Daily Concrete Update - East Side

DATE AREA Description Drawing Quantity REMARKS SUPERVISOR NAME


3/17/2018 BA Building Footings 23 F1- 3no.s, F3- 1no, F4- 1no, F5- 1no; Jena
3/17/2018 SS-2 Transformer Wall 13 G 25202-TX Ravi
3/17/2018 3306-06-SU-01 FOOTING 30 SANJAY/GUPTA
3/18/2018 Duct Banks IDB-040 15.43 Duct Bank Parteek
3/18/2018 SS-2 Transformer Foundation 6 G-25211-TX Ravi
3/18/2018 3407-06-SU-01 Pedestal 15.98 Sultan
3/18/2018 3507-03-PL-01 Pedestal 11.49 Sultan
3/18/2018 3306-07-SU-01 Pedestal 11.81 Gupta
3/18/2018 3306-07-PL-01 Pedestal 2.74 Gupta
3/19/2018 3405-01-SU-01 Pedestal 14 10 Pedestals Rama Shankar
3/19/2018 3405-04-SS-01 Footing 13 1 Footing Rama Shankar
3/19/2018 A-3801 Footing 37.4 Gupta
3/20/2018 Duct Banks EDB-175 4.24 Parteek
3/20/2018 Duct Banks IDB-044 2.89 Parteek
3/20/2018 Duct Banks EDB-082 20.42 Parteek
3/20/2018 T-3501 Dyke Wall 70 Sultan
3/20/2018 3507-02/03-TR-01 Pedestal 14.5 12 Pedestal Sultan
3/20/2018 3101-51-TR-01 Pedestal 12 4 Pedestal Gupta
3/21/2018 3101-52-SS-01 Footing 18 5 Footing Rama Shankar
3/21/2018 3405-01-SU-01 Pedetsal 9 6 Pedestal Rama Shankar
3/21/2018 3402-03-SU-01 Pedestal 2.15 Total Pedestal Rama Shankar
3/21/2018 BA Building FOOTING 6 2 No.s Jena
3/21/2018 KMCR Door Lintel/Precast 1.5 Toilet lintel & Precast Jena
3/22/2018 Duct Banks EDB-275 23.15 Parteek
3/22/2018 Duct Banks IDB-041 32.41 Parteek
3/22/2018 3101-49-TR-01 Footing 46.28 1 Footing Gupta
3/22/2018 E-4301 Pedestal 5.68 9 Pedestals SANJAY
3/23/2018 P-4911 A/B Footing 8 Sultan
3/23/2018 A-4921 Footing 6 Sultan
3/23/2018 V-4503/4603 Pedestal 17.1 Rama Shankar
3/24/2018 3406-08-PL-02 Footing 24.45 All Footings Sultan
3/24/2018 3206-01-PL-03 Footing 2.04 All Footings Sultan
3/24/2018 S-4912 Footing 5.26 Only Footing Sultan
3/24/2018 3407-05-SU-01 Pedestal 2.035 Sultan
3/24/2018 3402-06-SU-02 Pedestal 1.62 9 Pedestals Sultan
3/24/2018 3407-06-SU-01 Pedestal 1.8 Sultan
3/24/2018 3406-13-TS-01/ 3406-12-SU-01 Pedetsal 7 4 Pedestal Sultan
3/24/2018 3402-02-TS-01 Pedetsal 7 4 Pedestal Rama Shankar
3/24/2018 E-4507 Pedestal 1.35 2 Pedestal Rama Shankar
3402-01-PL-02 Pedestal 1.41 6 Pedestal Rama Shankar
Staircase 5; Stiffener Beam;
3/24/2018 KMCR Staircase/Door Lintel/SB Door Lintel 8 Jena
3/25/2018 3405-01-PL-03 Footings 20.18 3 Footings Rama Shankar
3/25/2018 3404-02-PL-01 PCC
3/25/2018 3404-02-SU-01 PCC for 10 Footings
3/25/2018 Duct Banks EDB-021 21.18 Parteek
3/25/2018 KMCR Stiffener Beam(Toilet) 1.5 Men's Toilet Stiffener Beam Jena
3/25/2018 3402-01-PL-02 Footing 2.39 Rama Shankar
3/26/2018 Duct Banks EDB-189 14.33 Parteek
3/26/2018 A-8381 Pedetsal 15.75 6 Pedestal Gupta
3/27/2018 Duct Banks EDB-241 12.34 Parteek
3/27/2018 T-3501 Dyke Wall Footing 33 Sultan
3/27/2018 3403-02-TS-01 Footing 8.46 F2 (A to A-2) to ( 2.7 to 3) Rama Shankar
3/27/2018 3101-52-SS-01 Footing 3.06 Rama Shankar
3/27/2018 3306-07-SU-01 Pedestal 1 Gupta
3/27/2018 3601-03-PL-01 Foooting 10.097 5 Footings Gupta
3/27/2018 Unit 23 Pipe Supports Footings 5.624 3601-03-FD-3009,1008,1011,1012 Gupta
3/28/2018 M-4801/E-4801/E-4802 Pedestal 8 4 No.s Rama Shankar
3/28/2018 E-4508, E-4608, E-4803 Pedetsal 12.05 13 Pedetsals Sultan
3/28/2018 3507-01-PL-02&07 Footings 2.7 3 Footings Sultan
3/28/2018 Duct Banks IDB-038 8.98 Parteek
3/29/2018 Duct Banks TDB-081 9.8 Parteek
3/29/2018 Duct Banks IDB-074 15.4 Parteek
3/29/2018 Dog House SS-2 2.6 Precast Slab Ravi
3/29/2018 3306-03-SU-01 Pedestals 18.33 12 Pedestal Gupta
3/29/2018 3306-01/04-SS-01 Footings 8.52 3 Footings Gupta
3/29/2018 3306-06-SU-01 Footings 7 2 Footings Gupta
3/29/2018 A-4302 Pedestals 1.89 2 Pedestals Gupta
3/29/2018 3405-02-SU-01 Footings 3.89 4 Footings Rama Shankar
3/29/2018 3405-04-PL-03 Footings 8.47 7 Footings Rama Shankar

BA Building Grade Beam 31 Jena


Grade Beam along with columns(Staircase grade bea, yet to
3/31/2018 be done)
3/31/2018 KMCR Toilet Lintel Concrete 1 Vertical Stiffener Jena
3/31/2018 Duct Banks TDB-082 12.21 Parteek
3/31/2018 3407-02-PL-01 Footings 8.85 Sultan
3/31/2018 3405-01-SU-02 Footings 6.75 Rama Shankar
3/31/2018 3403-01-PL-02 Footings 2.4 Rama Shankar
3/31/2018 E-4607 Footings 1.28 Rama Shankar
3/31/2018 3406-13-TS-01 PCC Sultan
13 Footings
3/31/2018 3406-12-SU-01 PCC Sultan
4/1/2018 3402-06-SU-01 Pedestal 14.46 18 Pedestals Sultan
4/1/2018 3504-12-SU-01 Footings 14 6 Footings Gupta
4/1/2018 A-8381 Pedestals 2.5 2 Pedestal Gupta
4/2/2018 T-3501 Dyke Wall Raf 35 Sultan
4/2/2018 3601-01-SU-01 Pedestal 13.95 8 Pedestal Gupta
4/3/2018 Duct Banks PCC IDB 073 Parteek
