.in/reports/monthly/ge -bill-by-10-billion-in-5-years-coal-secy-117030500463_1.html/) . Retrieved 5 March
neration/2017/March/tentative/tentative.html). Retrieved 3 April 2017. 2017.
63. "Growth of Electricity Sector in India from 1947-2016"(http://www.cea.nic.in/report 87. "Chinese firm plans Thar coal mining in Pakistan"(http://www.steelguru.com/raw_
s/others/planning/pdm/growth_2016.pdf)(PDF). CEA. Retrieved 17 February material_news/Chinese_firm_plans_Thar_coal_mining_in_October/273972.html) .
2017. Retrieved 25 August 2014.
64. "Overview of renewable power generation, CEA"(http://www.cea.nic.in/reports/mo 88. "Reliance Jamnagar coal gasification project"(http://gasification2016.missionener
nthly/renewable/2017/overview-06.pdf)(PDF). Retrieved 3 August 2017. gy.org/presentation/ril.pdf)(PDF). Retrieved 15 January 2017.
65. "Key World Energy Statistics" (http://www.iea.org/publications/freepublications/pu 89. "GAIL, Coal India in pact to expand Dankuni gas project"(http://www.thehindubusi
blication/KeyWorld2013.pdf) (PDF). International Energy Agency. International nessline.in/2004/02/15/stories/2004021501330200.htm) . Retrieved 25 August
Energy Agency. 2013. Retrieved 18 June 2014. 2014.
66. "Thermal power" (http://www.downtoearth.org.in/news/thermal-power-53219). 90. "China's synthetic natural gas revolution"(http://www.edwardtdodge.com/wp-cont
Retrieved 13 March 2016. ent/uploads/2013/10/Jackson_Duke_China_SNG_opinion_2013.pdf)(PDF).
67. "TECHNICAL EIA GUIDANCE MANUAL FOR THERMAL POWER PLANTS" (htt Retrieved 5 March 2017.
p://moef.nic.in/Manuals/Thermal%20Power .pdf) (PDF). Ministry of Environment 91. "Conversion of Coal to Substitute Natural Gas (SNG)"(http://www.hceco.com/HC
and Forests, Government of India. 2009. EI105001.pdf) (PDF). Retrieved 2014-08-06.
68. "power tariffs may rise 70 paise per unit as tocomply with new set of pollution 92. "CO2 EMISSIONS FROM FUEL COMBUSTION HIGHLIGHTS, 2011 Edition" (htt
control norms" (http://economictimes.indiatimes.com/industry/energy/power/power p://www.iea.org/co2highlights/co2highlights.pdf) (PDF). International Energy
-tariffs-may-rise-70-paise-per-unit-as-to-comply-with-new-set-of-pollution-control-n Agency, France. 2011.
orms/articleshow/51087293.cms). Retrieved 22 February 2016.
93. "Government to pump in Rs 70,000 crore in replacing old thermal power plants" (h
69. "Revised standards for Coal-based Thermal Power Plants"(http://www.indiaenviro ttp://articles.economictimes.indiatimes.com/2015-09-16/news/66604570_1_old-un
nmentportal.org.in/content/423111/revised-standards-for-coal-based-thermal-pow its-power-generation-central-electricity-authority)
. The Economic Times. 2015-09-
er-plants/). Retrieved 22 February 2016. 16. Retrieved 2015-09-16.
70. "India to set up FGD plants to cut down emissions from 12 gigawatt coal fired 94. "Retirement of Brahmapuram and Kozhikode diesel power plants"(http://www.ce
power projects" (http://energy.economictimes.indiatimes.com/news/power/india-to a.nic.in/reports/news/bdpp_kdpp_retirement.pdf)(PDF). The Economic Times.
-set-up-plants-to-cut-down-emissions-from-122-gigawatt-coal-fired-power-project Retrieved 6 May 2016.
s/58857751). Retrieved 26 May 2017.
95. Winds of change come to country plagued by power blackouts(https://www.thegu
ardian.com/environment/2008/dec/30/renewable-energy-alternative-energy-wind) .
Guardian. 31 December 2008. Retrieved on 13 January 2012.
