You are on page 1of 29

Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Summary

DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA


DEPARTMENT OF NATIONAL ZOOLOGICAL GARDEN
TREATMENT PLANT FOR HIPPOPOTAMUS AREA AT DEHIWALA ZOOLOGICAL GARDEN
(BILLS OF QUANTITIES)

GENERAL SUMMARY - BILL


Amount
Bill Description
LKR
1 PRELIMINARIES ……………………..
2 TREATMENT PLANT ……………………..
3 DEMOLITION WORK ……………………..
4 PROVISIONAL SUM 4,080,000.00

Sub Total I
……………………..
Less - Provisional Sum and Preliminaries
……………………..
Sub Total II
……………………..
Less - Discount (If any)
……………………..
Sub Total III
……………………..
Add - Provisional Sum and Preliminaries
……………………..
TOTAL AMOUNT OF BILL (Excluding VAT)
……………………..
Add - VAT (…...%)
……………………..
TOTAL AMOUNT (INCLUDING VAT)
……………………..

Bidders VAT Registration No. ……………………………… …………………………….. …………………


Bid Amount before VAT (in words) Rupees ……………………………………………………………………
………………………………………………………………………………………………………………….
Name of Bidder : …………………………………………………………………………………………

Address : …………………………………………………………………………………………………….
…………………………………………………………………………………………………….

Signature and Seal :


Witness :
1) Signature : ………………………………… 2. Signauture : …………………………………

Central Engineering Consultancy Bureau 137


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Summary

Name : ………………………………………… Name : ………………………………………….

Central Engineering Consultancy Bureau 138


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden General Notes

Rate Amount
Item Description Qty Unit
LKR LKR

PLUMBING WORK

General Notes :
For the full description of materials and Note
workmanship refer to the relevant sections of
Specification for the works, Pricing Preambles
and the Drawings.

Where reference is made to certain Note


manufacturers' products and items identified
by registered trade marks, this has been done
for the sole purpose of defining and
establishing standards of quality and
performance and not with the intention of
restricting the procurement of material or
fitting to a particular manufacturer.

All types of fittings, materials, painting and Note


finishes shall be approved by the Engineer
prior to installation.

The contractor is responsible for obtaining Note


necessary authority approvals for the design,
equipments and installation.

The contractor shall arrange factory visit Note


training of staff, demonstration.

The contractor shall submit shop drawings for Note


the approval of the Engineer where required,
prior to commencing work.

Contractor shall prepare and submit As-Built Note


Drawings as per the Contract.

All samples shall be provided for the approval Note


of the Engineer prior to purchase of material.

Central Engineering Consultancy Bureau 138


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden General Notes

Rate Amount
Item Description Qty Unit
LKR LKR
The quantities given in the BOQ are Note
provisional quantities and shall not to be
considered as exact quantities of the works
under the Contract. The Contractor shall
determine actual quantity based on the
Specifications and the Drawings issued under
the Contract Agreement.

Central Engineering Consultancy Bureau 139


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 01 : Preliminaries

DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA


DEPARTMENT OF NATIONAL ZOOLOGICAL GARDEN
TREATMENT PLANT FOR HIPPOPOTAMUS AREA AT DEHIWALA ZOOLOGICAL GARDEN
Rate Amount
Item Description Qty Unit
LKR LKR
1A/- BILL NO. 01 - PRELIMINARIES
Mode of Payment :
The Contractor shall be paid sum for
reimbursement of actual cost on submission of
the relevant documents acceptable to the
Engineer plus 5% of the actual cost of Note
obtaining the Insurance Policies and Securities
for items. 1A/1, 1A/2 and 1A/3.

The Contractor shall be paid sum quoted on


satisfactory completion for items 1A/5 and Note
1A/14.

The Contractor shall be paid 60% of the sum


quoted on satisfactory completion of
temporary buildings or structures, 30% in
equal installments over the contract period and
balance 10% on dismantling and removal on Note
completion for items 1A/4, 1A/7, 1A/8, 1A/9,
and 1A/23.

Mode of payment to be mutually agreed


between Contractor and the Employer at the
commencement of the Contract in relation to
Note
the programme of work for items 1A/11.

The Contractor shall be paid in equal


installments over the items 1A/6, 1A/10,
1A/12, 1A/13, 1A/15, 1A/16, 1A/18, 1A/19, Note
1A/20, and 1A/21.

