TITLE: Table A1.2- Lightning Protection Calculation for 4.16kV
SHEET NO.
Switchgear Building
DATE :
Building Details:
Dimensions: L= 39.2 m
W= 13 m
D H= 7.95 m
2
Equivalent collective area Ac = LW + 2LH + 2WH + π H
2
Ac = 1538.14 m
Conclusion
H
Lightning Protection System Should be Installed
NUMBER OF DOWN CONDUCTORS (As per IEC 62305-3 spacing of down conductor shall be max 10 m)
K No. Of down conductors as per BS 6651 12 Nos. Every corner and along Length & Width
Material 95 mm2 bare copper conductor
N Arrangement of conductors :