Bill PROJECT : ONE & ONLY ROYAL MIRAGE – PHASE III

INSTALLATION CHECK LIST FOR CHILLED WATER PUMP

DRAWING NO. REV.


SYSTEM LOCATION
DESCRIPTION

Sl.
Description Yes No Remarks
No.
Check the foundation for size, levels, as per approved
1 coordinated drawings for pumps.

Confirm that all pumps are as per submittal and approval


2

Check the pumps for any visible damages during handling.


All the handling shall be as per manufacturer’s
3
recommendations.

Approved spring isolators are kept under the inertia base as


4 per the approved shop drawings.

Ensure the pumps are installed in level.


5

Check the alignment of the pump with motor


6

Check the CHW supply and return headers and condenser


7 piping connections.

Ensure that all relevant valves i.e. NRV/DRV strainer, gate


valves and flexible connections are as per approved
8
schematic shop drawings.

Check the rotation of motor/impeller


9

Ensure that all piping connections to pumps are completed


10 and bolts are tightened.

DOCUMENT NUMBER ISSUE PAGE NO. DATE

BILT/J-225/QAP/AC-05 REV. 0 1 of 3 16-09-2009


Bill PROJECT : ONE & ONLY ROYAL MIRAGE – PHASE III

INSTALLATION CHECK LIST FOR CHILLED WATER PUMP

DRAWING NO. REV.


SYSTEM LOCATION
DESCRIPTION

11 Ensure that pumps are having easy and safe maintenance


access including all operational valves/strainers etc.

Sl.
Description Yes No Remarks
No.
12 All the drain lines are connected/routed to nearest FD.

Safety guard is mounted on coupling.


13
Rotation of pump is marked and visible.
14

All the pressure and temperature indicating gauges are


15 mounted in position and no physical damages.

Check and replace lubrication oil for bearing prior to trial


16 runs and cooling water circuits are completed.

Confirm the internal cleaning of piping system prior to


17 connection with pump.

CONSULTANTS COMMENTS:

ENGINEER/SUPERVISOR (BILT) NAME SIGN.

DOCUMENT NUMBER ISSUE PAGE NO. DATE

BILT/J-225/QAP/AC-05 REV. 0 1 of 3 16-09-2009


Bill PROJECT : ONE & ONLY ROYAL MIRAGE – PHASE III

INSTALLATION CHECK LIST FOR CHILLED WATER PUMP

DRAWING NO. REV.


SYSTEM LOCATION
DESCRIPTION

QA / QC ENGINEER (BILT) NAME SIGN.

CONSULTANT/CLIENT NAME SIGN

DOCUMENT NUMBER ISSUE PAGE NO. DATE

BILT/J-225/QAP/AC-05 REV. 0 1 of 3 16-09-2009