The Contractor shall be paid on signing of the


Contract Agreement for items 1A/22. Note

The Contractor shall be paid on the


completion of Works for items 1A/17. Note

Insurances and Securities


1A/1 Allow Provisional sum for providing a
Performance Security Item Sum 5,000.00
1A/2 Allow Provisional sum for providing an
Advance Payment Security Item Sum 16,000.00
1A/3 Allow lump sum for providing and
maintaining insurance covers including
Contractor's All Risk Policy, Workmen's Item Sum 70,000.00
Compensation and Third Party insurance, as
per the Contract.

Central Engineering Consultancy Bureau 139


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 01 : Preliminaries

Rate Amount
Item Description Qty Unit
LKR LKR
Total Carried Forward LKR 91,000.00

Total Brought Forward LKR 91,000.00


Contractor's Facilities
1A/4 Allow lump sum for constructing, maintaining
and dismantling on completion of the Works, a
temporary site office of 20' x 15' size,
including staff rest room & toilets and other
facilities for the Engineer's and Contractor's Item Sum ……………..
site management staff in accordance with the
plans prepared by the Contractor and approved
by the Engineer.

1A/5 Allow lump sum for providing telephone and


facsimile facilities, electricity and water
services for the Contractor's site office for Item Sum ……………..
their use in connection with the Works.

1A/6 Allow lump sum for maintenance, rental,


consumption charges etc. for telephone and
facsimile facilities, electricity and water
Item Sum ……………..
services for the Contractor's site office for
their use in connection with the Works.

1A/7 Allow lump sum for constructing, maintaining


and dismantling on completion of the Works,
buildings to be used as workshops and stores
of 20' x 20' size, for perishable materials.
Buildings shall be constructed in accordance Item Sum ……………..
with the plans prepared by the Contractor and
approved by the Engineer.

1A/8 Allow lump sum for constructing,


maintaining, dismantling and removal on
completion of the Works, of temporary
buildings for Worker's Rest room of 15' x 20'
size, including wash areas with electricity and Item Sum ……………..
water services in accordance with the plans
prepared by the contractor and concurred by
the Engineer.

1A/9 Allow lump sum for constructing,


maintaining, dismantling and removal on
completion of the Works, a temporary toilet of
10' x 6' size, including temporary septic tank Item Sum ……………..
and necessary sanitary appliances to Workers.

Central Engineering Consultancy Bureau 140


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 01 : Preliminaries

Rate Amount
Item Description Qty Unit
LKR LKR

Total Carried Forward LKR ……………….


Total Brought Forward LKR ………………
Construction Management and Supervision
1A/10 Allow lump sum for employing suitably
qualified and experienced technical
personnel on full time/Part time basis for Item Sum ……………..
construction management services at site.

Category & Qualifications & Experience Min. Monthly Emoluments


01 nr of BSc Civil Engineer with 2 years
Experience (3 months, part time basis) …………….

01 nr of NCT/IET Technical Officer with 5


years Experience (4 months, full time basis) …………….

Setting Out
1A/11 Allow lump sum for necessary setting out
and survey works in accordance with the
Drawings and other written information given Item Sum ……………..
by the Engineer.

Quality, Standard and Progress


1A/12 Allow lump sum for provision of progress
reports including photographic records and
other schedules included in the ICTAD
publication-Guidelines for effective
construction Management (ICTAD/CM/01) Item Sum ……………..
relevant to contract administration as directed
by the Engineer.

1A/13 Allow lump sum for all cost in connection


with preparing samples for testing of
Materials, Goods etc, as stipulated in the
Item Sum ……………..
specification, obtaining test reports and
submitting the same to the Engineer.

1A/14 Allow lump sum for submission of As-built


drawings. Drawings should includes to
provide one "A1" size transparency sheet and
three "A1" size Blue print copies for each Item Sum ……………..
category and submitting soft copies in latest
CAD version.

Central Engineering Consultancy Bureau 141


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 01 : Preliminaries

Rate Amount
Item Description Qty Unit
LKR LKR

Total Carried Forward LKR ……………….


Total Brought Forward LKR ………………

Health, Safety and Environment


1A/15 Allow lump sum for the following services
throughout the period of construction for the
Engineer's office, Contractor's site office and Item Sum ……………..
workers' rest room and other facilities;

a) Employing a workmen to clean and


maintain all areas to be in good hygienic
conditions including toilets, wash areas,
kitchen

b) Supplying adequate drinking water,


soap, detergent throughout the period of
construction.

1A/16 Allow lump sum for providing all necessary


safety measures to workmen and other parties
at site conforming to the latest industrial
safety regulations including necessary
protective hoarding, safety nets, helmets, sign Item Sum ……………..
boards and the like as per the Contract and as
directed by the Engineer.

1A/17 Allow lump sum for demobilization, removal


of all rubbish & debris and clearing up site on
completion, leaving all in good order and Item Sum ……………..
handing over.

