You are on page 1of 22

Sr. No.

Description Cu Conductor Symbol

1 Main earth grid conductor (around Substation) 120 Sq.mm, Bare E1

2 Plant Main Earthing Grid (Tank farm) 70 Sq.mm, Bare E2

Jetty Main Earth Grid

To metallic enclosures of HV electrical equipment


3 70 Sq.mm, Cable E3
To metallic enclosures of LV electrical equipment having a supply
cable with cross section 35Sq.mm and above.

lighting down conductor (From testlink Box to grid)

To metallic enclosures of LV electrical equipment having a supply


4 35 Sq.mm, Cable E4
cable with cross section between 6 Sq.mm to 35Sq.mm
To Structures, tanks, process plant equipment and other non-electrical
5 16 Sq.mm, Cable E5
equipment
To metallic enclosures of LV electrical equipment having a supply
cable with cross section between 6 Sq.mm or less
6 6 Sq.mm, Cable E6
To Safety Shower, Cable Tray Bonding, Pipe Bonding,
Stairway/Platform, Fence
7 lighting down conductor (From Air Terminal to testlink Box) 25 x 3 Al Strip E7
Margin 10%

TANK FARM

300 Sq.mm Bare Conductor 0


120 Sq.mm PVC Cable
70 Sq.mm PVC Cable 5190
35 Sq.mm PVC Cable 1919
6 Sq.mm PVC Cable 1121
0
EARTH bus bar - Ele. : 300(L) X100(W) X 6(T) 2
Earth Pit 114
EARTH ROD : Electrical 171
PUMP ST Lgt, CCTV & SUBSTATION Grand Total Unit
STATION FENCE

0 0 258 258 meter


0
312 2319 7821 meter
315 365 2598 meter
376 0 1497 meter
0 0 0
3 0 5 Nos
10 124 Nos
15 186 Nos
TANKFARM
Earth Conductor TYPE APPILICATION FORMULA Qty final Unit
70 Sq.mm PVC Cable Around tankfarm Inside Tank Farm 3843 5190 m
Trench (with pump station) 891

70 Sq.mm PVC Cable Cable ladder/Cable Tray 0 m


Cable Tray (Tank Lighting) 0

70 Sq.mm PVC Cable Tank Earthing No of Tanks 228 m


5 Connection 1 No of Tank x No of Connection (5) x 2m 10
4 Connection 19 No of Tank x No of Connection (4) x 2m 152
3 Connection 7 No of Tank x No of Connection (3) x 2m 42
2 Connection 6 No of Tank x No of Connection (2) x 2m 24

35 Sq.mm PVC Cable Distribtuion Board 13 No of DB x 2 x 5m 130 1918.5 m

35 Sq.mm PVC Cable Electrical Tray Bonding 2649 @ Every 3 m x 2 x 0.25 m 1324.5 m

Cross Over Platform 66 No of Cross Over Platform x 2 x 3m 396


Operating Platform 33 No of Operating Platform x 2 x 3m 198
35 Sq.mm PVC Cable Pipe Rack Length of line / Tray m
Pipe Earthing @ Every 30 m * 10 m 0

6 Sq.mm PVC Cable MOV Earthing (Tank) 224 No of MOV x 3m 672 1121 m

6 Sq.mm PVC Cable Earth of Fixtures on Tank (staircase lighting) No of Tanks m


Dia : 47.5 m & Height : 27.5 m 1 No of Tank x No of Fixtures (5 nos) x 1 m 5
Dia : 39 m & Height : 27.5 m 11 No of Tank x No of Fixtures (5 nos) x 1 m 55
Dia : 32 m & Height : 27.5 m 8 No of Tank x No of Fixtures (5 nos) x 1 m 40
Dia : 23 m & Height : 27.5 m 5 No of Tank x No of Fixtures (4 nos) x 1 m 20
Dia : 26 m & Height : 27.5 m 2 No of Tank x No of Fixtures (4 nos) x 1 m 8
Dia : 18 m & Height : 27.5 m 6 No of Tank x No of Fixtures (4 nos) x 1 m 24

6 Sq.mm PVC Cable Stair Case & 2.5 m Lighting pole No of Platform/Stair/Pole m
2.5 m Lighting pole (mov lighting pole) 33 No of Pole x 3m 99
2.5 m Lighting pole (platform lighting pole) 66 No of Pole x 3m 198
6 Sq.mm PVC Cable Static Earthing Length of line / Tray 0 m
Pipe Bonding @ Every 30 m * 10 m 0

EARTH bus bar - Ele. : 300(L) 300(L) X100(W) X 6(T) 2 2 2 nos


X100(W) X 100(T)