4/3/2018 Duct Banks TDB-003 4.5 Parteek
4/3/2018 3405-01-SU-01 Pedestal 12 Rama Shankar
4/3/2018 3306-03-SU-01 Pedetsal 13 Gupta
4/3/2018 3504-12-PL-03 Footings 44.5 Gupta
4/3/2018 Pipe Support Unit 87 Pedestal 5.5 3507-05-FD-1003-1017 Sultan
4/3/2018 Pipe Support Unit 35 Footing 2.5 3206-01-FD-1013, 1017 Sultan
4/4/2018 Duct Banks 23.81 EDB-188,198; IDB-031,076; TDB-014; Parteek
4/4/2018 3404-03-PL-02 Footing 9.34 6 Footing Sultan
4/4/2018 3404-02-SS-01 Footing 3.41 2 Footings Sultan
4/4/2018 3404-02-PL-01 to 03 Footing 7.96 6 Footing Sultan
4/4/2018 3404-02-SU-01 Footing 14.18 5 Footings Sultan
4/4/2018 3206-03-FD-1001, 1002 Footing 0.6 2 Footings Sultan
4/5/2018 BA Building Grade Beam, Columns 8 Stair-case Beam and Columns/ Precast Fdns Jena
4/5/2018 T-3501 Dyke Wall 31 Sultan
4/5/2018 3401-03-SS-01 26.5 5 Footing Rama Shankar
4/5/2018 3101-52-SS-01 9.2 3 Footing Rama Shankar
4/7/2018 BA Building Columns 5 Jena
4/7/2018 3601-01-SU-01/3601-01-PL-01 Footing 75.8 8 Footings Gupta
4/7/2018 3101-49-TR-01 Pedestal 6.19 all Pedestal Gupta
4/8/2018 Transformer @ SS-2 Footing 11 G-25201-TX Ravi
4/8/2018 3206-01-PL-03 Pedestal 2.14 4 Pedestal Sultan
4/8/2018 3404-03-SS-01 Pedestal 2.61 4 Pedestal Sultan
4/8/2018 3206-06-FD-1001, 1004, 1006, 1007; PCC
4/9/2018 Duct banks 20.71 IDB 071,EDB 223, 308; Parteek
4/9/2018 BA Building Columns 2.5 Jena
4/9/2018 3601-01-SU-01/3601-01-PL-01 Pedestals 15.4 10 Pedestals Gupta
4/9/2018 3406-12-SU-02 Footings 10.21 6 footings Sultan
4/9/2018 3405-01-SU-01 Pedestals 7.1 Rama Shankar
4/9/2018 3403-02-TS-01 Pedestals 5.4 Rama Shankar
4/9/2018 Unit 48 Pipe Supports Footing 1.6 3405-04-FD-1006 Rama Shankar
4/10/2018 Duct Banks 24.38 IDB 073, TDB 089 Parteek
4/10/2018 3306-06-SU-01/3306-06-PL-02 Pedestals 16.96 11 Pedestals Gupta
4/10/2018 3306-01/04-SS-01 Footings 8.52 3 No.s Gupta
4/10/2018 A-8361 Footings 17 1 No. Gupta
4/11/2018 STG Stiffener Beam 2 A(2 to 6) Jena
4/11/2018 A-8381 Deck Slab 43 Lube Oil Console Skid (A-8381) Gupta
4/11/2018 A-8361 Footings 23 6 Footings Gupta
4/12/2018 T-4701 Dyke Wall Raf 18 Sultan
4/12/2018 T-3501 Dyke Wall 17 Sultan
4/12/2018 3404-02-SS-01 Pedestals 2.77 7 No.s Sultan
4/12/2018 3406-08-PL-02 Pedetsals 9.49 12 No.s Sultan
4/12/2018 P-3504 PCC
4/12/2018 3206-08-PL-01 to 03 PCC
4/13/2018 Duct Banks 50.99 EDB 195, 242; IDB- 028; Parteek
4/13/2018 3405-03-PL-01 Footing 9.17 Rama Shankar
4/13/2018 Unit 48 Pipe Supports Footing 3.6 3405-01-FD-1004 Rama Shankar
4/13/2018 P-4605 A/ P-4605 B Footing 6.83 Rama Shankar
4/13/2018 3405-04-SS-01 4.33 6 Pedestals Rama Shankar
4/13/2018 A-8361/A-8371 Footing 22 Equal Share in Both Gupta
4/14/2018 A-4301 Footing 69.82 Gupta
4/14/2018 3406-13-TS-01 / 3406-12-SU-01 Footings 7.99 6 footings Gupta
4/14/2018 3507-01-PL-02&07 Pedetsals 2.145 3 No.s Sultan
4/14/2018 Unit 87 Pipe Supports Footings 4.904 3507-01-FD-1004, 1005, 3014, 3015; Sultan
4/14/2018 3407-06-PL-01 to 04 PCC 8 No.s
4/15/2018 3601-01-SU-01 / 3601-01-PL-01 Pedestals 13.02 8 No.s Gupta
4/15/2018 A-8371 Footings 29.00 4 No.s Gupta
4/15/2018 3101-52-SS-01 Pedetsals 10.89 20 No.s Gupta
4/15/2018 Transformer @ SS-2 Inside Footing 9.7 G-25202-TX Ravi
4/16/2018 A-8371 Footings 13.5 Gupta
4/16/2018 3407-08-PL-01 & 02 Pedestals 2.9 8 Pedestals Sultan
4/16/2018 3504-12-SS-03 PCC for 4 Footings
4/16/2018 Unit 35 Pipe Supports PCC 3206-03-FD-1003
4/17/2018 Duct Banks 56.6 EDB- 304, 305 Parteek
4/17/2018 3401-03-SS-01 Footings 24.30 6 Footings Rama Shankar
4/17/2018 3403-01-PL-02 Pedestals 1.74 6 Pedestals Rama Shankar
4/17/2018 E-4607 Pedestals 1.36 2 Pedestals Rama Shankar
4/17/2018 T-4701 Dyke Wall 24 Dyke wall Sultan
4/17/2018 Unit 35 Pipe Supports Footings 3.88 3206-01-FD-1015; Sultan
4/17/2018 Unit 35 Pipe Supports Footings 6.35 3206-06-FD-1001, 1004, 1006, 1007 Sultan
4/18/2018 Duct Banks IDB-069 24.6 IDB-069 Parteek
4/18/2018 SS-2 DH-9 1 Dog House- 9 Wall Second lif Ravi
4/18/2018 3306-06-SU-01/ 3306-06-PL-02 Pedestals 18.6 15 No.s Gupta
4/18/2018 T-3501 Dyke Wall 18 Dyke Wall Sultan
4/18/2018 3206-08-PL-01 to 03 Footings 1.52 3 No.s Sultan
4/18/2018 Unit 35 Pipe Supports Footings 2.73 3206-08-FD-1050, 1051 Sultan
4/19/2018 BA Building Roof Slab 76 Roof Slab + Column Caps Jena
4/19/2018 A-8361 Footing 26.52 F8 Gupta
4/19/2018 P-3502 A/B Footings 15.99 2 No.s Sultan
4/19/2018 P-3504 Footings 4.33 1 No. Sultan
4/19/2018 3406-09-PL-02 Footings 3.675 4 No.s Sultan
4/19/2018 Unit 87 Pipe Supports Footing 1.35 3507-05-FD-1002, 1003 Sultan
4/19/2018 3504-13-PL-01 PCC 5 No.s