Security and Protection


1A/18 Allow lump sum for employing a security
personnel on full time basis (only night duty)
throughout the period of construction and Item Sum ……………..
provide for necessary security lighting.

1A/19 Allow lump sum for providing and


maintaining necessary fencing around the
working area, hoarding and gates for
safeguard the works, materials and plants and
to minimize the disturbance to the public and Item Sum ……………..
Hospital Authority as directed by the Engineer

Central Engineering Consultancy Bureau 142


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 01 : Preliminaries

Rate Amount
Item Description Qty Unit
LKR LKR

Total Carried Forward LKR ……………….


Total Brought Forward LKR ………………

Services and Facilities


1A/20 Allow lump sum for supply of water for the
Works and paying all charges and other
expenses in connection with the supply from
Item Sum ……………..
water main, storage and reticulation.

1A/21 Allow lump sum for supply of temporary


electricity for the Works including temporary
connection, internal distribution arrangement,
means for an uninterrupted power supply and Item Sum ……………..
charges for consumption etc.

Miscellaneous
1A/22 Allow lump sum for stamp duty in accordance
with the prevailing regulations of the Item Sum ……………..
government.

1A/23 Allow lump sum to providing and


maintaining of Name Boards as directed and Item Sum ……………..
approved by the engineer.

Total of Bill No 01 (Excluding VAT)


1A/- ………………..
Carried to General Summary

Central Engineering Consultancy Bureau 143


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA


DEPARTMENT OF NATIONAL ZOOLOGICAL GARDEN
TREATMENT PLANT FOR HIPPOPOTAMUS AREA AT DEHIWALA ZOOLOGICAL GARDEN

Rate Amount
Item Description Qty Unit
LKR LKR

2A/- BILL NO. 2 COMPACT TREATMENT


PLANT

Excavation and Earthwork


Excavating in any material, except rock
requiring blasting, commencing from existing
ground level, excavation, levelling, grading or
ramming where necessary as specified in
following.

2A/1 Site Cleaning 57.00 m2 ………… ……………

2A/2 Remove top soil from existing ground level to


150 mm depth in tank area. 57.00 m2 ………… ……………

2A/3 Bulk excavation in tank area, depth not


exceeding 1.0 m. 57.00 m3 ………… ……………

2A/4 Bulk excavation in tank area, depth


exceeding 1 m but not exceeding 2.0 m. 57.00 m3 ………… ……………

2A/5 Bulk excavation in tank area, depth


exceeding 2 m but not exceeding 3.0 m. 38.00 m3 ………… ……………

2A/6 Bulk excavation in tank area, depth


exceeding 3 m but not exceeding 4.0 m. 12.00 m3 ………… ……………

2A/7 Disposal of excavated material away from site


as directed. 135.00 m3 ………… ……………

2A/8 Supplying and placing of gravel or other


approved quality soil backfilling with 95%
compaction inside pump room and on top of 30.00 m3 ………… ……………
existing soil.

2A/9 Earthwork supports, max depth ≥ 1.2 m &


(to be provided only if required, under the
direction of the Engineer. Rate for any type of
earth work supports except interlocking sheet 54.00 m2 ………… ……………
piles). (Provisional Quantity)

Central Engineering Consultancy Bureau 144


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………

Concrete Work

All concrete shall be made dense with a


vibrator, Unless otherwise specified in the
item, all reinforcement and formwork
measured separately. The rate shall include for
plant for mixing, handling, hoisting, pouring,
compacting, vibrating etc. and keeping the pit
dry during concreting. The rate shall also
include for formation of chamfers, groves,
channels etc. (Concrete testing is separately
measured under preliminaries.)

2A/10 Supply and laying of gauge 1000 polythene


layer under the screed layer 48.00 m2 ………… ……………

2A/11 75 mm thick screed concrete for base using


Grade 20 (20) mass concrete 48.00 m2 ………… ……………

2A/12 Grade 35A(20) concrete for bases 17.00 m3 ………… ……………

2A/13 Grade 35A(20) concrete for walls 34.00 m3 ………… ……………

2A/14 Grade 35A(20) concrete for top slab of tank 7.00 m3 ………… ……………

2A/15 Grade 35A(20) concrete for clarifier drain and


bridge above clarifier 1.00 m3 ………… ……………

2A/16 Grade 25(20) concrete for columns and beams


at pump room 1.00 m3 ………… ……………

2A/17 Grade 25(20) concrete for roof slab at pump


room 2.00 m3 ………… ……………

2A/18 Grade 25(20) secondary concrete fill inside


clarifier 5.00 m3 ………… ……………

Central Engineering Consultancy Bureau 145


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………
Form Work
Supply and fix in position 12 mm thick
plywood sheets for shutters. Rate to include
for necessary edges, battens etc. strutting,
bolting, wedging, easing, striking and removal
as specified and as directed.

