J’NER CEPADA CONSTRUCTION

Barangay Canturing, Maasin City, Southern Leyte

CONSTRUCTION METHOD

One of the most important parts of the work we always consider the preparation
of comprehensive time and progress chart, periodic revision as circumstances demand
and the regular comparison of the progress made with the program.

Safety in the project construction must be considered at all times. Provision for
adequate measures to minimize material manual handling hazards and other factors
that may endanger property and life,

Special considerations also regarding stock piled materials near the


construction site, with the provision of visible markings or precautionary signs to avoid
accidents.

The job should be adequately but not excessively staffed to ensure efficient and
must be selective in sending men of proven ability and qualification to start the work.

Submitted by:

NERIO D. CEPADA, JR.


Proprietor/ Manager