Earth Pit No of Platform Earth Pit 114 nos

EARTH ROD : Electrical 19∅mm, 1.5mm length 171 m


PUMPSTATION
Earth Conductor TYPE APPILICATION FORMULA Qty final Unit
70 Sq.mm PVC Cable Main Earth Gird Around Pump Station 182 312 m

70 Sq.mm PVC Cable MV Motor Earthing 13 No of Equipments x 2 x 5m 130 m

70 Sq.mm PVC Cable Earth Grid for MOV, Fixtures platform Inside Pump Station 0 m

35 Sq.mm PVC Cable Self Protected Lighting pole No of Platform/Stair/Pole 315 m


8 m Lighitng pole 12 No of Pole x 3m 36

35 Sq.mm PVC Cable Pipe Rack Length of line / Tray m


Pipe Earthing 1244 @ Every 30 m * 10 m 75
35 Sq.mm PVC Cable Static Earthing Length of line / Tray m
Electrical Tray Bonding 143 @ Every 3 m x 2 x 0.25 m 24
35 Sq.mm PVC Cable LV Motor 18 No of Equipments x 2 x 5m 180 m

6 Sq.mm PVC Cable MOV Earthing 112 No of MOV x 2m 224 376 m

6 Sq.mm PVC Cable Stair Case & 2.5 m Lighting pole No of Platform/Stair/Pole m
Operating Platform 5 No of Operating Platform x 2 x 3m 30
2.5 m Lighitng pole 20 No of Pole x 3m 60

6 Sq.mm PVC Cable RCU Earthing 31 No of RCU x 2m 62 m

EARTH bus bar - Ele. : 300(L) 300(L) X100(W) X 6(T) 3 3 3 nos


X100(W) X 100(T)

Earth Pit No of Platform Earth Pit 10 nos

EARTH ROD : Electrical 19∅mm, 1.5mm length 15 nos


ST Lgt, CCTV & FENCE
Earth Conductor TYPE APPILICATION FORMULA Qty final Unit
70 Sq.mm PVC Cable Main Earth Gird street light Trench 2109 2319 m
Street Lighting
70 Sq.mm PVC Cable No of Pole m
8 m Lighitng pole 70 No of Pole x 3m 210
FENCE
35 Sq.mm PVC Cable Length of Fence 365 m
Fence 1095 @ Every 30 m 365
SUBSTATION (DSS)
300 Sq.mm Bare Conductor 183 258
SUBSTATION (MRSS)
300 Sq.mm Bare Conductor 75
SR NO DESCRIPTION FROM

1C X 240SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN MAIN EARTH GRID


1 EARTH GRID)

OVERALL SUB STATION


2 25mmL X 3mmT, Al STRIP BUILDING

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL GUARD HOUSE

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL GUARD HOUSE


6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,
lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL GUARD HOUSE

GUARD HOUSE
SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP OVERALL GUARD HOUSE

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL GUARD HOUSE

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL GUARD HOUSE

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL GUARD HOUSE

OFFICE BUILDING
SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP OVERALL OFFICE BUILDING


3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL OFFICE BUILDING

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL OFFICE BUILDING

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL OFFICE BUILDING

CONTROL ROOM
SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP OVERALL CONTROL ROOM

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL CONTROL ROOM

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL CONTROL ROOM

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL CONTROL ROOM

WORKSHOP
SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP OVERALL WORKSHOP

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL WORKSHOP

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL WORKSHOP

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL WORKSHOP

BISCYCLE PARK
SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP OVERALL WORKSHOP

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL WORKSHOP

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL WORKSHOP

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL WORKSHOP

CAR PARK
SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP OVERALL WORKSHOP

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL WORKSHOP

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL WORKSHOP

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL WORKSHOP

UTILITY :
FOAM TANK NEAR UTILTTY AREA
SR NO DESCRIPTION FROM
1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN
1 MAIN EARTH GRID
EARTH GRID)

OVERALL FOAM TANK NEAR


2 25mmL X 3mmT, Al STRIP TANKFRAM-4

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

OVERALL FOAM TANK NEAR


4 TEST LINK BOX TANKFRAM-4
OVERALL FOAM TANK NEAR
5
EARTH PIT INSPECTION CHAMBER (LIGHTNING) TANKFRAM-4

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
OVERALL FOAM TANK NEAR
7 AIR TERMINALS (16∅mm, 300mm Height) TANKFRAM-4