2A/19 For sides of base slab 12.00 m2 ………… ……………

2A/20 For sides of walls 267.00 m2 ………… ……………

2A/21 For top slab 33.00 m2 ………… ……………

2A/22 For bridge above clarifier 8.00 m2 ………… ……………

2A/23 For clarifier drain 8.00 m2 ………… ……………

2A/24 For columns and beams in pump house 15.00 m2 ………… ……………

2A/25 For pump room roof slab 13.00 m2 ………… ……………

Reinforcement
Supplying and installation of Grade 460 (460
N/mm2) bars cut to length, bent to shape, rust
cleared and fixed in position. Rate to include
for binding wires, cover blocks etc. All
complete as per reinforcement schedule and
plans in approximate quantities in diameter.

2A/26 For Sump base slab 2,380.00 kg ………… ……………


2A/27 For Sump walls 4,760.00 kg ………… ……………
2A/28 For Sump top slab 980.00 kg ………… ……………

2A/29 For clarifier drain and bridge above clarifier 100.00 kg ………… ……………
2A/30 For columns and beams in pump house 200.00 kg ………… ……………
2A/31 For roof slab at pump room 280.00 kg ………… ……………

Central Engineering Consultancy Bureau 146


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
Brick Work
2A/32 225 mm thick brick wall in 1:5 cement sand
mortar for walls of pump House 20.00 m2 ………… ……………

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………

Waterproofing Work
Method and material should comply with the
following standards ASTM-1622, ASTM C-
518, ASTM C-272 AND ASTM D-696.
Contractor shall satisfy the consultant that the
waterproof coating is not of a toxic nature,
giving no element to Anaerobic and aerobic
bacteria. If the latter should occur, the
contractor shall provide and apply extra
coat(s) of non toxic sealant to walls and floors
of treatment plant, all in accordance with the
manufactures instructions.

2A/33 Broadcasting approved waterproofing material


(Cementatious crystalline or other approved
material) at 2.0 kg/m2 in powder form over
lean concrete for the base slab after doing all
reinforcement work and spraying clean water
in a fine moist over the broad cast material or 48.00 m2 ………… ……………
according to the manufacturer's specification.

Central Engineering Consultancy Bureau 147


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
Applying Cementatious crystalline
waterproofing material in two coats on
external wall surfaces and external sides
bottom slab surfaces of tank as per
manufacturer's specification. (Minimum
coverage per each layer at 0.8 kg/m 2). Rate to
include for cleaning existing external wall
surfaces to be free from dust, cement laitance,
grout deposits and repair honey combs, P-cone
holes, construction joints with non shrink,
high strength repair grout and curing the
application for 3 days and 25mm thick
protective screed all as per specification and
drawings.

2A/34 External wall surfaces of tank 112.00 m2 ………… ……………

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………
Applying Cementatious crystalline
waterproofing material in two coats on tank
bottom base, soffit of top slab & wall surfaces
internally as per manufacturer's specification.
(Minimum coverage per each layer at 0.8
kg/m2). Rate to include for cleaning of
existing internal wall surfaces to be free from
dust, cement laitance, grout deposits and
repair honey combs, P-cone holes,
construction joints with non shrink, high
strength repair grout, curing the application
for 3 days and 25mm thick protective screed
all as per specification and drawings.

2A/35 Internal tank base 46.00 m2 ………… ……………

2A/36 Internal soffit of tank top slab 33.00 m2 ………… ……………

2A/37 Internal Wall surfaces 155.00 m2 ………… ……………

Central Engineering Consultancy Bureau 148


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
Applying of membrane type (Torch-on or
other approved) waterproofing material
external surface of the top slab with 1:3
cement sand levelling (min 10 mm thick)
screed, 50 mm thick Grade 25 (20) concrete
protection layer as per manufacturer's
specification. Rate to include for cleaning of
existing floor surfaces to be free from dust,
cement laitance, grout deposits and repair
honey combs, P-cone holes, construction
joints with non shrink, high strength repair
grout, insulation layer and curing the
application for 5 days.

2A/38 For tank top slab including pump room 13.00 m2 ………… ……………

Construction Joints
2A/39 Supplying and fixing of 2 mm thick, 200 mm
wide mild steel plate as water bar and
applying approved bonding agent, preparing 80.00 m ………… ……………
surfaces for construction joint.

