DRAWING NUMBER REVISON


REVISION HISTORY
A3D.205071-16A A
"Doculive Ref DOC-150916-CHU"
PLEASE READ CAREFULLY. IF IN DOUBT ASK PLEASE READ CAREFULLY. ECO No.
09-16
REV.
A
DESCRIPTION.
REVISED AND RE-ISSUED PER CM
DATE.
SEPT 16
APPROVED.
CM. ESB
H H

NOTES: NOTES CONT....:

1. GENERAL.
5.2.2 External walls must be of cavity construction. They shall be constructed of block on flat for the inside
These drawings are to be read in conjunction with ESB specification 13320 Rev 8 leaf and block on edge for the outer leaf. The outer leaf may be of a material which can be certified to
'General Specification for MV Substation' and the 'National Code of Practice for Customer Interface which ESB Networks satisfaction to provide the equivalent and moisture barrier.
may be downloaded from ESB's web-site (www.esb.ie/esbnetworks).
5.2.3 The inner and outer leaf will be separated by a 100mm cavity. The cavity at the door reveal shall be
This specification / drawing is not for use where generator plants such as; windfarms, solar farms, landfill gas, sealed by returning the inner leaf tight against the outer leaf to provid fire rating. 300mm wide vertical DPC
biomass or hydro plants are being connected to the (MV) system. must be installed at the inside of the outer leaf at the reveal. There is no need to provide insulation of the
G wall cavity. G
Failure to comply in full with the requirements of this specification will delay installation of supply.

These drawings relate to the ESB MV Substation and do not show the customers switchroom. 5.3 SUBSTATION ROOF.

2. PLANNING PERMISSION. For stand alone buildings or substation buildings adjoining customer switch rooms an over hung poured
concrete roof is the preferred option. This design is less prone to leaks and requires little maintenance.
The customer is responsible for obtaining planning permission for the MV sub-station building. Precast slabs or permanent formwork are NOT permitted.

3. FIRE SAFETY REGULATIONS. In the case of an 'Incorporated MV Station' the roof structure will be as detailed in sheet 16 of this drawing.
Precast slabs or permanent formwork are NOT permitted.
The substation building must comply with the FIRE SERVICES ACT, and all regulations
F made under this act. The location and construction of the sub-station building must also F
comply with the Fire Safety requirements of ESB specification 13320 Rev 8. 5.4 EARTHING - MV & LV EARTHS.

Electrical smoke detectors are only permitted if mounted on the substation door. A special hatch is fitted 5.4.1 Floor steel earthing will be carried out and tested for in accordance with requirements of section 5.1
to the door at the manufacturing stage. The door supplier must be advised of this requirement. Plastic trunking
is required and no earth wire is permitted. Air sampling systems are permitted provided the the pipe work is 5.4.2 Copper Earth Mats. A copper earth will always be required outside substation doors. The earth mat
non conductive and the equipment does not require the sub station to be opened for annual inspection of will be purchased only from an approved ESB supplier. The earth mat will be placed at a depth of
the pipe work. 200mm below ground and the earth mat tail will carry into the substation in the central cable duct.

4. SAFETY - STATUTORY OBLIGATIONS 5.4.3 MV and LV earths will always be required at the ESB substation, the earth can extend up to 25 meters.
Therefore, the surrounding grounds cannot be finished until these earth wires have been installed and
The customer is responsible for managing safety for the entire building project in accordance with tested. Details of the location for the earth wire must be discussed with the local ESB representative.
E Irish Safety Legislation. E
These include: 6. EXTERNAL WALL CLADDING.

4.1 The Safety Health & Welfare at Work Act. External wall cladding may be considered in some circumstances. Any proposed cladding material should be
4.2 The Safety, Health & Welfare at Work (General Application) Regulations. maintenance free. It should not diminish the ventilation or damp proofing properties of the building.
and subsequent amendments.
4.3 Safety, Health & Welfare at Work (Construction) Regulations. Non metallic cladding is the preferred option as it does not present a safety risk from an electrical point of view.