4/19/2018 3306-01/04-SS-01 PCC 3 No.s
4/20/2018 Duct Banks 55.7 EDB-113, 016 Parteek
4/21/2018 Unit 43 Pipe Supports 3306-03-FD-1001, 1002; 3306-06-FD-1001, 1002 Sundar Murthy
4/22/2018 3405-01-SU-01 Pedestals 14 12 No.s Rama Shankar
4/22/2018 Unit 48 Pipe Supports 3 3405-01-FD-1002 Rama Shankar
4/22/2018 3504-12-PL-04 Footings 83 1 No.s Sundar Murthy
4/23/2018 Duct Banks 27.72 EDB-248, 249 Parteek
4/23/2018 3601-03-PL-01 Pedestals 6.8 8No.s Sundar Murthy
4/23/2018 3601-01-SU-01 Pedestals 14.1 12 No.s Sundar Murthy
4/23/2018 Unit 87 Pipe Supports Footings 4.1 3507-02-FD-1002, 1008, 1009, 1010, 1012, 1013 Sultan
4/23/2018 3404-02-SS-01 / 3404-03-PL-02 Pedestals 6.5 10 No.s Sultan
4/24/2018 3504-12-PL-04 Footings 12.29 3 No.s Sundar Murthy
4/24/2018 3504-12-PL-05 TO 07 Footings 5.74 4 No.s Sundar Murthy
4/24/2018 3504-12-SS-02/03 Footings 9.03 4 No.s Sundar Murthy
4/24/2018 3405-01-PL-03 Pedestals 10.5 12 Pedestals Rama Shankar
4/24/2018 3404-02-PL-01 TO 03 Pedestals 4.76 12 No.s Sultan
4/24/2018 3404-02-SU-01 Pedestals 2.79 6 No.s Sultan
4/24/2018 3407-06-PL-01 to 04 Footings 9.88 8 No.s Sultan
4/25/2018 3401-03-SS-01 Footings 18.00 F6- 8 Nos., F7- 1 No., Rama Shankar
4/25/2018 E-4902 A/B Footings 10.56 2 No.s Rama Shankar
4/25/2018 3504-12-PL-04 Footings 11 3 No.s Sundar Murthy
4/25/2018 3504-12-PL-05 Footings 6.47 3 No.s Sundar Murthy
4/25/2018 3504-12-PL-01 Footings 3.05 2 No.s Sundar Murthy
4/25/2018 T-3501 Dyke Wall 13 Dyke wall Sultan
4/25/2018 Duct Banks 12.61 EDB- 187, 320 Parteek
4/26/2018 3306-01/04-SS-01 Footings 8.52 3 No.s Sundar Murthy
4/26/2018 3306-03-SU-01 / 3306-03-PL-02 Pedestals 7.62 5 No.s Sundar Murthy
4/26/2018 3306-06-SS-01 / 3306-06-PL-02 Pedestals 1.5 1 No. Sundar Murthy
4/26/2018 A-8371 Footings 11 7 No.s Sundar Murthy
4/28/2018 Duct Banks 10.89 TDB-090, TDB-072 Parteek
Staircase No- 2; Dog House Tie beam DH- 01, 02; Precast
4/28/2018 KMCR 6 No.s - 50 Jena
4/28/2018 Transformer Fnds SS-2 Footings 4.06 3102-02-FD-095, 097, 099, 101 Ravi
4/28/2018 A-8371 Footings 8.6 3 No.s Sundar Murthy
4/28/2018 P-4505 A/B Footings 6.832 2 No.s Rama Shankar
4/28/2018 E-4903 Footings 0.9 1 No. Rama Shankar
4/28/2018 3406-12-SU-01 Footings 2.85 3 No.s Rama Shankar
4/28/2018 Unit 87 Pipe Supports Footings 0.51 F4- 1 No. Sultan
4/28/2018 Unit 87 Pipe Supports Pedestals 1.4 3507-05-FD-1002, 1003, 1004 Sultan
4/28/2018 Unit 35 Pipe Supports Footings 0.6 3206-03-FD-1003 Sultan
4/28/2018 Unit 35 Pipe Supports Pedetsals 2.1 3206-03-1001, 1002; 3206-01-FD-1013, 1017 Sultan
4/29/2018 Duct Banks 5.54 TDB-075 Parteek
4/29/2018 KMCR 5 Staircase No-3, Stairtower Columns, DH tie beam Jena
4/29/2018 SS-3 1 SS-3 Dog House Precast Slabs- 3 No.s Joey
4/29/2018 3405-01-PL-04 Footings 7.06 2 No.s Rama Shankar
4/29/2018 3306-03/06-SS-01 Footings 4.11 2 No.s Sundar Murthy
4/29/2018 Unit 43 Pipe Supports Footings 7.37 3306-03-FD-1001, 1002; 3306-06-FD-1001, 1002 Sundar Murthy
4/29/2018 Unit 87 Pipe Supports Pedestals 6.54 3507-01-FD-1004, 1005, 3014, 3015; Sultan
4/30/2018 Duct Banks RCC 7 EDB-318 Parteek
Dog House Precast Slab(DH- 1,4,8,9,10); 54 No.s Precast
4/30/2018 SS3 RCC 4 Fdns(500*500*225) Joey
4/30/2018 3504-12-SS-02/03 PCC 1 No. Sundar Murthy
4/30/2018 3504-12-PL-02 PCC 6 No.s Sundar Murthy
5/1/2018 3405-01-SU-02 Pedestals 3.2 10 No.s Rama Shankar
5/1/2018 3405-02-SU-01 Pedestals 1.2 4 No.s Rama Shankar
5/1/2018 A-8371 Footing 27 Sundar Murthy
5/1/2018 3401-03-SS-01 PCC 4 No.s
5/1/2018 A-4401 Footing 15.07 Sultan
5/1/2018 A-4501 Footing 10.35 Sultan
5/1/2018 T-3501 Dyke Wall 11 Sultan
5/2/2018 STG RCC 9 Stiffener Beam/ Dog House Jena
5/2/2018 Telecom Tower RCC 80 Jena
5/2/2018 3306-06-SU-01 Pedestal 2 Sundar Murthy
5/2/2018 3306-01/04-SS-01 Pedestal 4 Sundar Murthy
5/2/2018 Unit 87 Pipe Supports Pedestal 1.04 3507-02-FD-1001, 1008, 1009, 1010, 1012, 1013 Sultan
5/2/2018 Unit 35 Pipe Supports Pedestal 3.37 3206-06-FD-1001, 1004, 1006, 1007 Sultan
5/3/2018 3401-03-SS-01 Footing 18 Rama Shankar
5/3/2018 3504-12-SS-02/03 Footing 2.07 Sundar Murthy
5/3/2018 3504-12-SS-01 Footing 41.74 Sundar Murthy
5/3/2018 A-8361 Pedestal 7 Sundar Murthy
5/3/2018 Duct Banks 73.6 Parteek
5/4/2018 K-4801 A/B Footings 3 Rama Shankar
5/4/2018 T-3501 Dyke Wall 17 Sultan
5/5/2018 3405-03-PL-01 Pedestal 2.72 Rama Shankar
5/5/2018 3206-08-PL-01 to 03 Pedestal 1.43 Sultan
5/5/2018 k-4301/4351 Footing 48 Sundar Murthy
5/5/2018 A-4910 Footing 33.31 Sultan
5/5/2018 Unit 48 Pipe Supports Pedestal 3.28 3405-01-FD-1002, 1004 Rama Shankar