96. "Physical Progress (Achievements)"(http://www.mnre.gov.in/mission-and-vision- 122. "Government working to double generation target from solar parks"(http://econom
2/achievements/). Ministry of New and Renewable Energy, Govt. of India. ictimes.indiatimes.com/industry/energy/power/government-working-to-double-gen
Retrieved 18 January 2018. eration-target-from-solar-parks/articleshow/53268569.cms)
. Economic Times. 18
97. Govt to set up $350 million fund to finance solar projects(http://www.hindustantim July 2016. Retrieved 18 July 2016.
es.com/business-news/govt-to-set-up-350-million-fund-to-finance-solar-projects/st 123. "Cost of wind keeps dropping, and there's little coal, nuclear can do to stop it"
(htt
ory-7MtvXS185oQo0SKL2frDYM.html), Hindustan Times, 18 Jan 2018. ps://arstechnica.com/information-technology/2017/11/economics-working-against-
98. "Harnessing gigantic hydro power potential of Indus, Jhelum and Chenab rivers coal-as-cost-of-wind-solar-power-drops/). Retrieved 8 November 2017.
by diverting water to Ravi and Beas rivers"(https://www.scribd.com/document/365 124. "State wise wind power installation"(http://www.windpowerindia.com/weg-installati
955283/Harnessing-gigantic-hydro-power-potential-of-Indus-Jhelum-and-Chenab- ons/). Wind Power India. 2011.
rivers-in-India). Retrieved 30 November 2017. 125. Biomass Energy Center(http://www.biomassenergycentre.org.uk/portal/page?_pa
99. "Executive Summary for the Month of Oct 2017, CEA"(http://www.cea.nic.in/repor geid=76,15049&_dad=portal&_schema=POR TAL). Biomassenergycentre.org.uk.
ts/monthly/executivesummary/2017/exe_summary-10.pdf)(PDF). Retrieved Retrieved on 2012-02-28.
21 December 2017. 126. "Biomass for power generation and CHP"(http://www.iea.org/techno/essentials3.p
100. Hydropower Development in India: A Sector Assessment df) (PDF). International Energy Agency. 2007.
101. "DOE Global Energy Storage Database"(http://www.energystorageexchange.org/ 127. "Maharashtra, Punjab top producers of green energy from farm waste"(http://ww
projects). Retrieved 23 May 2017. w.hindustantimes.com/india-news/maharashtra-punjab-top-producers-of-green-en
102. "Pump Storage Development in India, CEA"(http://www.cea.nic.in/monthlyhepr.ht ergy-from-farm-waste/article1-1385893.aspx). Retrieved 31 August 2015.
ml). Retrieved 23 June 2017. 128. "India was the third-largest energy consumer in 2013"(http://www.eia.gov/beta/int
103. "Pumped storage hydro power plant"(https://web.archive.org/web/201407072116 ernational/analysis.cfm?iso=IND&src=home-b6) . Retrieved 29 July 2016.
19/http://npti.in/Download/Hydro/Pumped%20Storage%20Hydro%20Power%20Pl 129. "Delhi's Air Quality Could Improve 90% If Stubble-Burn In Fields Is Stopped"
(htt
ant%2C%20Electrical%20India%2C%20Nov%2C%202013.pdf)(PDF). Archived p://www.indiaspend.com/special-reports/delhis-air-quality-could-improve-90-if-stub
from the original (http://npti.in/Download/Hydro/Pumped%20Storage%20Hydro%2 ble-burn-in-fields-is-stopped-77532). Retrieved 20 October 2017.
0Power%20Plant,%20Electrical%20India,%20Nov ,%202013.pdf) (PDF) on 7 July 130. "Torrefied Biomass: Available, Efficient, CO2 Neutral and Economic – likely the
2014. Retrieved 2014-08-27. best solid biomass on the market"(http://www.biofuelsdigest.com/bdigest/2016/1
104. "landed solar module prices drop 15% in three months leads to glut"(http://econo 0/20/torrefied-biomass-available-efficient-co2-neutral-and-economic-likely-the-bes
mictimes.indiatimes.com/industry/energy/power/landed-solar-module-prices-drop- t-solid-biomass-on-the-market/). Retrieved 6 April 2017.