5. CRITICAL ASPECTS OF THE BUILDING. Sharp edges are not acceptable. Cladding should not provide a climbing aid onto the building.

5.1 RE-INFORCING STEEL.


7. SUBSTATION DOORS.
D Construction steel in the concrete floor of the substation shall be separated from the metalwork of any D
other part of the building. All the steel mesh in the substation floor shall be connected metallically to form an Galvanised steel substation doors must be installed to ESB specification 08100. Doors must be sourced
earth grid. only from an ESB approved supplier. A list of these suppliers accompanies specification 13320 and is available
to download from ESB's web-site. (www.esb.ie/esbnetworks).
Steel mesh shall be exposed for inspection and electrical testing at locations as follows;
The size of opening required for the installation of the doors is detailed on this drawing.
5.1.1 At the door end of the central cable duct, a 16mm diameter re-bar shall extend across the duct and
be welded to the re-inforcing steel on each side. This is the bonding point for the station earth grid. External cladding may be permitted on doors (refer to point 6 above) provided there is no breach of the
(figure A sheet 2) galvanising. Cladding shall add no more than 40mm to the overall depth dimension of the doors.

5.1.2 At the rear right hand corner, a 16mm diameter re-bar shall extend across the duct and The extra weight bearing on hinges should not be excessive. The doors shall open through 180 and it is not
be welded to the re-inforcing steel on each side. (figure A sheet 2). permitted to significantly extend the hinges to achieve this. The normal function of the doors, such as locking /
C access mechanisms, ventilation and any other facilities shall not be impeded. Sharp edges are not acceptable. C
5.1.3 Electrical test point: In the duct right hand wall, midway along the left hand cable duct.
(figure B sheet 2). If a smoke detector is required this must be advised to the approved door supplier at the time of ordering.
5.1.4 Electrical test point: In the duct wall, midway along the right hand slab at the rear of the station. A drip rail must be provided at the top edge of the door if it is fitted flush to a multi storey building facade
(figure A sheet 2).
If required doors may be painted to blend with the building facade.
5.1.5 Test points can be made by securing a timber or foam block 150 x 150 x 50mm deep (fig B sheet 2),
to a cross in the steel mesh at a central point in the duct wall. The block will lie against the inside of
the shuttering. This will form a void in the poured concrete when the shuttering is removed. Installations
that fail electrical continuity tests will be rejected, correction and re-instatement will be made at the
developer's expense. gbb engineering & design CLIENT:

B
(Refer to figures A &B on sheet 2 of this drawing for electrical test point locations)
services. B
Units 9. Castlepollard SC. Oldcastle Road.
Castlepollard. Co. Westmeath. Ireland.

phone: +353 (0) 44 9662537


5.2 SUBSTATION WALLS.
APPROVALS: PROJECT NAME:
5.2.1 Internal walls rising from the strip foundation are to be constructed of 215mm block on flat to ensure; PROPRIETARY NOTE
THE USE, DUPLICATION OR DISCLOSURE OF THIS DATA
DRN BY: MV SUB STATION BUILDING
A. Consistency of the 4 hour fire rating. (IN WHOLE OR IN PART) FOR ANY PURPOSE WITHOUT
THE WRITTEN PERMISSION OF
GB
DRAWING TITLE:
GBB ENGINEERING & DESIGN SERVICES OR THE
APP BY:
B. Electrical isolation of steelwork from that in the rest of the building. NAMED CLIENT COMPANY IS STRICTLY PROHIBITED.
CM, ESB
MV SUBSTATION BUILDING
A MATERIAL Construction Details A
SEE NOTES SIZE DESCRIPTION DRG No:

FINISH
A3 CONSTRUCTION DRAWING A3D.205071-16A
FIRST ANGLE PROJECTION SEE NOTES
SCALE 1:10 REVISION A SHEET 1 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H
NOTES CONT .....