(NEAR) FOAM TANK NEAR UTILTTY A


SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

OVERALL FOAM TANK NEAR


2 25mmL X 3mmT, Al STRIP TANKFRAM-4

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

OVERALL FOAM TANK NEAR


4 TEST LINK BOX
TANKFRAM-4
OVERALL FOAM TANK NEAR
5
EARTH PIT INSPECTION CHAMBER (LIGHTNING) TANKFRAM-4

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
OVERALL FOAM TANK NEAR
7 AIR TERMINALS (16∅mm, 300mm Height) TANKFRAM-4

PW UNIT NEAR UTILTTY AREA


SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP OVERALL PW UNIT


3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL PW UNIT

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL PW UNIT

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL PW UNIT

N2 UNIT NEAR UTILTTY AREA


SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP OVERALL N2 UNIT

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL N2 UNIT

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL N2 UNIT

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL N2 UNIT

AIR COMPRESSOR
SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 EARTH GRID) MAIN EARTH GRID

2 25mmL X 3mmT, Al STRIP OVERALL AIR COMPRESSOR

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX OVERALL AIR COMPRESSOR

5 EARTH PIT INSPECTION CHAMBER (LIGHTNING) OVERALL AIR COMPRESSOR

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) OVERALL AIR COMPRESSOR

HOT OIL HEATING SYSTEM NEAR UTILTT


SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

OVERALL HOT OIL HEATING


2 25mmL X 3mmT, Al STRIP SYSTEM

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

OVERALL HOT OIL HEATING


4 TEST LINK BOX SYSTEM
OVERALL HOT OIL HEATING
5 SYSTEM
EARTH PIT INSPECTION CHAMBER (LIGHTNING)
6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,
lightining EARTH ROD LIGHTNING EARTH PIT
OVERALL HOT OIL HEATING
7 AIR TERMINALS (16∅mm, 300mm Height) SYSTEM

FOAM TANK NEAR TANKFRAM-4


SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

OVERALL FOAM TANK NEAR


2 25mmL X 3mmT, Al STRIP TANKFRAM-4

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

OVERALL FOAM TANK NEAR


4 TEST LINK BOX TANKFRAM-4
OVERALL FOAM TANK NEAR
5
EARTH PIT INSPECTION CHAMBER (LIGHTNING) TANKFRAM-4

6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,


lightining EARTH ROD LIGHTNING EARTH PIT
OVERALL FOAM TANK NEAR
7 AIR TERMINALS (16∅mm, 300mm Height) TANKFRAM-4

FIRE WATER PUMP STATION NEAR JET


SR NO DESCRIPTION FROM

1C X 70 SQ.mm Cu, BARE CONDUCTOR (PLANT MAIN


1 MAIN EARTH GRID
EARTH GRID)

2 25mmL X 3mmT, Al STRIP FIRE WATER PUMP STATION

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

4 TEST LINK BOX FIRE WATER PUMP STATION

5 FIRE WATER PUMP STATION


EARTH PIT INSPECTION CHAMBER (LIGHTNING)
6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,
lightining EARTH ROD LIGHTNING EARTH PIT
7 AIR TERMINALS (16∅mm, 300mm Height) FIRE WATER PUMP STATION

CONTAINER SUBSTATION NEAR JETTY 1 AN


SR NO DESCRIPTION FROM

1C X 240SQ.mm PVC CABLE (PLANT MAIN EARTH


1 MAIN EARTH GRID
GRID)

OVERALL FOAM TANK NEAR


2 25mmL X 3mmT, Al STRIP TANKFRAM-4

3 1C X 70SQ.mm Cu, PVC Cable (G/Y) TEST LINK BOX

OVERALL FOAM TANK NEAR


4 TEST LINK BOX TANKFRAM-4
OVERALL FOAM TANK NEAR
5 TANKFRAM-4
EARTH PIT INSPECTION CHAMBER (LIGHTNING)
6 (16∅mm, 1.5mm length) X 3 nos. of rod. , Cu,
lightining EARTH ROD LIGHTNING EARTH PIT
OVERALL FOAM TANK NEAR
7 AIR TERMINALS (16∅mm, 300mm Height) TANKFRAM-4
TO LENGTH (METER)

MAIN EARTH GRID 156

Perimeter of Building
OVERALL SUB STATION P=2x(W+L)+(HEIGHT OF BLDG X 692
BUILDING NO. OF DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 156
CABLE DISTENCE X TEST LINK BOX

OVERALL GUARD HOUSE Number of Down 31


conductors = P/15
OVERALL GUARD HOUSE 31
93
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL GUARD HOUSE 78
P=2x(W+L)/6 (every 6m)

GUARD HOUSE
TO LENGTH (METER)