15-in-three-months-leads-to-glut-bridge-to-india/articleshow/54407920.cms) . 131. "Cofiring of biomass in coal-fired power plants – European experience"(http://ww
Retrieved 19 September 2016. w.iea-coal.org.uk/documents/83524/9188/Henderson---Cofiring-of-biomass-in-coa
105. "Solar" (http://www.mnre.gov.in/schemes/grid-connected/solar/). Ministry of New l-fired-power-plants-%E2%80%93-European-experience) . Retrieved 2014-09-18.
and Renewable Energy, Govt. of India. Retrieved 21 February 2014. 132. "CEA releases policy to promote power generation from paddy straw"(http://www.
106. "Waste lands atlas of India, 2011"(http://dolr.nic.in/dolr/wasteland_atlas.asp). dnaindia.com/india/report-cea-releases-policy-to-promote-power-generation-from-
Retrieved 30 May 2014. paddy-straw-2562162). Retrieved 25 November 2017.
107. "This Gujarat village is harvesting a sunny crop"(http://energy.economictimes.indi 133. "Air Pollution: Delhi sees hope as NTPC steps in to buy crop residue from
atimes.com/news/renewable/this-gujarat-village-is-harvesting-a-sunny-crop/53473 farmers" (http://www.hindustantimes.com/delhi-news/pollution-delhi-gets-whiff-of-h
954). Retrieved 3 August 2016. ope-as-ntpc-steps-in-to-buy-crop-residue-from-farmers/story-nmfwHl5bDCgdi5Im
108. "How the world's largest solar park is shaping up in Karnataka"(http://www.livemi QPtNQM.html). Retrieved 25 September 2017.
nt.com/Industry/UEJYwZQT5m3wNvGupBShZJ/How-the-worlds-largest-solar-par 134. "Overview of Wood Pellet Co-firing" (http://www.biomasscofiring.ca/images/storie
k-is-shaping-up-in-Karnatak.html). Retrieved 5 March 2017. s/PDFs/WoodPelletCo-firingOverviewFutureMetrics.pdf) (PDF). Retrieved
109. "Population Pyramid of India"(http://populationpyramid.net/india/). 26 February 2017.
PopulationPyramid.net. Retrieved 29 July 2015. 135. "Year End Review – 2011"(http://pib.nic.in/newsite/pmreleases.aspx?mincode=2
110. "Solar power tariffs drops historic low at Rs2.44 per unit" (http://economictimes.in 8). Press Information Bureau, Government of India. December 2011.
diatimes.com/industry/energy/power/solar-power-tarif f-drops-to-historic-low-at-rs-
136. "India, Biofuels Annual 2011"(http://gain.fas.usda.gov/Recent%20GAIN%20Publi
2-44-per-unit/articleshow/58649942.cms). Retrieved 21 May 2017. cations/Biofuels%20Annual_New%20Delhi_India_7-1-2011.pdf)(PDF). United
111. "The Birth of a New Era in Solar PV — Record Low Cost On Saudi Solar Project States Department of Agriculture: Global Agricultural Information Network. July
Bid" (https://cleantechnica.com/2017/10/07/the-birth-of-a-new-era-in-solar-pv-reco 2011.
rd-low-cost-on-saudi-solar-project-bid/). Retrieved 7 October 2017. 137. Geothermal Energy and its Potential in India | For the Changing Planet(http://gre
112. "Solar Reserve awarded AU$78/MWh Concentrated Solar Power contract" (http:// encleanguide.com/2013/07/20/geothermal-energy-and-its-potential-in-india/) .
helioscsp.com/solarreserve-awarded-au78mwh-concentrated-solar-power-contrac Greencleanguide.com (20 July 2013). Retrieved on 6 December 2013.
t/). Retrieved 23 August 2017. 138. "Geothermal fields of India"(http://www.portal.gsi.gov.in/portal/page?_pageid=12
113. "Concentrated Solar Power Dropped 50% in Six Months"(http://helioscsp.com/co 7,699645&_dad=portal&_schema=PORTAL). Geological Survey of India. 2001.
ncentrated-solar-power-dropped-50-in-six-months/) . Retrieved 30 October 2017. 139. "Development of 3.75 MW Durgaduani Mini T idal Power Project, Sunderbans,
114. "The price records for dispatchable solar broken this year:"(http://helioscsp.com/d West Bengal" (http://www.nhpc.gov.in/english/Scripts/RDgeothermal.aspx). NHPC
ispatchable-solar-concentrated-solar-power-broke-price-records-in-2017/) . Limited – A Government of India Enterprise. December 2011.