NOTES CONT....:
8. CUSTOMER SWITCH ROOM.

Not shown in this drawing but must be provided if required is a customer switch room adjoining the ESB sub-station. 11. IMPORTANT NOTES

The switch room houses the customers main circuit breaker and revenue metering. The customer switch room is
normally positioned on the right hand side but can be located on the left or to the rear of substation. However the 11.1 This drawing contains important notes placed about the various sheets which make the drawing
layout of the ESB substation floor must remain in the same orientation as detailed in this drawing. set. These notes should be carefully studied as they contain important information non adherence
to which will cause conflict to the specification requirements.
G G
9. HOUSE SUPPLY.
11.2 The substation building is not designed to be load bearing. All structures above and adjoining the building
The terms and conditions for connection at Medium Voltage require the customer to provide, must be supported independently.
free of charge, a single phase LV supply for the heating and lighting of the ESB substation.
12. KEY TO DRAWINGS.
In most cases the ESB keeps sub-station earths separate from customer earths. The customer
shall provide a 6mm / sq stranded copper phase and neutral wire into the ESB sub-station in Sheet No. Description & Application.
a plastic conduit.
1 THRU 2 Cover sheets. The information contained in these sheets is of a general nature and is important
All cable openings in the completed installation shall be sealed to maintain the 4 hour fire rating. OF 17. to the build configuration. It should be studied in detail and any ambiguity clarified
with your ESB representative before design and construction begins.
F F
10. DRAWING STRUCTURE. 3 of 17. Illustration drawing. This drawing gives an overview of the finished substation building and
also contains a detailed index to the contents of the drawing set from sheets 4 through 17.
This drawing is structured in a manner to clearly illustrate the requirements for the building
components (foundation, walls, ducting, roof etc.). If in doubt you should contact your ESB 4 THRU 17 Detailed drawings and specifications of the build requirement for the Substation Building.
representative who will clarify any ambiguity that may arise. OF 17.

E E

Figures A and B below, to be read in conjunction with note 5

D Typical test point Ref 5.1.1 D


formed in the concrete Bonding Point
slab. Re-inforcing steel must
be exposed. Void formed by
the inclusion of a timber or foam
block secured between the
re-inforcing steel and the shuttering.

C C

DETAIL
SCALE 1 : 5

Ref 5.1.4
Ref 5.1.3 Electrical
Electrical Test Point
B Test Point B

Fig B.
Electrical Test Fig A.
A
Point Details. Single Sub Building A
Concrete Slab. SIZE DRAWING NUMBER

A3 A3D.205071-16A
SCALE 1:50 REV LETTER A SHEET 2 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H

G G

F F

E E

ESB MV Sub-Station
Building
D D

Detail Drawings & Specification for the


ESB Substation Building.

Sheet Index:

Sht No: 4 - Elevations.


Sht No: 5 - Sections & Elevations.
C Sht No: 6 - Sections & Elevations. C
Sht No: 7 - Detail Views 1.
Sht No: 8 - Detail Views 2.
Sht No: 9 - Site Excavation Details.
Sht No: 10 - Strip Foundation Details.
Sht No: 11 - Rising Walls & Duct Ope's.
Sht No: 12 - DPC, Ducting & Floor Slab.
Sht No: 13 - Floor Slab.
B Sht No: 14 - External Walls. B
Sht No: 15 - Roof In Place
Sht No: 16 - Roof Detail For 'Incorporated MV Substation'.
Sht No: 17 - Internal / External Finishing Requirements.

A A
SIZE DRAWING NUMBER

A3 A3D.205071-16A
SCALE 1:50 REV LETTER A SHEET 3 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H
B F 2485 min Use only ESB approved E
sub station doors ref gbb-800-398.