MAIN EARTH GRID 10

Perimeter of Building
OVERALL GUARD HOUSE P=2x(W+L)+(HEIGHT X NO FO 32
DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 16
CABLE DISTENCE X TEST LINK BOX

OVERALL GUARD HOUSE Number of Down 2


conductors = P/15
OVERALL GUARD HOUSE 2

6
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL GUARD HOUSE 4
P=2x(W+L)/6

FFICE BUILDING
TO LENGTH (METER)

MAIN EARTH GRID 37

Perimeter of Building
OVERALL OFFICE BUILDING P=2x(W+L)+(HEIGHT X NO FO 187
DOWN CONDUCTOR
HEIGHT OF TESTLINK BOX + LEP
LEP 90
CABLE DISTENCE X TEST LINK BOX

OVERALL OFFICE BUILDING Number of Down 7


conductors = P/15
OVERALL OFFICE BUILDING 7

22
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL OFFICE BUILDING 19
P=2x(W+L)/6

ONTROL ROOM
TO LENGTH (METER)

MAIN EARTH GRID 31

Perimeter of Building
OVERALL CONTROL ROOM P=2x(W+L)+(HEIGHT X NO FO 157
DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 63
CABLE DISTENCE X TEST LINK BOX

OVERALL CONTROL ROOM Number of Down 6


conductors = P/15
OVERALL CONTROL ROOM 6

19
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL CONTROL ROOM 16
P=2x(W+L)/6

WORKSHOP
TO LENGTH (METER)

MAIN EARTH GRID 34

Perimeter of Building
OVERALL WORKSHOP P=2x(W+L)+(HEIGHT X NO FO 170
DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 68
CABLE DISTENCE X TEST LINK BOX

OVERALL WORKSHOP Number of Down 7


conductors = P/15
OVERALL WORKSHOP 7

20
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL WORKSHOP 17
P=2x(W+L)/6

ISCYCLE PARK
TO LENGTH (METER)

MAIN EARTH GRID 12

Perimeter of Building
OVERALL WORKSHOP P=2x(W+L)+(HEIGHT X NO FO 49
DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 25
CABLE DISTENCE X TEST LINK BOX

OVERALL WORKSHOP Number of Down 2


conductors = P/15
OVERALL WORKSHOP 2

7
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL WORKSHOP 6
P=2x(W+L)/6

CAR PARK
TO LENGTH (METER)

MAIN EARTH GRID 11

Perimeter of Building
OVERALL WORKSHOP P=2x(W+L)+(HEIGHT X NO FO 45
DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 22
CABLE DISTENCE X TEST LINK BOX

OVERALL WORKSHOP Number of Down 2


conductors = P/15
OVERALL WORKSHOP 2

7
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL WORKSHOP 6
P=2x(W+L)/6

NK NEAR UTILTTY AREA


TO LENGTH (METER)
MAIN EARTH GRID 32

Perimeter of Building
OVERALL FOAM TANK NEAR P=2x(W+L)+(HEIGHT X NO FO 74
TANKFRAM-4 DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 32
CABLE DISTENCE X TEST LINK BOX

OVERALL FOAM TANK NEAR Number of Down 3


TANKFRAM-4 conductors = P/15
OVERALL FOAM TANK NEAR 3
TANKFRAM-4

3
LIGHTNING EARTH PIT
OVERALL FOAM TANK NEAR Perimeter of Building 8
TANKFRAM-4 P=2x(W+L)/6

TANK NEAR UTILTTY AREA


TO LENGTH (METER)

MAIN EARTH GRID 21

Perimeter of Building
OVERALL FOAM TANK NEAR P=2x(W+L)+(HEIGHT X NO FO 47
TANKFRAM-4 DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 21
CABLE DISTENCE X TEST LINK BOX

OVERALL FOAM TANK NEAR Number of Down 2


TANKFRAM-4 conductors = P/15
OVERALL FOAM TANK NEAR 2
TANKFRAM-4

2
LIGHTNING EARTH PIT
OVERALL FOAM TANK NEAR Perimeter of Building 5
TANKFRAM-4 P=2x(W+L)/6

T NEAR UTILTTY AREA


TO LENGTH (METER)

MAIN EARTH GRID 28

Perimeter of Building
OVERALL PW UNIT P=2x(W+L)+(HEIGHT X NO FO 65
DOWN CONDUCTOR
HEIGHT OF TESTLINK BOX + LEP
LEP 28
CABLE DISTENCE X TEST LINK BOX