5/5/2018 Unit 35 Pipe Supports Pedestal 3.57 3206-08-FD-1050, 1051 Sultan
5/6/2018 3406-12-SU-02 Pedestal 9.13 Rama Shankar
5/6/2018 T-3501 Dyke Wall 11 Sultan
5/6/2018 3402-06-PL-08 to 10 Footing 13.66 Sultan
5/6/2018 KMCR Lintel 2 Jena
5/6/2018 SS-1 Lintel 3 Jena
5/6/2018 STG Lintel 2 Jena
5/6/2018 SS-2 Staircase 5.5 Ravi
5/7/2018 3601-01-SU-01 Pedestal 12 Sundar Murthy
5/7/2018 Unit 35 Pipe Supports Pedestal 5 3206-01-FD-1015, 3206-03-FD-1003 Sultan
5/7/2018 Unit 49 Pipe Supports Footing 9 3406-06-FD-1004, 1005, 1006, 1008, 1009, 1012 Sultan
5/7/2018 SS-2 Bus Duct Fdn 2.5 Ravi
5/8/2018 KMCR Roof Foundation 0.5 Jena
5/8/2018 STG Roof Foundation 3.5 Jena
5/8/2018 Duct Bank 15.76 EDB-194 Parteek
5/8/2018 T-4910, 4911, 4912 Dyke Wall 21 Sultan
5/8/2018 K-4301 Footing 32 Sundar Murthy
5/8/2018 A-8381 Footing 4 Sundar Murthy
5/8/2018 Unit 24 Culvert 31 Rama Shankar
5/9/2018 Duct Bank 15.76 EDB-203 Parteek
5/9/2018 Telecom Building Footing 9.5 Jena
5/9/2018 V-4502 A/B/C Pedestal 1.18 Rama Shankar
5/9/2018 A-8361 29 Sundar Murthy
5/9/2018 3406-12-SU-01 Footing 9.82 Rama Shankar
5/10/2018 3401-03-SS-01 Footing 15 Rama Shankar
5/10/2018 3407-02-PL-01 Pedestal 6.47 Sultan
5/10/2018 T-3501 Dyke Wall 15 Sultan
5/11/2018 Duct Bank 39.86 TDB-070, 071; IDB-027 Parteek
5/12/2018 STG Roof Foundation 5.5 Jena
5/12/2018 E-4902 A/B Foundation 21.94 Rama Shankar
5/12/2018 A-8361/A-8371 26 Sundar Murthy
5/13/2018 A-8381 Pedestal 1.76 Sundar Murthy
5/13/2018 T-3501 Dyke Wall 9 Sultan
5/13/2018 3401-03-SS-01 PCC Rama Shankar
5/13/2018 P-4802 A/B PCC Rama Shankar
5/13/2018 P-4804 A/B PCC Rama Shankar
5/13/2018 3306-03-PL-01 PCC Sundar Murthy
5/13/2018 3306-06-PL-01 PCC Sundar Murthy
5/13/2018 SS-2 Transformer Fdns NER RCC 3.96 3102-02-FD-077, 087, 093; Ravi
5/13/2018 KMCR RCC 4 Dog House Precast Slab/ Precast Fdns Jena
5/14/2018 3504-12-PL-04 Pedestal 11.2 Sundar Murthy
5/14/2018 3504-12-PL-02 Footing 8.65 Sundar Murthy
5/14/2018 3402-06-PL-01 to 03 Footing 5.5 Sultan
5/14/2018 Unit 44 Pipe Supports Footings 4.4 3407-06-FD-1002, 1004, 1005, 1006, 1008 Sultan
5/15/2018 SS-3 Transformer Foundation Footing 13.4 3102-03-FD-081, 080, 086, 087 Joey
5/15/2018 SS-3 Roof 2.1 DH- 02 & 05 Slab Joey
5/15/2018 3306-03-PL-01/ 3306-06-PL-01 Footing 6.87 3 No.s Sundar Murthy
5/15/2018 A-8371 Footing 12.5 Sundar Murthy
5/15/2018 3504-12-SS-01 Footing 13.76 F3 Sundar Murthy
5/15/2018 3504-12-PL-04 Footing 0.6 F3- 2 No.s Sundar Murthy
5/15/2018 3405-04-PL-03 Pedestal 4.01 All Pedestal Rama Shankar
5/15/2018 Unit 48 Pipe Supports Pedestal 0.84 3405-04-FD-1006 Rama Shankar
5/15/2018 3407-06-PL-01 to 04 Pedestal 5 8 No.s Sultan
5/15/2018 T-3501 Dyke Wall 6.5 Sultan
5/16/2018 3401-03-SS-01 Footings 19.7 11 No.s Rama Shankar
5/17/2018 K-4351 RCC 34 Lube Oil Skid Sundar Murthy
5/17/2018 3306-03/06-PL-01 Footings 6.8 Sundar Murthy
5/17/2018 V-4602 A/B/C Pedetsals 0.9 Rama Shankar
5/17/2018 Instrument Pipe Supports Footings 0.6 3507-03-FD-6926, 6927 Sultan
5/18/2018 STG RCC 5 Roof Foundations/ Stiffener Beam Jena
5/19/2018 P-4801 A/B Footing 8 Rama Shankar
5/19/2018 P-4802 A/B Footing 6.64 Rama Shankar
5/19/2018 P-4804 A/B Footing 8 Rama Shankar
5/19/2018 A-4801 Footing 10.12 Rama Shankar
5/19/2018 3601-01-SU-01 Pedetsals 20.11 Sundar Murthy
5/19/2018 P-4501 4.09 Sultan
5/19/2018 P-4504 2.47 Sultan
5/20/2018 A-8361 Pedetsals 3.86 Sundar Murthy
5/20/2018 3504-12-PL-04 2.34 Sundar Murthy
5/20/2018 T-3501 Dyke Wall 14.9 Sultan
5/20/2018 SS-2 3.8 Dog House Precast Slabs Ravi
5/21/2018 A-8371 Pedetsals 10.76 Sundar Murthy
5/21/2018 K-4801 A/B Pedestals 2.12 8 No.s Rama Shankar
5/21/2018 Unit 87 Pipe Supports Footings 2.7 3501-03-FD-1001, 1002, 3507-03-FD-3010 Sultan
5/22/2018 Duct Banks 10.29 EDB-193 Parteek
5/22/2018 E-4903 Pedestals 0.47 1 No. Rama Shankar
5/22/2018 3406-13-TS-01/ 3406-12-SU-01 Pedestals 3.33 3 No.s Rama Shankar
5/22/2018 A-2410 8 Rama Shankar
5/22/2018 3401-03-SS-01 10.535 6 No.s Rama Shankar
5/22/2018 Instrument Pipe Supports 0.49 3507-03-FD-6926, 6927 Sultan
5/23/2018 KMCR Staircase 5 Staircase No- 4 Jena
5/23/2018 Telecom Tower Pedestals 13.5 4 No.s Jena
5/23/2018 3504-13-PL-01 Pedestals 4.63 9 No.s Sundar Murthy
5/23/2018 3504-13-CR-01 Pedestals 1.3 3 No.s Sundar Murthy
5/23/2018 A-8361/A-8371 Footing 19.16 F-10 Sundar Murthy
5/23/2018 3504-12-PL-01 Footing 3.05 F1, F2 Sundar Murthy
5/23/2018 T-3501 Dyke Wall 20 Wall/Raf Sultan
5/23/2018 3405-01-PL-04 Pedetsals 2.65 6 No.s Rama Shankar
5/24/2018 A-8361/A-8371 Footings 5.13 F2- 2 No.s Sundar Murthy