Retrieved 22 September 2017. 140. "Tidal Energy in India" (http://www.eai.in/ref/ae/oce/oce.html). Energy Alternatives
115. "Aurora: What you should know about Port Augusta's solar power-tower" (http://re India. 2008.
neweconomy.com.au/aurora-what-you-should-know-about-port-augustas-solar-po 141. "Survey of Energy Resources"(http://www.worldenergy.org/documents/otec_coun
wer-tower-86715/). Retrieved 22 August 2017. try_notes.pdf) (PDF). World Energy Council. 2007. pp. 575–576.
116. "SolarReserve receives environmental approval 390 MW solar thermal facility 142. "NPCIL Annual Report, 2010–2011"(http://www.npcil.nic.in/pdf/Corporate_Profile
storage in Chile" (https://solarthermalmagazine.com/2017/07/19/solarreserve-rece _English_Hindi.pdf) (PDF). Nuclear Power Corporation of India Limited. 2011.
ives-environmental-approval-390-megawatt-solar-thermal-facility-storage-chile/)
. 143. "NPCIL Annual Report, 2009–2010"(http://www.npcil.nic.in/main/CompanyProfile.
Retrieved 29 August 2017. aspx). Nuclear Power Corporation of India Limited. 2010.
117. "SolarReserve Bids 24-Hour Solar At 6.3 Cents In Chile"(https://cleantechnica.co 144. "India Steps Up Uranium Exploration After Record Discovery"(https://www.wsj.co
m/2017/03/13/solarreserve-bids-24-hour-solar-6-3-cents-chile/)
. Retrieved m/articles/SB10001424053111903461104576459323026021378) . The Wall
29 August 2017. Street Journal. 21 July 2011.
118. "India's Building A Huge Floating Solar Farm - INDIAN POWER SECT OR" (http://i 145. "Nuclear Power in India"(http://www.world-nuclear.org/info/Country-Profiles/Count
ndianpowersector.com/home/2014/07/indias-building-a-huge-floating-solar-farm/). ries-G-N/India/). Retrieved 29 July 2015.
Retrieved 29 July 2015.
146. "Progress of Susstations capacity in the Country up to March 2015"(http://www.c
119. "Central Water Commission" (http://www.cwc.nic.in/main/webpages/statistics.html ea.nic.in/reports/monthly/transmission/2015/growth_summary_ss-03.pdf) (PDF).
#2). Retrieved 29 July 2015. Central Electricity Authority, Government of India. 2014.
120. National perspectives for water resources development (accessdate 13 July 147. "Progress of Transmission lines in the Country up to March 2015" (http://www.cea.
2014) (http://nwda.gov.in/writereaddata/linkimages/2175421921.pdf) nic.in/reports/monthly/transmission/2015/growth_summary_tx-03.pdf)(PDF).
121. Brown, Lester R. (19 November 2013)."India's dangerous 'food bubble'" (http://w Central Electricity Authority, Government of India. 2014.
ww.earth-policy.org/plan_b_updates/2013/update119). Los Angeles Times. 148. the ratio to be multiplied with transmission line capacity (MVA) to give average
Archived from the original (http://articles.latimes.com/2013/nov/29/opinion/la-oe-br installed length of transmission line per one MV A of installed substation capacity
own-india-food-bubble-famine-20131129)on 4 December 2013. Retrieved 13 July at each voltage level.
2014.
149. http://www.powergridindia.com/_layouts/PowerGrid/User/ContentPage.aspx?