OVERALL PW UNIT Number of Down 3


conductors = P/15
OVERALL PW UNIT 3

3
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL PW UNIT 7
P=2x(W+L)/6

NEAR UTILTTY AREA


TO LENGTH (METER)

MAIN EARTH GRID 23

Perimeter of Building
OVERALL N2 UNIT P=2x(W+L)+(HEIGHT X NO FO 53
DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 23
CABLE DISTENCE X TEST LINK BOX

OVERALL N2 UNIT Number of Down 2


conductors = P/15
OVERALL N2 UNIT 2

2
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL N2 UNIT 6
P=2x(W+L)/6

R COMPRESSOR
TO LENGTH (METER)

MAIN EARTH GRID 21

Perimeter of Building
OVERALL AIR COMPRESSOR P=2x(W+L)+(HEIGHT X NO FO 47
DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 21
CABLE DISTENCE X TEST LINK BOX

OVERALL AIR COMPRESSOR Number of Down 2


conductors = P/15
OVERALL AIR COMPRESSOR 2

2
LIGHTNING EARTH PIT
Perimeter of Building
OVERALL AIR COMPRESSOR 5
P=2x(W+L)/6

G SYSTEM NEAR UTILTTY AREA


TO LENGTH (METER)

MAIN EARTH GRID 57

Perimeter of Building
OVERALL HOT OIL HEATING P=2x(W+L)+(HEIGHT X NO FO 132
SYSTEM DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 57
CABLE DISTENCE X TEST LINK BOX

OVERALL HOT OIL HEATING Number of Down 6


SYSTEM conductors = P/15
OVERALL HOT OIL HEATING
SYSTEM 6

6
LIGHTNING EARTH PIT
OVERALL HOT OIL HEATING Perimeter of Building 14
SYSTEM P=2x(W+L)/6

NK NEAR TANKFRAM-4
TO LENGTH (METER)

MAIN EARTH GRID 32

Perimeter of Building
OVERALL FOAM TANK NEAR P=2x(W+L)+(HEIGHT X NO FO 74
TANKFRAM-4 DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 32
CABLE DISTENCE X TEST LINK BOX

OVERALL FOAM TANK NEAR Number of Down 3


TANKFRAM-4 conductors = P/15
OVERALL FOAM TANK NEAR 3
TANKFRAM-4

3
LIGHTNING EARTH PIT
OVERALL FOAM TANK NEAR Perimeter of Building 8
TANKFRAM-4 P=2x(W+L)/6

UMP STATION NEAR JETTY 1


TO LENGTH (METER)

MAIN EARTH GRID 51

Perimeter of Building
FIRE WATER PUMP STATION P=2x(W+L)+(HEIGHT X NO FO 117
DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 51
CABLE DISTENCE X TEST LINK BOX

FIRE WATER PUMP STATION Number of Down 5


conductors = P/15
FIRE WATER PUMP STATION 5

5
LIGHTNING EARTH PIT
Perimeter of Building
FIRE WATER PUMP STATION 13
P=2x(W+L)/6

ATION NEAR JETTY 1 AND JETTY2


TO LENGTH (METER)

MAIN EARTH GRID 107

Perimeter of Building
OVERALL FOAM TANK NEAR P=2x(W+L)+(HEIGHT X NO FO 165
TANKFRAM-4 DOWN CONDUCTOR

HEIGHT OF TESTLINK BOX + LEP


LEP 107
CABLE DISTENCE X TEST LINK BOX

OVERALL FOAM TANK NEAR Number of Down 5


TANKFRAM-4 conductors = P/15
OVERALL FOAM TANK NEAR
TANKFRAM-4 11

11
LIGHTNING EARTH PIT
OVERALL FOAM TANK NEAR Perimeter of Building 13
TANKFRAM-4 P=2x(W+L)/6
LIGHTNING MTO (OVERALL)
Quantity
20%
Actual units
margin
1C X 240 Sq.mm Cu, BARE CONDUCTOR 156 187 mts
1C X 70 Sq.mm Cu, BARE CONDUCTOR 401 481 mts

1C X 240 Sq.mm Cu, PVC Cable (G/Y) 107 128 mts


1C X 70 Sq.mm Cu, PVC Cable (G/Y) 810 972 mts
25mmL X 3mmT, Aluminium STRIP 2105 2526 mts

(16∅mm, 1.5mm length) X 3 nos. of rod. , Cu, lightining 212 255 Nos.
EARTH ROD
AIR TERMINALS (16∅mm, 300mm Height) 224 269 Nos.
EARTH PIT INSPECTION CHAMBER (LIGHTNING) 95 114 Nos
TEST LINK BOX 90 108 Nos