You are on page 1of 79

Quotation for Mr.

Fareed Sahab for Brickwork of Residence at Akbar Bagh


Quantity Rates
Brickwork AAC
AAC Block-4" 0 pcs 45 per Pc
AAC Block-9" 1680 pcs 92 per Pc
Fixoblock 4 Bags 750 per Bag

PW AAC Block 9" 1344 pcs 92 per Pc


Headrrom AAC Block 9" 0 pcs 92 per Pc
Pent House Aac Block 9" 0 pcs 92 per pc
Total for 3 Flats

Plastering-AAC
Cement 124 Bags 330 Per Bag
Fine Sand 36 Tons 1500 per Ton
Total for 3 Flats

Wooden Works
Teak Wood For Door Frames LS
Teak Wood for Window Frames LS
Teak Wood For Door Panels (BT) 14.44 cf 5300 per cf
Teak Wood for Window Shutters (MT) 7.7 cf 3500 per cf
Skinned Doors 20900 LS
Hardware for Doors and Windows 47140 LS

Skinned Doors for Head room, 15000 LS


Penthouse and Lif room

Total for 3 Flats

UPVC Windows Total for 3 Flats

Electrical Works Total for 3 Flats

Plumbing Works
Sewerage & CPVC Pipes
Wall Hung WC (In attached Bathroom) 12000 per pc 1 No's
Indian WC + Flush Tank (Common Bathroom) 4000 per pc 1 No's
Concelaed Tank (In Attached Bathroom) 5000 per pc 1 No's
Wash Basin in Attached Bathroom (Half 10000 per pc 1 No's
Pedestal )
Wash Basin in Common Toilet 5000 per pc 1 No's
Counter Top Wash Basin 4000 per pc 1 No's
Wall Mixer 4500 per pc 2 No's
Basin Mixer 3000 per pc 2 No's
Bottle Trap for Wash Basin
Miscellaneous
Total for 3 Flats

Water Proofing
2 No's Bathroom and utility Area
Total for 3 Flats
Flooring Works
Marble (in Living Room, Bedrooms and 1871 sf 65 per sf
Drawing Room)
Wall and Floor Tile (Utility Area) 0 sf 50 per sf
Wall and Floor Tile (Bathrooms) 0 sf 50 per sf
Kitchen Wall Tiles 0 sf 50 per sf
Granite Top (Kitchen) 0 sf 170 per sf
Granite Flooring ( Kitchen) 0 sf 65 per sf
Granite Top (Basin) 0 sf 65 per sf
Balcony 0 sf 60 per sf
Lobby and Staircase 0 sf 60 per sf
Epoxy 0 units of 5 kg 2800 per 5 kg
Cement For Flooring 77 Bags 300 per Bag
Medium Sand for Flooring 8362 kgs 1500 per Ton
Robo Sand for Flooring 359 cf 20 per cf

Total for 3 Flats


Painting Works
Birla Putty (Internal) 13 Bags 1000 per Bag
Internal Wall Primer 51 Ltr 200 per Ltr
External Wall Primer 90 Ltr 250 per Ltr
Internal Paint 64 Ltr 450 per Ltr

Birla Putty External (Elevation Surface) 0 Bags 1000 per Bag


External Paint (Elevation Surface) 0 Ltr 350 per Ltr
External Paint (Non-Elevation Surface) 90 Ltr 200 per Ltr
Total for 3 Flats

Labour
Civil Works
Plumbing
Electrical
Paint Labour
Internal Putty 14490 sf 6 per sf
Internal Paint 14490 sf 4 per sf
External Putty 0 sf 7 per sf
External Paint (Elevation Surface) 0 sf 5 per sf
External Paint (Non-Elevation Surface) 4253 sf 5 per sf

Flooring Labour
Flooring (Marble & Tile) 5613 sf 22 per sf
Bathroom and Kitchen Tiles 0 sf 22 per sf
Flooring (Granite) 0 sf 25 per sf
Moulding 900 rf 15 per rf
Epoxy 0 sf 6 per sf

Wooden Works Labour


Wooden Works (Door Frames) 3 Flats 10000 LS
Wooden Works (Window Frames) 3 Flats 7000 LS
Wooden Works (Teak Door Panels) 105 sf 200 per sf

Wooden Polish/Paint
Polish (Door Frames) 504.00 rf 90 per rf
Polish (Window Frames) 612.00 rf 90 per rf
Polish (Door Panels) 630.00 sf 90 per sf
Polish Window Shutters 762.00 rf 90 per rf

Miscellaneous items and works


Scaffolding for External Plaster
Site Engineer

Total with Wooden Window Frames

Total with UPVC/Aluminium windows

Including Contractor Charges with Wooden Windows

Including Contractor Charges with UPVC/Aluminium Windows


Sahab for Brickwork of Residence at Akbar Bagh

0 INR
154560 INR
3000 INR
Sub Total 157560 INR
123648 INR
0 INR
0
Total for 3 Flats 596328 INR

40920 INR
54000 INR
Total for 3 Flats 94920 INR

80162 INR
57731 INR
76532 INR
26950 INR
20900 INR
47140 INR

Sub Total 309415 INR


15000 INR

Total for 3 Flats 943245 INR

Total for 3 Flats 203520 INR

Total for 3 Flats 300000 INR

50000 INR
12000 INR
4000 INR
5000 INR
10000 INR
5000 INR
8000 INR
9000 INR
6000 INR
3600 INR
6500 INR
Sub Total 119100 INR
Total for 3 Flats 357300 INR