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………
Metal Work
2A/40 Supplying and fixing of 900 x 2100 mm single
slash Aluminium door with frame. Rate to
include for all necessary door locks, hinges, 1 nr ………… ……………
bolts and screws

2A/41 Supply and fixing of 600 x 1700 mm


Aluminium framed, Aluminium glazed side
hung window with louvers on bottom at pump 1 nr ………… ……………
room.

2A/42 Supply and fixing of heavy duty double seal


ductile iron cover lid (500 mm x 1000 mm
internal access hole dimension) including
2 nr ………… ……………
access hole frame and lifting hook as shown in
the drawing.

Central Engineering Consultancy Bureau 149


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
2A/43 Supplying and installation of 80mm dia. GI
Air Vent pipes. Rate shall include for 4 nr of
6mm thik M.S plate welded to pipe and to
1 nr ………… ……………
hold to mesh, 2 nr of stainless steel mesh etc.
and fixing with m.s bolts.

2A/44 Supply and fixing hand rail comprising of 50


mm diameter GI top rail, 900 mm high 25 mm
diameter GI vertical batterns at 1000 mm
intervals fixed on to concrete and 25 mm
diameter GI middle rail connecting props.
Rate shall include 2 coats of anticorrosive 20.00 m ………… ……………
paint and one coat of Enamel paint of
approved colour. All galvanizing shall be hot
dipped.

2A/45 Supply and fixing of support platform for


chlorine mixing motor using 25 x 25 mm hot
dipped GI angle bars structure. Rate shall 1.00 Item ………… ……………
include for nut and bolts

2A/46 Supply and fixing of 450 mm x 450 mm, 1.5


mm thick and 2800 mm deep stainless steel
baffle box in clarifier. Rate to include for 1.00 Item ………… ……………
stiffening top edge.

2A/47 Supply and placing of 2 mm thick 200 mm


wide stainless steel plate in clarifier. Rate shall
11.00 m ………… ……………
include for fixing to concrete drain.

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………
2A/48 Supply and installation of 650 x 650 mm GI
grating with 25 x 25 mm GI angle bars and 25
x 6 mm GI flat bars at 25 mm clear spacing
for walking path on clarifier. All galvanizing 2 nr ………… ……………
shall be hot dipped. Rate shall include for
fixing.

2A/49 Supply and placing of 2 mm thick 100 mm


wide stainless steel notch plate in clarifier.
Rate shall include for fixing to concrete drain 12.00 m ………… ……………
and make 25 mm x 25 mm 'M' shaped teeth.

Central Engineering Consultancy Bureau 150


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
2A/50 Supply and fixing of hot dipped galvanized,
PVC coated wire mesh, 2" x 2" mesh size,
gauge 12 with UV proof fabric net for open
areas of clarifier. Rate shall included for panel 1.00 item ………… ……………
structure and fixing hinges to the clarifier
bridge.

Floor Finishes and Wall Finishes


2A/51 15 mm thick 1:5 cement, sand plastering to
brick walls, columns, beams, slab soffits and
72.00 m2 ………… ……………
walls internally and externally in pump room.

2A/52 25 mm thick 1:3 cement, sand plastering to


top slab and top of the walls of the treatment 29.00 m2 ………… ……………
tank.

2A/53 25 mm thick 1:3 cement, sand rendering on


top surface of the floor slab inside pump
room. Rate shall include for finished smooth 5.00 m2 ………… ……………
with cement putty.

2A/54 Supply material and apply one coat of primer


and two coats of emulsion paint of approved
quality and colour, in all internal surfaces in 25.00 m2 ………… ……………
pump room.

2A/55 Supply material and apply one coat of primer


and two coats of emulsion paint of approved
quality and colour, in all exposed surfaces of
external walls and top slab of treatment plant. 37.00 m2 ………… ……………

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………
PUMPS, VALVES, PANEL BOARD,
EARTHING

Internal Return pump

Central Engineering Consultancy Bureau 151


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
2A/56 Supply and installation of three phase 2 no. of
Submersible pumps inside aeration tank
(European make) pumps to anoxic tank of
approved quality make to suit with following
conditions with both auto/manual operational
1 item ………… ……………
facility to operate in duty / stand by made and
in accordance with manufacturer's
specification.

Total Head - 3.2 m


Flow rate - 550 l/min
Rate shall include for timers, level regulators,
2 no. of duck foot bend, 2 no. of brass check
valve, 2 no. of brass gate valve, rail kit and
chain, electrical works including wiring with
protection measures and necessary fittings and
fixtures including rubber joint and provision
for pressure gauge.

Sludge Return pump


2A/57 Supply and installation of three phase 2 no. of
Submersible sludge return pumps (European
make) for the clarifier of approved quality
make to suit with following conditions with
both auto/manual operational facility and in 1 item ………… ……………
accordance with manufacturer's specification.