PId=78&LangID=english
150. http://timesofindia.indiatimes.com/india/All-India-Power-Engineers-Federation- 178. "Access to Clean Cooking Energy and Electricity - Survey of States"(http://shaktif
Indian-power-system/articleshow/28294988.cms oundation.in/wp-content/uploads/2014/02/Access-to-Clean-Cooking-Energy-and-
151. "Electricity Transmission, USA" (http://instituteforenergyresearch.org/electricity-tra Electricity-Survey-of-States-Final-Report.pdf)(PDF). Council on Energy,
nsmission/). Institute for Energy Research. September 2, 2014 . Retrieved 31 May Environment and Water report. 2015. Retrieved 15 December 2015.
2015. 179. Samir K Srivastava, Consumers need quality power , The Economic Times, 10
152. "Fixing discoms' finances"(http://www.financialexpress.com/article/fe-columnist/c May 2007, pp. 12 (Available at:
olumn-fixing-discoms-finances/97562/). Retrieved 9 July 2015. http://m.economictimes.com/PDAET/articleshow/msid-2024426,curpg-1.cms ).
153. "August 2017 Monthly report, National load dispatch centre, Ministry of Power , 180. "Progress report of Pumpset Energisation as on 30-09-2015"(http://www.cea.nic.i
Government of India" (https://posoco.in/download/monthly-report-august-2017/?w n/reports/monthly/electrification/2015/pumpset_energization-09.pdf)(PDF).
pdmdl=14401). Retrieved 17 November 2017. Retrieved 14 October 2015.
154. "Enough transmission capacity till 2022, CEA"(http://economictimes.indiatimes.co 181. Anindya Upadhyay; Debjit Chakraborty (22 July 2016)."Top fossil fuel players
m/industry/energy/power/enough-transmission-capacity-till-2022-cea/articleshow/ back PM Narendra Modi's goal to shore up India's clean energy sector" (http://eco
56302012.cms). Retrieved 3 January 2017. nomictimes.indiatimes.com/industry/energy/power/top-fossil-fuel-players-back-pm
-narendra-modis-goal-to-shore-up-indias-clean-energy-sector/articleshow/533360
155. "Power Transmission Maps of India, CEA, Government of India," (http://www.cea.
21.cms). news. Economic Times. Retrieved 22 July 2016.
nic.in/powermaps.html). Retrieved 7 October 2015.
182. "Outstanding dues of power utilities to CPSUs up to July 2014"(http://www.cea.ni
156. "Executive summary for the month of October 2017"(http://www.cea.nic.in/report
c.in/reports/articles/eandc/outstandingdues_cpsu.pdf)(PDF). Central Electricity
s/monthly/executivesummary/2017/exe_summary-10.pdf)(PDF). Retrieved
Authority, Govt. of India. 2014.
2 December 2017.
183. "The power paradox" (http://www.powertoday.in/beststories/News/The-Power-Par
157. "AT& C Losses in Power Distribution"(http://www.sari-energy.org/PageFiles/What
adox/98113). 6 May 2016.
_We_Do/activities/Afghan_Capacity_Building_Program_Aug_09/Engnieer's_Train
ing_of_Trainers/Presentations/English/Week_1-23rd_to_27th_Nov/Naveen_Kapo 184. "Power Tariff Scam Gets Bigger at Rs. 50,000 Crore as Allegations of Equipment
or_-_26th_Nov_1.pdf)(PDF). Retrieved 9 June 2015. Over-Invoicing Emerge"(http://thewire.in/2016/05/18/power-tariff-scam-gets-bigge
r-at-rs-50000-crore-36912/). Retrieved 20 May 2016.
158. "Ministry of Power" (http://www.powermin.nic.in/). Government of India. Retrieved
23 December 2011. 185. "U.K. National Grid Status"(http://www.gridwatch.templar.co.uk/). Retrieved
14 October 2015.
159. "REFORM PROGRAMME OF GUJARA T" (http://www.powermin.nic.in/acts_notific
ation/gujarat.htm). Ministry of Power, Government of India. January 2001. 186. "Coal ministry opposes Niti Aayog's draft energy policy"(http://economictimes.indi
atimes.com/news/economy/policy/coal-ministry-opposes-niti-aayogs-draft-energy-
160. "Merit Order Despatch of Electricity"(http://meritindia.in). Retrieved 17 July 2017.
policy/articleshow/54907262.cms). Retrieved 18 October 2016.