A A
G G

4430
2715

2485 min
Ground level
Conc step flush
to ground level
F F
C C
800

E E

B E
F
665 450 LEFT SIDE ELEVATION

D 4930 D

NOTES:
FRONT ELEVATION NOTES cont... :
1. GENERAL.
5. RAINWATER PIPE.
The following notes refer to the siting for the sub-station.
For free standing stations a non metallic rain water pipe must be provided. Drainage pipes must not pass
2. ACCESS. inside the sub-station.

The substation building must be located at ground level. Vehicular access may be required at any time 6. DOORS.
C of day or night. The station will have an access corridor of at least 3m wide and 4m high. The maximum C
slope of access will be 1:10. Special doors have been designed to include vertical louvres for ventilation. It must be possible to open
the doors through 180 degrees. The doors are available in one standard size and the door ope must be made
Where necessary, a driveway 3m wide will be laid. The driveway will be 100mm of concrete on 150mm to accommodate these. The ope size must be 2485 X 2485mm -0mm / +20mm.
bed of well compacted hard core.
7. EARTHING.
If the sub-station is to be located in a car park, it may be necessary to install demountable bollards or
paint yellow hatching on the ground to ensure that ESB can gain un-restricted access to the station. To ensure electrical safety, the re-inforcing steel incorporated in the sub-station floor will be earthed. The
earthed reinforcing steel in the floor must not be connected to any other steelwork.
3. SITING OF THE STATION WITHIN A BUILDING COMPLEX (An Incorporated MV Station).
Connection points and electrical test points are shown in Fig's A & B in sheet 2 of this drawing.
B Where substation doors are more than 10m from main entrances and exits, air conditioning intakes, escape B
ways, oil pipes, gas pipes, fuel tanks or similar risks, then will be no more additional fire safety requirements. 8. NO IMPEDIMENTS.

Where substation doors are less than 10m from main entrances and exits, air conditioning intakes, escape There must be no impediments (beams, columns etc) within the substation. Pipes or other services not related
ways, oil pipes, gas pipes, fuel tanks or similar risks, then additional precautions shall be taken and written agreement to the electricity connection must not be routed through the substation.
must be obtained from the Fire Officer.

ESB MV Sub-Station
If there are windows within a 3m radius of the substation door frame, the rooms, units or apartments served by
the windows shall have an alarm activated by a detector in the substation.

Building
A A
4. DRAINAGE.
SIZE DRAWING NUMBER
Adequate below ground level drainage must be provided to ensure that the substation and ducts are not A3 A3D.205071-16A
liable to flood.
SCALE 1:75 REV LETTER A SHEET 4 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" 4880 approx H
Block construction from strip
4650 foundation to roof level. External leaf SECTION B-B
required on all external walls. SCALE 1 : 50
4450
4000 Finished Internal
16mm rebar 125mm diameter duct
earthing point with long radius bend
G G
450 Outer leaf Cavity extends a
Ground level minimum of 225mm

2600
outside
External render below the DPC level
3500
A2

100
100

330
F F

200

900
1210
3500 Finished Internal

290
530
450

1450
4430 approx
3950

4150
E E

800
450
Cable

200

260

50
duct ways 500 440

50
530
700
Cut back tails
from door mounting RC lintels over
D brackets. door way. D

3500
Cavity A1
C
100mm 500 125mm diameter duct 2485 min C
with 1.2m radius bend door ope
conc slab 200mm A3 & A9
Inner leaf thk laid over copper earth
450 450
mat. ground mat tail
earth mat to extend into duct trench Oil trap
under 200mm SECTION A-A
concrete SCALE 1 : 50 Earth mat
B tail to cable B
duct.
A number of possible duct locations are shown on all four sides
of the substation building. Details of cable trench layout shall be
800

ESB approved
discussed with a local ESB representative to determine duct installation copper earth mat
best suited to the particular site.