Total Head - 4.5 m


Flow rate - 315 l/min
Rate shall include for timers, level regulators,
2 no. of duck foot bend, 2 no. of brass check
valve, 2 no. of brass gate valve, rail kit and
chain, electrical works including wiring with
protection measures and necessary fittings and
fixtures including rubber joint and provision
for pressure gauge.

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………

Effluent circulation pump

Central Engineering Consultancy Bureau 152


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
2A/58 Supply and installation of three phase
centrifugal pump(European make) for
chlorination tank of approved quality make to
suit with following conditions with both
auto/manual operational facility in accordance 2 nr ………… ……………
with manufacturer's specification.

Total Head - 10 m
Flow rate - 250 l/min
Rate shall include for timers, level regulators,
foot valve, brass gate valve, brass check valve,
necessary electric wiring with protection
measures and necessary fittings and fixtures
including rubber joint, flexible pipe with
conduit protection pipes to convey chlorine
water from chlorine tank to the effluent pipe.

Chlorine dosing pump


2A/59 Supply and installation of single phase
chlorine dosing pump(European make) for
chlorination tank of approved quality make to
suit with following conditions with both
auto/manual operational facility in accordance 2 nr ………… ……………
with manufacturer's specification.

Total Head - 3.5 m


Flow rate - 25 l/hr
Rate shall include for timers, level regulators,
necessary electric wiring with protection
measures and necessary fittings and fixtures
including rubber joint, flexible pipe with
conduit protection pipes to convey chlorine
water from chlorine tank to the effluent pipe.

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………

Central Engineering Consultancy Bureau 153


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR

Submersible Aerator
2A/60 Supply and installation of 2 No of
Submersible medium bubble aerator
(European make), 35.0 m3/hr air transfer rate,
2.50 m water height with an aerator suction
silencer kit, lifting device, air inflow device
1.00 item ………… ……………
and stainless steel chain. Rate shall include for
electrical supply wiring with protection
measures and necessary fittings and fixtures.

Ventilation blower
2A/61 Supply and installation of 1 no. of Ventilation
Blower (European make), 15 m3/hr air flow
rate with non return valves and motor coveys
to vent out off gases in aeration tank, anoxic
tank, treatedeffluent tank and sludge holding
tank. Rate shall include for electrical supply 1 nr ………… ……………
wiring with protection measures and necessary
fittings and fixtures.

Chlorine mixing motor


2A/62 Supply and installation of 1 no. of chlorine
mixing motor with necessary electrical wiring 1 nr ………… ……………
and installations.

Motorized valve
2A/63 Supply and installation of 3" motorized valve
with over current limiter and limit switches,
timer, necessary electrical wiring and 1 nr ………… ……………
installations.

2A/64 Supply and installation of 4" motorized valve


with over current limiter and limit switches,
timer, necessary electrical wiring and 1 nr ………… ……………
installations.

Total Carried Forward LKR ……………..

Central Engineering Consultancy Bureau 154


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR

Total Brought Forward LKR ………………

Panel Board
2A/65 Supply and installation of electrical panel
board at pump house with European make
installations and all electrical items including
wiring. Rate shall include for necessary MCB,
RCCB, starter, limit switches, level control
relay, auto/ manual selector switch, push
buttons, thermal overload relays, fault
indicator lamp, surge arrester, buzzer alarm, 1 nr ………… ……………
wall mounted powder coated mild steel sealed
lockable cabin and any other control
equipment incorporated with necessary
wiring.

Main Earthing System


2A/66 Supply and installation of copper clad steel
earth electrodes and provide building earth
with earth resistance complying with IEE
regulations. (16 mm dia. 1.2 m long copper
bonded steel earth driven in to the earth with
clamp connection to earth conductor & 1 nr ………… ……………
accessories. Install concrete earthing pit
chamber with removable reinforced concrete
cover.)

Pipes and Pipes Fittings

Pipe Work
2A/67 Supply and fixing of 63 mm dia uPVC (PNT
11) pipes fixed to wall 7.00 m ………… ……………

2A/68 Supply and fixing of 20 mm dia uPVC (PNT


11) pipes embedded to wall 8.00 m ………… ……………

2A/69 Supply and fixing of 75 mm dia uPVC (PNT


11) pipe fixed to wall as shown in drawing. 3.00 m ………… ……………

2A/70 Supply and fixing of 75 mm dia uPVC (PNT


11) pipe underground. 3.00 m ………… ……………

Central Engineering Consultancy Bureau 155


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………

2A/71 Supply and fixing of 90 mm dia uPVC (PNT


11) pipe fixed to wall as shown in drawing. 44.00 m ………… ……………

2A/72 Supply and laying of 90 mm dia uPVC (PNT


11) pipes underground for compact treatment 2.00 m ………… ……………
plant as shown in drawing.