161. "Government asks states to purchase short term power through reverse e-
187. "Energy-efficient buildings – a business casefor India? An analysis of incremental
auction" (http://economictimes.indiatimes.com/industry/energy/power/government
costs for four building projects of the Energy-Ef
ficient Homes Programme"(http://
-asks-states-to-purchase-short-term-power-through-reverse-e-auction/articlesho
www.adelphi.de/en/publications/dok/43509.php?pid=1971).
w/51684372.cms). Retrieved 5 April 2016.
188. "Power Sector in India: White paper on Implementation Challenges and
162. "Reverse e-auction lowering power prices. Ind-Ra"(http://economictimes.indiatim
Opportunities" (http://www.kpmg.de/docs/PowerSector_2010.pdf) (PDF). KPMG.
es.com/industry/energy/power/reverse-e-auction-lowering-power-prices-ind-ra/arti
January 2010.
cleshow/52433857.cms). Retrieved 26 May 2016.
189. "Cheaper renewable energy out paces nuclear power"(http://www.thehansindia.c
163. "MCX move to launch electricity future faces legal hurdle"(http://www.financialexp
om/posts/index/Business/2016-03-20/Cheaper-renewable-energy-outpaces-nucle
ress.com/news/mcx-move-to-launch-electricity-future-faces-legal-hurdle/401592/) .
ar-power/214919). Retrieved 21 March 2016.
The Financial Express.
190. "WEO 2016 biomass database"(http://www.worldenergyoutlook.org/resources/en
164. Ignatius Pereira. " 'No proposal to bring down power price'" (http://www.thehindu.c
ergydevelopment/energyaccessdatabase/). Retrieved 3 March 2017.
om/todays-paper/tp-national/tp-kerala/no-proposal-to-bring-down-power-price/arti
cle6205519.ece). The Hindu. Retrieved 29 July 2015. 191. "Grid Security – Need For Tightening of Frequency Band & Other Measures"(htt
p://www.cercind.gov.in/2011/Whats-New/AGENDA_NOTE_FOR_15TH_CAC_ME
165. "For India, a Power Failure Looms"(https://www.wsj.com/articles/SB10001424052
ETINGHI.pdf) (PDF). Central Electricity Regulatory Commission. Retrieved
970203550304577136283175793516). The Wall Street Journal. 2 January 2012.
2 December 2016.
166. Chris Gascoyne and Alexis Aik (February 2011)."Unconventional Gas and
192. Bhaskar, Utpal (1 January 2014)."India is now one nation, one grid"(http://www.li
Implications for the LNG Market FACTS Global Energy" (http://www.nbr.org/downl
vemint.com/Politics/jIOljqqvinQqqngk7BYLZP/Southern-transmission-line-connect
oads/pdfs/eta/PES_2011_Facts_Global_Energy .pdf) (PDF). Pacific Energy
ed-to-National-Grid.html). Livemint. Retrieved 2 December 2016.
Summit.
193. "Power Minister Piyush Goyal says power available for free"(http://businesstoday.
167. Amol Sharma and Megha Bahree (1 July 2012)."Grinding Energy Shortage Takes
intoday.in/story/power-minister-piyush-goyal-on-power-surplus-electricity/1/21880
Toll on India's Growth" (https://www.wsj.com/articles/SB100014240527023043312
7.html). Retrieved 1 May 2015.
04577352232515290226). The Wall Street Journal.
194. "Daily report of power situation, Ministry of Power, Government of India,"(http://w
168. "Global Solar Storage Market: A Review Of 2015"(http://www.solarquarter.com/in
ww.nldc.in/2013-03-12-10-34-42/daily-report). Retrieved 17 February 2013.
dex.php/technology/504-global-solar-storage-market-a-review-of-2015) . 6 April
2016. 195. "See Reports section, National load dispatch centre, Ministry of Power ,
Government of India," (http://www.nldc.in/). Retrieved 17 February 2013.