A A
Refer to general notes (sheets 1 & 2) for details of steelwork SECTION F-F
and wall construction requirements. A4 SCALE 1 : 50 SIZE DRAWING NUMBER

A3 A3D.205071-16A
SCALE 1:75 REV LETTER A SHEET 5 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU"
09-16 A REVISED AND RE-ISSUED PER CM
H
Typical duct 1700
trench locations
Typical duct
trench locations

Rising walls

500
200
G G

Typical duct
trench locations

Refer to spec 13320


RC lintle for details of finish to
F over door internal walls. F
650

250

450
450
200

3500
E 1700 Refer to spec 13320 E
for details of floor finish
900

600

A7
A5

D D

Reinforced conc
floor slab for rough gravel
reinforcing details filling
see sheet 13

C C

Typical duct Typical duct Extension


trench locations trench locations from re-forcing SECTION E-E Earth
SECTION C-C steel brought into SCALE 1 : 50 mat tail
duct trench

B B

A number of possible duct locations are shown on all four sides


of the substation building. Details of cable trench layout shall be
discussed with a local ESB representative to determine duct installation
best suited to the particular site.

A A
Refer to general notes (sheets 1 & 2) for details of steelwork SIZE DRAWING NUMBER

and wall construction requirements. A3 A3D.205071-16A


SCALE 1:50 REV LETTER A SHEET 6 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.

440
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H

325
Internal leaf construction 225
solid conc blocks 215 x 440 x 100 thk External rendering finished
laid on flat from DPC to roof level. to blend with surrounding
buildings. The finish must be
Door hanging maintenance free.
DETAIL A2
G brackets SCALE 1 : 25 G
Cladding may be considered
providing it meets with the External leaf Internal leaf
criteria laid down in section

215
Finished
Vertiacal DPC 3.08 F. ref spec number 13320 ground level RC lintel over duct
at cavity closing openings
225 min
Duct opening

F Trench wall F

Conc strip foundation


laid on 50mm conc binding

900

800
The cavity at the door reveal strip to be re-inforced with
must be sealed by returning 100mm cavity 500 A252 square mesh with min
500mm cover. Re-inforcing

330
the inner leaf tightto the
outer leaf to be lapped min 300mm
DETAIL A1 where required.
E SCALE 1 : 25 External leaf construction E
solid conc blocks 215 x 440 x 100 thk
laid on edge from DPC to roof level.
Cavity must be kept clear and bridging
Door weather with bedding mortar prevented.
125mm Dia
strip ducting

98 163
D D

Rising wall construction 700


Door frame
bottom member 215 x 440 x 100 thk solid
conc blocks laid on flat
and interlocking from strip
foundation to DPC level

C C
RC lintel over
cable ducting The DPM will need
to be re-sealed around
Cable ducting after it has been cut
ducting to allow the ducts enter
the trench.

B B

finish off concrete


after fitting of doors. The ducts will be
DETAIL A3 & A9 spaced as required DPM 1000 gauge
SCALE 1 : 3 and gaps between DETAIL A4 visqueen.
them packed with SCALE 1 : 25
A course sand A

Refer to general notes (sheets 1 & 2) for details of steelwork


SIZE DRAWING NUMBER

and wall construction requirements. A3 A3D.205071-16A


SCALE 1:50 REV LETTER A SHEET 7 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H

100cavity
Internal leaf

External leaf
DPC to full width
G of rising walls lapped All trench edges to be G
300mm where required rebated 40 x 40mm 40
for fitting of GPR trench
Finished covers
ground level
DPM brought up all

40
150 side walls and lapped
under DPC
F F

Cavity to extend
225mm below DPC

E E
Rising walls DETAIL A7
DETAIL A5 SCALE 1 : 10
SCALE 1 : 15

Door rebate formed in


floor concrete to
Floor concrete be filled after door
entends out under 115 installation is complete
D D
door opening

66

C C

Outside step laid


Earth mat over ESB ground mat
tail to cable
duct.