5/24/2018 3306-01-SS-01 Pedestals 3.97 6 No.s Sundar Murthy
5/24/2018 SS-3 Transformer Fdn Footings 12.6 3102-03-FD-082, 083, 084, 085 Joey
5/24/2018 SS-2 Transformer Fdn Raf 14 3102-02-FD-088 Ravi
5/24/2018 SS-2 4 stair tower Ravi
5/24/2018 Duct Bank 8.07 TDB-012 Parteek
3407-06-1015, 1016, 1020, 1021, 1027, 1028, 1041, 1040,
5/25/2018 Unit 44 Pipe Supports Footings 13.86 1043, 1045, 3029, 3004, 3017, 3042 Sultan
5/26/2018 3407-06-PL-01 to 04 Pedestals 4.95 8 No.s Sultan
5/26/2018 A-8361/A-8371 Pedetsals 3.86 4 No.s Sundar Murthy
5/26/2018 SS-2 Transformer Fdns Raf 17 K-4351 Ravi
5/26/2018 KMCR 6 Stair tower flight, STG Precast Pedestal Jena
5/27/2018 Duct Banks 25.85 EDB-197; IDB-030 Parteek
5/27/2018 Culvert 14 Wall 1st lif Rajender
5/27/2018 3306-03-SU-01 5.78 F1- 1 No.; F2- 1 No. Sundar Murthy
5/27/2018 3306-06-SU-01 5.78 F1- 1 No.; F2- 1 No. Sundar Murthy
5/27/2018 Unit 44 Pipe Supports Pedestals 2.56 3407-01-FD-1002, 1004, 1005, 1006, 1008 Sultan
5/28/2018 3404-01-SS-01 Footings 11.08 9 No.s Sultan
5/29/2018 K-4351 9.86 Drain Block Skid Sundar Murthy
5/29/2018 3306-03/06-SS-01 Pedestals 2.16 5 No.s Sundar Murthy
5/29/2018 Unit 43 Pipe Supports Pedestals 2.82 3306-03-FD-1001, 1002; Sundar Murthy
5/29/2018 T-3501 Dyke Wall 18 Sultan
5/30/2018 SS-2 Transformer Fdn Foundation 17.75 G-25203-Tx to G-25208-TX Ravi
5/30/2018 SS-2 Transformer Fdn Wall 9.5 K-4301- TX Ravi
5/30/2018 Telecom Building Grade Beam 5.5 Grade Beam Jena
5/30/2018 Duct Bank 3.9 EDB-139 Parteek
5/30/2018 STG 2 Stiffener Beam Jena
5/30/2018 K-4301 9.86 Drain Block Skid Sundar Murthy
5/30/2018 K-4301 Pedestals 12.06 10 No.s (Export Gas Comp. Air Oil Cooler) Sundar Murthy
5/31/2018 Duct Banks 33.62 EDB-172, 192 Parteek
5/31/2018 KMCR 2.5 Stair tower Columns Jena
5/31/2018 3306-03-PL-01 Pedestals 3.2 5 No.s Sundar Murthy
5/31/2018 3306-03-SU-01/ 3306-03-PL-01 Pedestals 3.46 2 No.s Sundar Murthy
3206-01-FD-1007, 1010, 1011, 1018, 1019, 1020, 1021,
5/31/2018 Unit 35 Pipe Supports Footings 11.2 1022, 1023, 1025, 1026 Sultan
5/31/2018 3101-52-SS-01 Footings 2.99 F1- 1 No.; F2- 1 No. Rajender
6/2/2018 A-8361/A-8371 Pedetsals 8.36 8 No.s on F2 Sundar Murthy
6/2/2018 3402-06-PL-08 to 10 Pedestals 8.2 All Pedestal Sultan
6/2/2018 T-3501 Dyke Wall 18 Sultan
6/3/2018 Unit 49 Pipe Supports Pedestals 8.12 3406-12-FD -1111, 1112, 1121, 1151, 1161, 1152 Rajender
6/3/2018 3306-06-SS-01 Pedestals 2.16 P1- 4 No.s, PS1- 1 No. Sundar Murthy
6/3/2018 Unit 43 Pipe SUpports Pedestals 4.9 3306-06-FD-1001, 1002; 3306-03-FD Sundar Murthy
6/3/2018 BA Building Precast Pedestals 2.2 Jena
6/4/2018 SS-4 Roof Pedestals 24.2 6 No.s Jena
6/4/2018 P-4901 A/B Footings 4.86 Raf Rajender
6/4/2018 P-4902 A/B Footings 4 Raf Rajender
6/4/2018 3101-52-SS-01 Pedestals 3 10 No.s Rajender
6/4/2018 3401-03-SS-01 Pedestals 2.75 3 No.s Rajender
6/4/2018 Unit 45 Pipe Supports Pedestals 5.8 3402-06-FD-1001, 1004, 1005, 1008, 1009, 1012 Sultan
6/4/2018 Unit 44 Pipe Supports Footings 2.8 3407-06-FD-1007, 1008, 1041 Sultan
6/4/2018 K-4351 Pedestals 11.9 10 Pedestals(Export Gas Comp. Air oil cooler) Sundar Murthy
6/4/2018 3306-06-PL-01 Pedestals 3.28 5 No.s Sundar Murthy
6/5/2018 A-2410 Pedestals 10.38 All Pedestals Rajender
6/5/2018 3504-12-SS-01 Pedestals 18.51 All Pedestals Sundar Murthy
6/6/2018 Unit 89 Pipe Supports Footings 6 3508-01-FD-1003, 1006, 1007, 1008, 1009, 1010, 1011 Sundar Murthy
6/6/2018 Unit 44 Pipe Supports Pedestals 6.2 3407-06-FD-1027, 3029, 3042 Sultan
6/6/2018 SS-4 Roof Pedestals 9.6 P1- 2 No., P3- 1 No., P7- 1 No Jena
6/6/2018 STG 4 Door Lintel, Stiffener Beam D2A - 2 No.s, 3 No.s stiff Jena
6/7/2018 KMCR Stair tower 6.9 2 flights incl. landing lvl 106.025 to 109.565 Jena
6/7/2018 Duct Banks 17.54 EDB- 051, 052 Parteek
6/7/2018 P-4910 A/B Footings 9 Rajender
6/7/2018 P-4915 A/B Footings 10.5 Rajender
3504-13-FD-1201, 1203, 1212, 1213, 1219, 1232, 1301,
6/7/2018 Unit 83 Pipe Supports Footings 19.66 1303, 1312, 1313, 1319, 1332 Sundar Murthy
6/7/2018 T-3501 Dyke Wall 12 Sultan
6/7/2018 Unit 44 Pipe Supports Pedestals 3.76 3407-06-FD-1015, 1020, 1026, 1040, 1049, 1021, 1045 Sultan
6/8/2018 SS-2 Wall 10.11 K-4301- TX Wall Ravi
6/8/2018 Duct Banks 5.02 EDB-276, TDB-105 Parteek
6/8/2018 Unit 44 Pipe Supports Footings 5.76 3407-06-FD-1001, 1003, 3004, 1014 Sultan
6/9/2018 K-4801 A/B Footings 19.57 Incineration Air Blower LO. System Rajender
6/9/2018 3504-12-SU-01 4.91 All Pedestals Sundar Murthy
6/9/2018 Unit 44 Pipe Supports 6.8 3407-06-FD-1015, 1020, 1021, 1026, 1040, 1045, 1049 Sultan