169. "Analysis of Imports of battery"(https://www.zauba.com/importanalysis-battery-re
port.html). Retrieved 14 April 2016. 196. "India To Export Another 500 MW Power To Bangladesh In Next 12 Months:
NLDC" (http://www.business-standard.com/article/news-cm/india-to-export-anothe
170. "Day ahead market (DAM) area prices"(http://www.iexindia.com/marketdata/area
r-500-mw-power-to-bangladesh-in-next-12-months-nldc-115071400538_1.html) .
price.aspx). Retrieved 14 August 2016.
Retrieved 15 July 2015.
171. "Monthly report on Short-term Transactions of Electricity in India, May 2015 (Refer
197. "Table 13, Monthly operation report, March 2015" (https://web.archive.org/web/20
Table-5)" (http://www.cercind.gov.in/2015/market_monitoring/MMC_Report_May .p
150524081145/http://www.nldc.in/attachments/article/265/Monthly%20Report%20
df) (PDF). Retrieved 14 August 2015.
March%202015.pdf) (PDF). POSOCO, Govt. of India. March 2015. Archived from
172. "India's steel industry, like America's, is dominated by electric-based processes" the original (http://www.nldc.in/attachments/article/265/Monthly%20Report%20Ma
(https://www.eia.gov/todayinenergy/detail.php?id=34052#). Retrieved 4 January rch%202015.pdf) (PDF) on 24 May 2015. Retrieved 24 April 2015.
2018.
198. https://brage.bibsys.no/xmlui/bitstream/id/419902/14083_FULL TEXT.pdf
173. "IEX, Landed Cost Calculator in open access"(http://www.iexindia.com/landedcos
199. http://southasiajournal.net/prospect-of-a-saarc-power-grid/
tcalculator.aspx?id=26&mid=2). Retrieved 15 July 2016.
200. "Select 'Energy' sections of Pakistan, Burma, Bangladesh, Nepal, Bhutan & Sri
174. "Open Access in Indian power sector"(http://indianpowersector.com/home/wp-co
Lanka. The world Fact book"(https://www.cia.gov/library/publications/the-world-fa
ntent/uploads/2014/07/Report-OPEN-ACCESS-IN-INDIA.pdf)(PDF). Retrieved
ctbook/). Retrieved 17 February 2013.
15 May 2013.
201. "LNG: The whole truth in Pakistan"(http://www.thenews.com.pk/Todays-News-2-3
175. "Report on Indian electricity grid management requirements"(http://www.cea.nic.i
15979-LNG-The-whole-truth). Retrieved 3 May 2015.
n/resd_com_reports.html). Retrieved 17 December 2017.
202. "Saarc Chamber Pushes for Seamless Regional Energy rTade" (http://www.newin
176. "Draft CERC (Ancillary Services Operations) Regulations, 2015"(http://www.cerci
dianexpress.com/business/news/Saarc-Chamber-Pushes-for-Seamless-Regional-
nd.gov.in/2015/draft_reg/draft_notice.pdf)(PDF). Central Electricity Regulatory
Energy-Trade/2015/07/30/article2948453.ece). Retrieved 31 July 2015.
Commission, Govt. of India. 2015. Retrieved 15 May 2015.
203. "Turning India's power surplus into a boon"(http://www.livemint.com/Opinion/gMH
177. "Piyush Goyal meets Suresh Prabhu to discuss 35k km rail line electrification" (htt
zq8PehmA7Hwh6wsgsaN/Turning-Indias-power-surplus-into-a-boon.html).
p://economictimes.indiatimes.com/industry/energy/power/piyush-goyal-meets-sur
Retrieved 26 October 2016.
esh-prabhu-to-discuss-35k-km-rail-line-electrification/articleshow/52113619.cms) .
Retrieved 5 May 2016. 204. "Indian Petroleum & Natural Gas statistics"(http://petroleum.nic.in/more/indian-pn
g-statistics). Retrieved 25 April 2017.