B Earth mat covered B


RC lintles over with 200mm conc
cable ducts
DPM is brought
DETAIL A9
SCALE 1 : 15 out under the
floor concrete

A A
SIZE DRAWING NUMBER
Refer to general notes (sheets 1 & 2) for details of steelwork A3 A3D.205071-16A
and wall construction requirements.
SCALE 1:50 REV LETTER A SHEET 8 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H

5075

NOTES:

1. GROUND WORKS (EXCAVATION).

Excavation for strip foundations will be according to the dimensions shown on this drawing sheet. These
dimensions are given as a minimum. However, it may be necessary to excavate deeper to reach a
G sufficiently firm stratum. G

2. UNDERGROUND CABLES.
Underground cables constitute one of the the more common hazards encountered when digging in
in the street, near buildings or on building sites, always assume electric cables will be present. If ESB
cables, cable slabs or warning tape are uncovered then digging must stop until the site has been
inspected and made safe by ESB personnel.

The customer is required to ensure that when digging is taking place, the location of all underground
F
cables in the vicinity is known, maps giving the general location of cables are available from ESB. F
A cable avoidance tool, which should be used by a skilled person, can give a more precise location
of cable position when used in conjunction with maps.

3175
4575

V
V
E 3675 E

A number of possible duct locations are shown on all four sides


of the substation building. Details of cable trench layout shall be
discussed with a local ESB representative to determine duct installation
best suited to the particular site.

D D

C C
FRONT END OF SITE

5075
GROUND LEVEL
700 700
B FINISHED GROUND B
LEVEL

ILLUSTRATION TO SHOW
1310
1450 MIN

EXCAVATION FOR
STRIP FOUNDATION

A A
SIZE DRAWING NUMBER

SECTION V-V A3 A3D.205071-16A


SCALE 1:50 REV LETTER A SHEET 9 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.

H
"Doculive Ref DOC-150916-CHU" 09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H

Re-inforced conc
pad 290mm thick.
NOTES:

1. GENERAL.

The following notes refer to the requirements for the re-inforced concrete strip foundation.
G G
2. DETAILS.

The concrete strip will be a minimum of 700mm wide and 290mm thick, re-inforced with A252 square
mesh lapped 300mm at all joints with at least 50mm of concrete covering. The strip will be laid on 50mm
thick well compacted concrete binding laid in base of trench minimum depth of 1400mm below ground.

3175
F F

G G
3675

A252 Mesh lapped 300mm Conc pad 290mm


E where required with at least thick laid on 50mm E
50mm cover of conc well compacted conc
binding

50 min
D D

50mm thick well


C 700 compacted conc binding C

Earth
290

700 DETAIL A11


SCALE 1 : 10
B B
50

SECTION G-G A11

A A

Refer to general notes (sheets 1 & 2) for details of steelwork SIZE DRAWING NUMBER

and wall construction requirements. A3 A3D.205071-16A


SCALE 1:50 REV LETTER A SHEET 10 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H

Ground SECTION J-J

150
level Rotated View

100
450 150

G G

1210

900
450

330
4000
J
F F
1700

200
RC lintel over

50
cable trench's

3500
3350
cavity extends 225mm
below DPC level

E E

H
H Rising wall construction
215 x 440 x 100 thk solid
conc blocks laid on flat
Typical Bonding and interlocking from strip
pattern for rising walls foundation to DPC level.
D
up to cavity level D
Blocks to conform to IS 20.

The approved substation


doors are available in one 2485 +20 / -0 225
C standard size. To ensure fit C
this dimension for the door
ope must be held as specified
50mm well compacted sand
4000 440 on 200mm well compacted
hard core
1850 1700
100

B B
900

330

1450

Illustration View

A A

450 RC lintel over Refer to general notes (sheets 1 & 2) for details of steelwork
SECTION H-H
SIZE DRAWING NUMBER

cable trench and wall construction requirements. A3 A3D.205071-16A


SCALE 1:50 REV LETTER A SHEET 11 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.