6/10/2018 3405-01-PL-06 & 07 Footings 11.33 10 No.s Rajender
6/10/2018 3504-12-SS-03 Pedestals 5.02 8 No.s Sundar Murthy
6/11/2018 Duct Bank 7.31 EDB-202 Parteek
6/11/2018 P-4901 A/B Pedestal 3.54 Pedestal Rajender
6/11/2018 P-4902 A/B Pedestal 6 Pedestal Rajender
6/11/2018 Unit 35 Pipe Supports Footings 3206-01-FD-1012 Sultan
4.46
6/11/2018 Unit 35 Pipe Supports Pedestal 3206-01-FD-1020,1021, 1025, 1026 Sultan
6/12/2018 BA Building Roof Pedestals 14 P1, P2 - 1 No.s Jena
6/12/2018 Unit 89 Pipe Supports Foundation 3508-01-FD-1013 Sundar Murthy
8
6/12/2018 Unit 89 Pipe Supports Pedestals 3508-01-FD-1003, 1006, 1007, 1008, 1009, 1010, 1011 Sundar Murthy
6/13/2018 STG 2.6 Stiffener Beam, Door Lintel Jena
6/13/2018 BA Building 0.5 Precast Pedestals Jena
6/13/2018 SS-2 Footing 5.91 G-25209-TX, G-25210-TX Ravi
6/13/2018 A-8381 Footing 3.46 NER STG Package Sundar Murthy
6/13/2018 P-4403 A/B Footing 7.9 Sultan
6/13/2018 T-3501 Dyke Wall 12 Dyke Wall Sultan
6/13/2018 Unit 35 Pipe Supports Pedestals 4.5 3206-01-FD-1007, 1010, 1011, 1018, 1019, 1022 Sultan
3508-01-FD-1002, 1004, 1005, 1012, 1013, 1014, 1017,
6/14/2018 Unit 89 Pipe Supports Footings 7.64 1018, 1022 Sundar Murthy
6/17/2018 Duct Bank 33 EDB- 358, 359 Parteek
6/17/2018 STG 1.2 Mechanical Opening, Door Lintel Jena
6/17/2018 3504-12-PL-01 Pedestals 0.4528 2 No.s Sundar Murthy
6/17/2018 3504-12-PL-05 Pedestals 4.23 4 No.s Sundar Murthy
6/17/2018 3504-12-PL-03 Pedestals 7.84 7 No.s Sundar Murthy
6/17/2018 Unit 89 Pipe Supports Pedestals 4.96 3508-01-FD-1019 Sundar Murthy
6/17/2018 Unit 44 Pipe Supports Pedestals 3.88 3407-06-FD-1007, 1041, 1048 Sultan
6/17/2018 3406-09-PL-02 Pedetsals 1.4 4 No.s Sultan
6/17/2018 3405-01-PL-06 & 07 Pedestals 4.41 10 No.s Rajender
6/18/2018 3405-01-SU-01 13 Sundar Murthy
6/18/2018 P-4903 A/B 5.27 Raf for both footings Rajender
6/19/2018 BA Building Pedestals 7 Roof Pedestals - 3 No.s Jena
6/19/2018 KMCR Footing 1.1 Staircase - 1 Raf Jena
6/19/2018 STG 0.9 Stiffener Beam Jena
6/19/2018 SS-3 Bus Duct Fdn 2.4 3102-03-FD-092 to 099 Footing Joey
6/19/2018 SS-3 3.2 Dog House Precast Slab Joey
6/19/2018 3504-12-PL-03 Pedestals 13.5 10 No.s Sundar Murthy
6/19/2018 Unit 87 Pipe Supports Pedestals 3.96 3507-03-FD-1001, 1002, 3011 Sultan
6/20/2018 Duct Banks 38.12 EDB-357, TDB-074 Parteek
6/20/2018 SS-4 9.5 Parapet Wall Jena
6/20/2018 SS-2 Transformer Fdn 13.59 K-4301/K-4351 Inside Fdn Ravi
6/20/2018 Unit 49 Pipe Supports 2.76 3406-12-FD-1179, 1179A, 1189, 1189A Rajender
6/20/2018 P-2415 1.78 Footing Rajender
6/20/2018 P-4402 A/B 31.72 2 No.s Sultan
6/20/2018 Unit 35 Pipe Supports Footing 1.4 3206-04-FD-1001, 3206-08-FD-1049 Sultan
6/20/2018 3504-12-PL-01 5.24 7 No.s Sundar Murthy
6/20/2018 3504-12-SS-02/03 2.5 5 Pedestals Sundar Murthy
6/20/2018 3504-12-PL-03 1.1 1 Pedestal Sundar Murthy
6/21/2018 P-4903 A/B Pedestals 6.65 2 No.s Rajender
6/21/2018 Unit 49 Pipe Supports Pedestals 7.44 3406-12-FD-1111, 1112, 1121, 1152, 1151, 1161 Rajender
6/21/2018 P-4401 A/B Footing 20.19 2 No.s Sultan
6/21/2018 Unit 35 Pipe Supports Pedestals 1.1 3206-01-FD-1012, 1023 Sultan
3508-01-FD-1001, 1002, 1004, 1005, 1012, 1013, 1017,
6/21/2018 Unit 89 Pipe Supports Pedestals 7.1 1018, 1022 Sundar Murthy
6/21/2018 Unit 35 Pipe Supports Footings 1.2 3206-04-FD-1001, 3206-08-FD-1049 Sultan
6/23/2018 Duct Bank 14.33 EDB-011 Parteek
6/23/2018 BA Building 4.86 Roof Pedestals/ Dog House Jena
6/23/2018 Culvert 17.5 3401-01-CULT-001 Rajender
6/23/2018 Unit 49 Pipe Supports 2.4 3406-12-FD-1196, 1197, 1198, 1199 Rajender
6/23/2018 3504-12-PL-06 & 07 7.69 Pedestals Sundar Murthy
6/23/2018 Unit 89 Pipe Supports Pedetsals 3.6 3508-01-FD-1001, 1014, 1015, 1016 Sundar Murthy
6/24/2018 3101-52-SS-01 Pedestals 3.8 8 No.s Rajender
6/24/2018 3405-01-SU-01 2.34 Pedestals Sundar Murthy
6/24/2018 SS-4 6.5 DH 1, 2, 3, 4, 5 Roof Pedestals Jena
6/24/2018 A-8361/A-8371 3.07 F16 - 4 No.s / Newly added Sundar Murthy
6/24/2018 T-4701 Dyke Wall 17.5 Dyke Wall Sultan
6/24/2018 Unit 83 Pipe Supports Footings 11 3504-13-FD-1226, 1227, 1326, 1327 Sundar Murthy
6/25/2018 Duct Bank 4.28 EDB-310 Parteek
6/25/2018 Bus Duct Support @ SS-2 Footings 0.6 3102-02-FD-108, 109 Ravi
6/25/2018 SS-2 1.2 Stair tower Ravi
6/25/2018 3102-52-SS-01 Pedestals 2.4 6 No.s Rajender
6/25/2018 3402-06-PL-01 to 03 Pedestals 2.02 11 No.s Sultan
6/25/2018 3402-06-PL-07 Pedestals 1.2 2 No.s Sultan
6/26/2018 Duct Bank 6.08 EDB-034 Parteek
3101-25-FD-1001, 1002, 1003, 1004, 1006, 1007, 1008,
6/26/2018 Unit 00 Pipe Supports Footings 5.04 1010, 1018, 1020 Sultan