205. "India challenges China as world's biggest LPG importer"(https://energy.economi 212. "Explaining the Surging Demand for Lithium-Ion Batteries"(http://www.visualcapit
ctimes.indiatimes.com/news/oil-and-gas/india-challenges-china-as-worlds-biggest alist.com/explaining-surging-demand-lithium-ion-batteries/)
. Retrieved 5 May
-lpg-importer/62263809). Retrieved 27 December 2017. 2016.
206. "All India coal fired stations performance (2014-15)"(http://www.cea.nic.in/reports/ 213. "Made in India - Aglaya to Release Wireless Electricity rTansmission for Defence
monthly/generation/2015/March/actual/actual.html) . Retrieved 27 May 2014. and Intelligence Deployment at the Indian DefExpo 2016"(http://www.prnewswire.
207. "Niti Aayog pitches for electricity as clean cooking option to LPG"(http://economic co.in/news-releases/made-in-india---aglaya-to-release-wireless-electricity-transmi
times.indiatimes.com/news/economy/policy/arvind-panagariya-pitches-for-electrici ssion-for-defence-and-intelligence-deployment-at-the-indian-defexpo-2016-57147
ty-as-clean-cooking-option-to-lpg/articleshow/51786931.cms) . Retrieved 13 April 4461.html). Retrieved 5 March 2016.
2016. 214. "Review of Recent Advances in Dynamic and Omnidirectional Wireless Power
208. "Madhya Pradesh plans India's largest Solar Power Plant"(http://indianpowersect Transfer" (http://ias.ieee.org/images/files/Webinars/IAS-webinar---Zeljko-Pantic---
or.com/home/2014/08/madhya-pradesh-plans-indias-largest-solar-power-plant/). June-2016.pdf) (PDF). Retrieved 7 July 2016.
Retrieved 3 August 2014. 215. "An entirely renewable energy future is possible"(http://helioscsp.com/an-entirely-
209. "Solar power bidders accept Rs 6.49/unit offer from AP" (http://www.thehindubusi renewable-energy-future-is-possible/). Retrieved 13 September 2017.
nessline.com/news/states/solar-power-bidders-accept-rs-649unit-of fer-from-ap/art 216. "Natural Gas – Proved Reserves"(https://web.archive.org/web/20130309174844/
icle4873499.ece). Retrieved 27 May 2014. https://www.cia.gov/library/publications/the-world-factbook/rankorder/2179rank.ht
210. "Economics of fuel cell electric vehicles and needed transport sector policy in ml). CIA World Factbook. Archived fromthe original (https://www.cia.gov/library/p
India" (https://www.scribd.com/document/332195358/Economics-of-fuel-cell-electr ublications/the-world-factbook/rankorder/2179rank.html)on 9 March 2013.
ic-vehicles-and-needed-transport-sector-policy-in-India)
. Retrieved 25 November Retrieved January 2012. Check date values in: |access-date= (help)
2016. 217. "Country Analysis Brief: India"(http://www.eia.gov/countries/country-data.cfm?fips
211. "Plans afoot to make India 100% e-vehicle nation by 2030. Piyush Goyal"(http://e =IN). U.S. Energy Information Administration. 2011.
conomictimes.indiatimes.com/industry/auto/plans-afoot-to-make-india-100-e-vehic 218. "India starts testing shale-gas plays"(http://www.ogj.com/articles/print/volume-10
le-nation-by-2030-piyush-goyal/articleshow/51557146.cms). Retrieved 26 March 9/issue-49/drilling-production/india-starts-testing-p1.html)
. Oil and Gas Journal. 5
2016. December 2011.

External links
National electricity Plan - 2012, CEA, Government of India
Electricity grid maps of southern region
Macro Patterns in the Use of Traditional Biomass Fuels – A Stanford/TERI report on energy sector and human history
India's Energy Policy and Electricity Production

Retrieved from "https://en.wikipedia.org/w/index.php?title=Electricity_sector_in_India&oldid=823624708


"

This page was last edited on 2 February 2018, at 11:38.

Text is available under theCreative Commons Attribution-ShareAlike License ; additional terms may apply. By using this site, you agree to theTerms of Use and Privacy Policy.
Wikipedia® is a registered trademark of theWikimedia Foundation, Inc., a non-profit organization.

You might also like