H "Doculive Ref DOC-150916-CHU"


K 09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H

Poured re-inforced floor DPM continuous


DPM 1000 gauge slab (see next sheet for details. around full inside RC lintels
visqueen lapped and lapped over Earth mat over duct
over rising walls rising walls tail brought openings
into cable duct
G G

Duct Duct
A9

900
250

trench trench

L
L
F F

800
225 inner leaf
100 cavity
Conc strip Cable ducts
Cable 100 outer leaf foundation Floor
E trenches slab E
After installation of
50mm thk layer ducts the openings
of compacted sand through to the trench
SECTION K-K will be fire sealed
SCALE 1 : 50 to 4 hour rating
Excavate cable
trenches
D D

450 Conc step over


ESB approved earth mat
C K C
Conc step with
door frame recess Section of
floor re-inforcing
Earth mat tail brought into trench

B B

Illustration View
260

900
A A
SIZE DRAWING NUMBER
SECTION L-L A3D.205071-16A
SCALE 1 : 50 A3
SCALE 1:100 REV LETTER A SHEET 12 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H

Min depth of conc 40 x 40mm rebate


260mm in any vertical around all duct edges
direction. to provide for installation

40
260
M N P of duct covers

450
G G

Important Note:

530
450
1155

Steel work inside the sub-station


should not be extended outside the building
450
rough gravel 450
F F
filling 530
50

Q 1120 1655 Q

200

260
400

200
400
200

40
1050

120
900

900
E E
Oil trap

Oil trap
P SECTION P-P
rough gravel
M N SECTION M-M filling
50 x 200 x 200mm deep
D pocket formed here D
to allow earth cables 16mm rebar
Mesh to be brought electrical test
out to cable duct at to exit from trenches.
point
one point for earth
connection 125mm Diameter
300
50

duct in place

C C
260

SECTION Q-Q A252 sq mesh lapped


B 300mm as required B
with min 50mm cover
Joints and overlaps of concrete
in mesh to be welded
to provide good
electrical continuity
ILLUSTRATION VIEWS
SHOWING FLOOR SLAB
A A
WITH DUCT IN PLACE
Refer to general notes (sheets 1 & 2) for details of steelwork SIZE DRAWING NUMBER

and wall construction requirements. A3 A3D.205071-16A


SCALE 1:50 REV LETTER A SHEET 13 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
A SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU"
09-16 REVISED AND RE-ISSUED PER CM
H
S Felt DPC to full
width of walls lapped
300mm as required 440

Internal leaf construction


solid conc blocks 215 x 440 x 100
thk laid on flat from DPC to roof
level. 225
G G
100

115

2600
2485 +20 / -0
DPC over DPM to full
width of walls lapped Critical to
300mm as required ensure door fit.
F F
R
R

E E

SECTION R-R

Vertical DPC RC lintels over


doorway 300mm
at cavity closing wide on inside and
D 100mm wide on outside D
External leaf construction
solid conc blocks 215 x 440 x 100
thk laid on edge from DPC to roof Cavity to be
level. sealed by returning the

ensure door fit


inner leaf tight to the

2485 +20 / -0
Critical to
100mm cavity all round outer leaf
cavity closed at door must be kept clear and
C opening by returning S bridging with mortar prevented C
inner leaf 225mm thk Door rebate
vertical DPC at cavity
closing

B B

SECTION S-S
A A
Refer to general notes (sheets 1 & 2) for details of steelwork SIZE DRAWING NUMBER

Illustration View and wall construction requirements. A3 A3D.205071-16A


SCALE 1:50 REV LETTER A SHEET 14 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.