6/26/2018 Unit 87 Pipe Supports Footings 0.6 3507-03-FD-3010 Sultan
6/26/2018 3504-12-PL-01 1.74 Sundar Murthy
6/26/2018 3504-12-PL-03 3.45 Sundar Murthy
6/27/2018 Duct Bank 2.98 TDB-106 Parteek
6/27/2018 KMCR 5.6 Staircase 1 Jena
6/27/2018 BA Building 0.3 RC Wall over Grade Beam Jena
6/27/2018 SS-4 14.4 Parapet Wall, Dog House Jena
6/27/2018 Unit 49 Pipe Supports Pedestal 2.1 3406-12-FD-1179, 1179A, 1189, 1189A Rajender
6/27/2018 3504-12-PL-02 Pedestals 15.35 All Pedestals Sundar Murthy
6/28/2018 BA Building 4.77 RC Wall over Grade Beam Jena
6/28/2018 3101-52-SS-01 Pedestals 2.9 6 No.s Rajender
3405-04-FD-1016, 3405-01-FD-1018, 1019, 1021, 1025,
6/28/2018 Unit 48 Pipe Supports Footings 3.4 1030, 1033, 1034 Rajender
6/28/2018 Unit 35 Pipe Supports Pedestals 1.1 3206-08-DD-1049; 3206-04-FD-1001 Sultan
6/29/2018 SS-3 2.56 Coping Beams for Dog House - 05 & 06 Joey
6/29/2018 Unit 83 Pipe Supports Pedestals 9.8 3504-13-FD-1212, 1232, 1201, 1219, 1213, 1203 Sundar Murthy
6/29/2018 3404-01-SS-01 5.62 Complete Sultan
6/30/2018 3101-52-SS-01 Pedestals 3.1 9 No.s Rajender
6/30/2018 Unit 49 Pipe Supports Pedestals 3.2 3406-12-FD-1196, 1197, 1198, 1199 Rajender
6/30/2018 T-4910, 4911, 4912 Raf 2.7 Sultan
6/30/2018 3402-06-PL-04 to 06 Footings 5.84 3 No.s Sultan
6/30/2018 3406-09-CR-01 Footing 0.35 1 No.s Sultan

7/1/2018 Unit 83 Pipe Supports Footing 8.5 3504-13-FD-1108, 1156, 1160, 1161, 3011, 1114, 3010, 1113, Sundar Murthy
7/2/2018 Unit 83 Pipe Supports Footing 10.3 3504-18-SU-01,3504-18-FD-1006,3504-18-FD-1010 Sundar Murthy
7/2/2018 Duct bank 10.18 EDB-266, IDB-095,TDB-068 Parteek
7/3/2018 Unit 44 Pipe Supports Pedestals 6.7 3407-06-FD-1001, 1003, 3004, 1014 & 3507-03-FD-3010 Sultan
7/3/2018 Unit 11, Valve Pit Footing 3.5 PIT-39 Bala

3502-02-FD-
1001,1002,1003,1004,1007,1009,1010,1011,1013,1014,101
7/4/2018 Unit 38, Pipe supports Footing 13 5,1071,1072 Sundar Murthy
7/4/2018 3101-52-SS-01 Pedestal 3.2 6 no.s Rajender
7/4/2018 3507-03-FD-3010 Pedestal 2.3 2 no.s Sultan
7/4/2018 STG Building Foundation 15.5 HV transformer Jena
7/4/2018 KMCR Building Column and tie beam 2.5 Stair tower Jena
7/4/2018 BA Building Column 1.5 Stair tower Jena
7/4/2018 Duct Bank 2.13 EDB 324 Parteek
7/4/2018 Duct Bank 3.08 TDB 077 Parteek
7/4/2018 Duct Bank 5.85 IDB 023 Parteek
7/5/2018 Unit -24 Wall 10 Culvet wall Rajender
7/5/2018 Unit-47 Raf 5 T-4701 Sultan
7/5/2018 Unit-83, Pipe Supports Pedestals 15.3 3504-13-FD-1312,1332,1319,1313,1301,1303 Sundar Murthy
7/5/2018 Unit-38, Pipe Supports Footings 9.2 3502-03-FD-1020,1021,1022,1023,1024,1026,1027,1029 Sundar Murthy
7/5/2018 Duct Bank 2.57 EDB-114 Parteek
7/5/2018 Duct Bank 6.32 TDB-011 Parteek
7/7/2018 Unit-38, Pipe Supports Footings 7.4 3502-03-FD-1042,1041,1031,1030,1025,1032 Sundar Murthy
7/7/2018 Unit-35, Pipe Supports Footings 1 3507-03-FD-1014, 3206-09-FD-1004 Sultan
7/7/2018 Duct Bank 2.27 EDB-354 Parteek
7/7/2018 Duct Bank 3.08 TDB-006 Parteek
7/7/2018 Duct Bank 5.85 IDB-012 Parteek
7/8/2018 Unit-24 Footing 12.2 Sulphur loading and unloading Rajender
3101-25-FD-1001, 1002, 1003, 1004,1005, 1006, 1007, 1008,
7/8/2018 Unit-00, Pipe Supports Pedestals 2.6 1010, 1018,1019, 1020 Sultan
7/8/2018 Unit-83, Pipe Supports Footings 7.7 3504-13-FD-3003,3004,1107,1003,1210 Sundar Murthy
7/8/2018 BA building Mullions 2 Mullions upto grade slab top Jena
7/9/2018 Unit-24 Wall 9.2 Culvet wall Rajender

3504-18-FD-
7/9/2018 Unit-83, Pipe Supports Footings 11.5 1002,1004,1005,1031,1033,1034,1037,1038,3504-18-TR-01 Sundar Murthy
7/9/2018 SS-2 Building Staircase 3 Stair Tower Flight -1 Ravi
7/10/2018 SS-4 LV Transformer 5 G 25401, 25402- TX Jena
7/10/2018 SS-4 Retaining Wall 3 Retaining Wall Fdn Jena
7/10/2018 SS-4 Roof Pedestals 3.8 P5 ; P4 ; P6 Jena
7/10/2018 Duct Banks 32.71 EDB-196, 244 ; TDB - 073 Parteek

7/10/2018 Unit 83 Pipe Supports Footings 5.76 3504-18-FD-1001, 1003, 1008, 1020, 1021, 1022, 1023, 1024 Sundar Murthy
7/10/2018 Valve Pit 4.2 3110-11-FWVP-32 Bala
7/11/2018 Telecom Building 3.24 Columns - 4 No.s Jena

7/11/2018 ` Footings 4.12 3405-04-FD-1004, 1014, 1020, 1021, 1023, 1024, 1025, 1026 Rajender
3407-01-FD-1001, 1032, 1012, 1013, 1025, 1016, 1009,
7/11/2018 Unit 44 Pipe Supports Footings 12.66 1010, 1011, 1018, 1015, 1020, 1022, 1023, 3021 Sultan
7/11/2018 Unit 38 Pipe Supports Footings 10.32 3502-03-FD-1016, 1017, 1018, 1019 Sundar Murthy
7/12/2018 3101-52-SS-01 Pedestals 4.9 10 No.s Rajender
7/13/2018 Duct Banks 48.76 EDB-360, 362 Parteek
7/14/2018 3101-52-SS-01 Pedestals 5 Rajender