2A/73 Supply and fixing of 110 mm dia uPVC (PNT


7) pipe fixed to wall as shown in drawing. 22.00 m ………… ……………

2A/74 Supply and laying of 110 mm dia uPVC (PNT


7) pipes in trenches as shown in drawing. 2.00 m ………… ……………

Fittings
Supply and fixing of uPVC pipes fittings

2A/75 63 mm dia. 90° Long Radius Bend 2 nr ………… ……………

2A/76 90 mm dia. 90° Elbow 16 nr ………… ……………

2A/77 90 mm dia. Drainage Tee 1 nr ………… ……………

2A/78 90 mm dia. Equal Tee 3 nr ………… ……………

2A/79 90 mm dia. Puddle Collar 1 nr ………… ……………

2A/80 110 mm dia. 90° Sweep Bend 10 nr ………… ……………

2A/81 110 mm dia. Sweep Tee 16 nr ………… ……………

2A/82 110 mm dia. Puddle Collar 10 nr ………… ……………

Valves
2A/83 Supply and installation of 3"dia DI butterfly
valve 6 nr ………… ……………

Central Engineering Consultancy Bureau 156


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
2A/84 Supply and installation of 4"dia DI butterfly
valve 2 nr ………… ……………

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………

Miscellaneous

2A/85 Supply and installation 90 mm diameter PNT


7 uPVC down pipes 5.00 m ………… ……………

2A/86 Supply and installation cast iron leaf guard


and puddle collar where down pipe start. 1 nr ………… ……………

2A/87 Precast concrete cover slab with 2 nos of mild


steel lifting handles in 800x800 mm sized in
100 mm thick fixed with mastic compound 7 nr ………… ……………
around the cover slab

2A/88 Supplying of all material and constructing


concrete support block inside the tank. 6 nr ………… ……………

2A/89 Supply all material and construct 450 x 450


mm internal sized (depth 600 mm) valve
chamber for inlet line with 100mm thick
Grade 25 (20) reinforced concrete for base,
wall & 100mm reinforced concrete covered
slab cover complete to working order and
directed by Engineer. Rate shall include for
excavation, shoring, dewatering, compacting 4 nr ………… ……………
and preparing surface, backfilling, disposal of
surplus excavated material, 50 mm thick Gr-
15 (25) screed concreting under base slab, r/f
T10 at 150 mm spacing both directions,
formwork etc.

2A/90 Supplying of 1000 ml capacity measuring


cylinder for SVI testing. 1 nr ………… ……………

Central Engineering Consultancy Bureau 157


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill 02 : Construction of Compact Treatment Plant

Rate Amount
Item Description Qty Unit
LKR LKR
2A/91 Supplying and installation of 4.5 m long 2"
dia. GI pipe as support structure for vent pipe.
Rate shall include for necessary bracketing 1 nr ………… ……………
and fixing

2A/92 Supply and installation of plastic bib tap 1 nr 440.00 440.00

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………

2A/93 Supply and installation of 2 no. of 9W LED


bulbs (one inside pump room and other
outside). Rate shall included for necessary 1.00 Item ………… ……………
wiring and switches.

2A/94 Supply and installation of 250 litre capacity


plastic barrel container for chlorine mixing 1 nr ………… ……………

2A/95 Allow for all inspection, water tightness test &


other testing and commissioning of the plant
structure, including all off-site and factory
testing; inspections to demonstrate compliance
with relevant specifications and standards; 1.00 Item ………… ……………
operating the completed installation;
submitting all relevant test record sheets
during the construction phase.

Total of Bill No 2 (Excluding VAT)


2A/- LKR
Carried to General Summary
…………..…..

Central Engineering Consultancy Bureau 158


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill No. 03 Demolision Work

DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA


DEPARTMENT OF NATIONAL ZOOLOGICAL GARDEN
TREATMENT PLANT FOR HIPPOPOTAMUS AREA AT DEHIWALA ZOOLOGICAL GARDEN

Rate Amount
Item Description Qty Unit
LKR LKR

BILL NO. 03 - DEMOLITION WORKS


3A/-

For the full description of materials and


workmanship refer to the relevant sections of
Specifications, and the Drawings.
Note

All Bidders are advised to visit the site and


make careful study of all existing conditions
and the nature and extent of work to be done
under this contract as no extras will be
allowed on the pleace of want of information
due to negligence on their part. Permissions
from the Employer shall be sought prior to
such visits.Those visits all not to be
impediments day to day normal works of site
premises.