H "Doculive Ref DOC-150916-CHU"


T 09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H

A12
300
300

Only ESB approved doors to be fitted. Door


2710
supplier information available from ESB web site.
G After installation ensure that the doors have a After installation of doors the G
smooth swinging and closing action. ends of fixing brackets to be rough gravel
trimmed back.
filling

Doors must be fixed to inner


leaf with 16mm rawl bolts
2 pls each bracket minimum
F F
Equipment
access doors

Personnel access door

E T E
65mm sq PVC downpipe SECTION T-T
asphalt dressed down
into outlet
Important Note.
For more detailed information on the sub-station
doors (availability, installation etc) refer to
D ESB specification 13320 D

50mm fall
20mm asphalt or other
approved roof covering
laid in two 10mm layers
on min 25mm sand / cement
50mm fall screed laidto falls on 175mm thk
C well vibrated 35N C
re-inforced conc slab

A393 mesh

25
50mm fall

50mm fall
B B

55
Illustration View
NOTE: DETAIL A12
A A
a continuous fall from front SCALE 1 : 10
A393 mesh
to back of 100mm is also SIZE DRAWING NUMBER

A3 A3D.205071-16A
deemed adequate
SCALE 1:50 REV LETTER A SHEET 15 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H

Y MV Substation incorporated
into a building complex
W
Adjoining
building space
A drip bar must
G be installed above G

and to the full width


All internal walls of the the doors
to be constructed from
225mm blocks laid on
flat to ceiling level A13

F F
Finished ground Adjoining
Finished ground building space Substation
level.
level.

E E

Y
SECTION Y-Y
W SCALE 1 : 60
125
10

D D
Min 175mm thk well vibrated
35N re-inforced conc slab DPC at cavity
3

Adjoining
closing carried
building space
down to drip bar
RC lintle in
150° inner leaf RC lintle in
Typical drip bar profile outer leaf
C All internal walls C

constructed from
225mm blocks
laid on the flat
Substation to ceiling level
Adjoining DETAIL A13
building space SCALE 1 : 10
Adjoining
B building space B
Vertical DPC
at cavity closing Door
frame

Incorporated ESB
A
MV Sub-Station A

Building
SIZE DRAWING NUMBER
SECTION W-W A3D.205071-16A
A3
SCALE 1 : 60
SCALE 1:50 REV LETTER A SHEET 16 OF 17
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
DRAWING NUMBER REVISON
REVISION HISTORY
A3D.205071-16A A IF IN DOUBT ASK ECO No. REV. DESCRIPTION. DATE. APPROVED.
09-16 A REVISED AND RE-ISSUED PER CM SEPT 16 CM. ESB
H "Doculive Ref DOC-150916-CHU" H
Important Note:
Internal walls and ceiling to be A formal final inspection of the completed sub-station
coated with a polybond sealer will be made by ESB before acceptance of the building
prior to painting with two coats and before commencing work on the installation of the
of an approved white emulsion paint. electricity connection.
No other colour will be accepted.
This inspection requires the building to be completed in
G full accordance with ESB specification. The inspection will G
ESB has an approved supplier take place after the customer has provided a Certificate
for GRP (Glass re-inforced Polyester) of Completion covering the workmanship and materials
duct covers. Duct covers will be delivered used in the construction of the building.
cut to size to be installed as shown opposite.
It is important that the rebates in floor The certificate must be completed and signed by the
are correct to size to ensure the covers fit chartered Engineer / Architect in charge.
properly and do not present a trip hazard.
F
A copy of the certificate is included in appendix 1 of the ESB F
Trenches to be left uncovered specification No. 13320
until approved by ESB. duct covers
in place

E E

Illustration View
Doors and roof hidden
for clarity

D D

C The floor of the sub-station will be painted with a 1000 C


moisture curing polyurethane coating for sealing
and dust proofing the floor. The colour will be red
or grey.
External walls to be finished
It is essential that the floor be non-slip finish. to blend with existing surrounding
buildings. Selected finish to be
Apply the finish as per detailed instructions outlined in maintenance free,
ESB specification No. 13320.
B B

this area of duct


directly under swith
is left un-covered End covers to be bolted
A A
to floor and adjoining covers
tie-wrapped together. SIZE DRAWING NUMBER

A3 A3D.205071-16A
SCALE 1:50 REV LETTER A SHEET 17 OF 17
12 11 10 9 8 7 6 5 4 3 2 1