7/14/2018 T-4701 8 Raf Sultan
7/14/2018 STG 12 G-83001-TX Wall Jena
7/14/2018 Pulling Pit 2.5 3110-05-TPP - 001/004 Jena
7/14/2018 KMCR 1.5 Dog House Coping Beam Jena
7/15/2018 Unit 24 13 Sulphur Blocking area Rajender
7/15/2018 3502-03-PL-01 to 04 9 Footings Sundar Murthy
7/16/2018 Duct Banks 22.76 EDB - 361; IDB - 013; TDB - 007 Parteek
7/16/2018 SS-2 5 Stair tower Ravi
3404-02-
7/17/2018 Unit 47 Pipe Supports Footings 7.12 1001,1002,1003,1004,1022,1023,1024,1025,1026,1005 Sultan
7/17/2018 3504-01-SS-01 Pedestals 0.76 2 No.s Sultan
7/17/2018 3406-09-CR-01 Pedestals 0.85 2 No.s Sultan
7/18/2018 Duct Bank 3.95 TDB - 008 Parteek
7/18/2018 3504-13-CR-01 Pedestals 1.99 4 No.s Sundar Murthy
7/18/2018 A-8361/A-8371 Pedestals 1.11 2 No.s Sundar Murthy

7/18/2018 Unit 83 Pipe Supports Pedestals 9.4 3504-13-FD- 1003, 3003, 3004, 1107, 1108, 1210, 1226, 1227 Sundar Murthy
3504-12-FD-1005, 1010, 1017, 1020, 3021, 1085, 1065,
7/18/2018 Unit 83 pipe Supports Footings 22.3 1083, 1064, 1035, 1041, 1037, 1033 Sundar Murthy
7/18/2018 Valve Pit 2.1 3110-09-FWVP-35 Rajender
7/19/2018 Duct Bank 21.08 EDB - 204, 205, 309, 311 Parteek
7/19/2018 Unit 24 9 Sulphur loading and unloading area Rajender
7/19/2018 Unit 83 Pipe Supports 3.5 3504-18-FD-1009, 1012, 1005, 1016, 1017, 1018, 1027 Sundar Murthy
7/19/2018 T-4910, 4911, 4912 7.5 Dyke Wall Sultan
7/19/2018 3407-09-CR-01 & 02 0.6 Footings Sultan
7/19/2018 Unit 44 Pipe Supports 2.916 3407-02-FD-1008, 1010, 1012 Sultan
7/20/2018 BA Building 22 Grade slab Jena
7/21/2018 BA Building 12 Grade slab Jena
7/21/2018 3101-52-SS-01 6 Pedestals Rajender
7/21/2018 Unit 83 Pipe Supports 3.2 3504-13-FD-1226, 1227 Gupta
7/21/2018 Unit 38 Pipe Supports 0.972 3502-03-FD-1057 Gupta
7/21/2018 STG 7.95 G - 83001 - TX Jena
7/22/2018 ELECTRICAL TRENCH TRNE-001 5 Part - 9 Ravi
7/22/2018 Unit 47 Pipe Supports Footings 4.5 3404-03-FD-1001, 1002, 1005, 1006, 1007, 1012, 1013 Sultan
3404-02-FD-1007, 1010, 1011, 1012, 1013, 1014, 1019,
7/22/2018 Unit 47 Pipe Supports Footings 5 1027, 1028 Sultan
7/22/2018 Unit 35 Pipe Supports Footings 2 3206-09-FD-1012, 1005 Sultan
7/22/2018 Unit 35 Pipe Supports Pedestal 0.6 3206-09-FD-1004 Sultan
7/22/2018 Unit 87 Pipe Supports Pedestal 0.6 3507-03-FD-1014 Sultan
7/22/2018 AC Drain Pit 1.32 3110-09-WMH-15 Sultan
3504-12-FD-1103, 1067, 1086, 1070, 3051, 1052, 1071,
7/23/2018 Unit 83 Pipe Supports Footings 26.5 1053, 3050, 1080, 1081, 1061, 1101, 1102, 1062 Gupta
7/23/2018 SS-2 4.64 Stair tower Ravi
7/23/2018 BA Building 5 Stair tower Jena
7/23/2018 BA Building 1 Roof Pedestals Jena
7/23/2018 SS-3 2.89 NER 3102-03-FD-090, 091 Joey
7/23/2018 SS-3 Pedestals 1.51 3102-03-FD-092 to 099 Joey
7/23/2018 SS-3 3.1 Coping Beam Dog House Joey
7/23/2018 Duct Banks 14.91 EDB - 348 ; 312 ; 029 Parteek
7/24/2018 Unit 48 Pipe Supports Pedestal 2.8 3405-01-FD-1019, 1021, 1025, 1030, 1033, 1034 Rajender
7/24/2018 Unit 48 Pipe Supports Footings 1 3405-04-FD-1016, 1017 Rajender
7/24/2018 3405-04-PL-05 Footings 0.864 2 No.s Rajender
7/24/2018 Unit 48 Pipe Supports Footings 1.9 3405-01-FD-1018, 1022, 1027, 1033 Rajender
7/24/2018 Valve Pit Wall 7.1 3110-11-FWVP-039 Sultan
7/25/2018 Duct Bank 10.33 IDB - 029 Parteek
7/25/2018 Unit 24 Raf 11 Sulphur Loading & Unloading area Rajender
7/25/2018 3402-06-PL-04 to 06 Pedestals 2.85 All Pedestals Sultan
3502-03-FD-1033, 1034, 1035, 1036, 1043, 1044, 1045,
7/25/2018 Unit 38 Pipe Supports Footings 7.5 1046, 1047, 1048 Gupta
3502-03-FD-PL5-02,03,04,06, 3502-03-FD-PL 8-01,02,03,04,
7/25/2018 Unit 38 Pipe Supports Footings 6.5 3502-03-FD-PL9-01,02,03 Gupta
7/26/2018 Unit 38 Pipe Supports Pedestals 6.5 3502-03-FD-1010, 1011, 1013, 1014, 1015, 1016 Gupta
7/28/2018 Unit 48 pipe Supports 4 3405-04-FD-3001, 1013 Rajender
7/28/2018 Unit 83 Pipe Supports Pedestals 6 3504-12-FD-1064, 1065, 1083, 1085 Gupta
7/28/2018 Duct Banks 11.55 EDB - 255, 256, 278 Parteek
7/28/2018 SS-2 4.8 Stair tower Ravi
7/29/2018 Culvert Top Slab 18.5 3401-01-CULT-001 Rajender
7/29/2018 Unit 44 Pipe Supports Footings 10.5 3407-02-FD-1001,1002, 1003, 1004, 1005, 1006, 1016 Sultan

7/29/2018 Unit 38 Pipe Supports Pedestals 5.64 3502-03-FD-1001, 1002, 1003, 1004, 1007, 1009, 1071, 1072 Gupta
7/29/2018 3502-03-PL-01 to 04 Pedestals 1.565 4 No.s Gupta
7/29/2018 Unit 43 Pipe SUpports Footings 5.012 3306-07-FD-1002, 1003 Gupta
7/29/2018 Unit 38 Pipe Supports Footings 1.05 3502-02-FD-1001, 1004, 1005 Gupta
7/29/2018 Unit 38 Pipe Supports Footings 2.41 3502-01-FD- 1004, 1008, 1009, 1010, 1011, 1020 Gupta

Total 238.06