Note

All demolished materials, except those


required to be stacked shall be carted away
during the demolition operation without any
disturbance to office Works and it is
prohibited to stack them in external area as
helping to breed mosquitos.Rates should be
included releant transport charges for
removing debris away from site premises.
Note

Building Elements or materials which have a


salvage value in the opinion of the
Employer/Engineer,may carefully
dismentled,labled and stored as directed by the
Engineer which will become the property of
the Employer.

3A/2 Demolishing concrete paved road and clearing


debris away. 30.00 m2 ………… ……………

Central Engineering Consultancy Bureau 158


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill No. 03 Demolision Work

Rate Amount
Item Description Qty Unit
LKR LKR

Total Carried Forward LKR ……………..


Total Brought Forward LKR ………………
3A/3 Demolishing existing concrete super structure
of the toilet and clearing debris away from site
premises, as instructed by the Engineer. 7.00 m3 ………… ……………

3A/4 Demolishing brick walls stacking brick and


clearing debris away.(including all doors,
windows, gate sash, meshes and any other 30.00 m3 ………… ……………
thing connects with brickwork)

3A/5 Demolishing rubble masonry built in cement


and sand, stacking rubble and clearing debris 15.00 m3 ………… ……………
away.

3A/6 Removal of squatting pan, cistern and angle


valve including plugging sewer and water 4 nr ………… ……………
connection.

3A/7 Removal of existing urinal bowl with flush


valves including plugging drainage and water 6 nr ………… ……………
connection.

3A/8 Removal of mirrors, soap dishes, floor gully


covers and any other sanitary fixtures unless 1.00 Item ………… ……………
otherwise measured separately.

3A/9 Removal of existing wash basin with angle


valve and all fittings including plugging 1 nr ………… ……………
drainage and water connection.

3A/10 Removal of existing bib taps including


plugging water connection. 2 nr ………… ……………

3A/11 Removal of hand bidet shower and angle


valve including plugging water connection. 2 nr ………… ……………

3A/12 Demolishing and uprooting manhole and


clearing debris away. 3 nr ………… ……………

3A/13 Demolishing of soakage pit and septic tank


and clearing debris away. 1 nr ………… ……………

Central Engineering Consultancy Bureau 159


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill No. 03 Demolision Work

Rate Amount
Item Description Qty Unit
LKR LKR

Total of Bill No 3 (Excluding VAT)


3A/- LKR
Carried to General Summary …………..…..

Central Engineering Consultancy Bureau 160


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill No. 04 Provisional Sum

DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA


DEPARTMENT OF NATIONAL ZOOLOGICAL GARDEN
TREATMENT PLANT FOR HIPPOPOTAMUS AREA AT DEHIWALA ZOOLOGICAL GARDEN

Rate Amount
Item Description Qty Unit
LKR LKR

4A/- BILL NO. 4 - PROVISIONAL SUM

4A/1 Allow provisional sum for 3 phase electrical


connection to the site P.Sum 180,000.00

4A/2 Allow provisional sum for Water supply


connection to the site P.Sum 200,000.00

4A/3 Allow provisional sum for connection of


effluent path to final disposal system P.Sum 500,000.00

4A/4 Allow provisional sum for necessary storm


water drainage and landscaping around the P.Sum 800,000.00
plant

4A/5 Allow provisional sum for necessary


renovation works for existing rain water P.Sum 600,000.00
disposal system due to construction work

4A/6 Allow Sum for treatment process tune up and


maintenance for 6 months including training P.Sum 750,000.00
of Client's staff for operation work.

4A/7 Allow sum for dewatering during excavation


and other working areas free from ground
water, storm water and percolating water by
pumping or otherwise as approved by P.Sum 500,000.00
Engineer until completion of Works.

4A/8 Allow sum for supplying and placing of


approved quality ABC filling with 95%
compaction under tank for soil improvement
as per Engineer's instructions. (excavation P.Sum 400,000.00
measured separately)

4A/9 Allow sum for uprooting existing trees if it


disturbs construction works as per Engineer's
instructions. Rate shall included for necessary P.Sum 150,000.00
disposal (excavation measured separately)

Central Engineering Consultancy Bureau 160


Treatment plant for Hippopotamus area at Dehiwala Zoological Garden Bill No. 04 Provisional Sum

Rate Amount
Item Description Qty Unit
LKR LKR

Total of Bill No. 04 (Excluding VAT)


4A/- LKR 4,080,000.00
Carried to General Summary

Central Engineering Consultancy Bureau 161