12000 INR
Total for 3 Flats 36000 INR

121615 INR

0 INR
0 INR
0 INR
0 INR
0 INR
0 INR
0 INR
0 INR
0 INR
23100 INR
12543 INR
7180 INR
Sub Total 157258 INR
Total for 3 Flats 471774 INR

13000 INR
10200 INR
22500 INR
28800 INR
Sub Total 74500 INR
0 INR
0 INR
18000 INR
Total for 3 Flats 241500 INR

789100 INR
82000 INR
78000 INR

86940 INR
57960 INR
0 INR
0 INR
21265 INR
Sub Total 166165 INR

123486 INR
0 INR
0 INR
13500 INR
0 INR
Sub Total 136986 INR

30000 INR
21000 INR
63000 INR
Sub Total 114000 INR

45360 INR
55080 INR
56700 INR
68580 INR
Sub Total 225720 INR

75000 INR
100000 INR
51000 INR
Total 1817971 INR

Total with Wooden Window Frames 4859038 INR

Total with UPVC/Aluminium windows 4609765 INR

+7% 5199171 INR

+7% 4932449 INR


Total Amount for Brickwork, Plaster, Electrical Conduiting, Plumbing, door and window frames

Window Frames in Teak Wood 5199171 INR

With Aluminium/UPVC windows Err:509 INR


ndow frames
1) Material-RCC Works
Columns 18.0918 m3
Beams 26.6 m3
Slabs 41.1 m3 16.17
Footings 38.768 m 3

124.5598 m3 2.94

Wet 133.279 m3 84.672


Volume
Dry 205.2496 m3
Volume

Cement FA CA 13554.6
Design Mix 1 1.5 3

Volume/Quantity Rate/unit
Cement= 37.4 m3 1078 bags 330 per Bag ₹ 355,740.00
Fine aggregate = 56 m3 108 tons 1300 per Ton ₹ 140,400.00
Coarse aggregate = 112 m3 3953 f3 23 per cf ₹ 90,919.00

Total Steel = 10602 kg 39 per kg ₹ 413,478.00

2) Labour-RCC Works
Total Centering Area = 3534 f2 70 per f2 ₹ 247,380.00

3) Miscellaneous
Miller, Vibrator etc = 5 Slabs 6000 per Slab ₹ 30,000.00
Engineering Charges ₹ 60,000.00
Miscellaneous Labour = ₹ 20,000.00
Total ₹ 1,357,917.00
SUMMARY

RCC Quantity Rates


a) Concrete 138 m3 4200 /m3

Steel 7951.5 kg 42 per kg


Shuttering Area 3534 f2 70 per sf
Excavation NA NA
Miller 6 Slab 8500 per Day
Labour 12400 sf 10 per Sf
Sub-Total

Brickwork & Plastering


Bricks 1120 pcs 5.5 per Pc
Cement 24 Bags 330 per Bag
Medium Sand 4 Tons 1500 per Ton
Fine Sand 3 Tons 1800 per Ton
Sub-Total

Wooden Works
Teak Wood 21.5 cf 5500 per cf
6" Butt Hinge (Main Door) 3 No's 650 per Hinge
6" Butt Hinge (Internal Door) 21 No's 280 Per Hinge
Main Door Lock 1 No's 5900 per Lock
Main Door Handle 1 No's 1500 per Handle
Main Door Tower Bolt 1 No's 300 per Handle
Internal Door Lock
Internal Door Handle 3 No's 900 per Handle
Internal Door Tower Bolt 6 No's 200

Electrical Works
PVC pipes
GI boxes
Electrical Wires
Electrical Switches
Electrical Geyser

Plumbing Works
Sewerage Pipes
CPVC pipes
Wall Hung WC
Concelaed Tank
Half Pedestal Basin
Diverter + Spout + Rain Shower + Basin Mixer
Miscellaneous
Shower Enclosure

Water Proofing
Bathroom
Terrace 12400 sf 30 sf

Flooring Works
Flooring Tiles 1870 sf 65 per sf
Wall Tile 0 sf 80 per sf
Epoxy 0 units of 5 kg 4400 per 5 kg
Cement For Flooring 77 Bags 330 per Bag
Medium Sand for Flooring 27871 kgs 1300 per Ton

Painting Works
Birla Putty 13 Bags 1000 per Bag
Asian Putty 13 Bags 1250 per 20 Kg
Internal Wall Primer 51 Ltr 210 per Ltr
External Wall Primer 90 Ltr 115 per Ltr
Internal Paint 64 Ltr 400 per Ltr
External Paint 0 Ltr 280 per Ltr

Labour
Civil Works 12400 sf 180 per sf
Plumbing
Electrical
Internal Paint 4600 sf 10 per sf
External Paint 4050 sf 3 per sf
Flooring 1760 sf 17 per sf
Wall Tiles 0 sf 25 per sf
Skirting 330 rf 17 per rf
Epoxy 1760 sf 7 per sf
Wooden Works (Frames) Err:508 rf 200 per rf
Wooden Works (Panels) 0 sf 200 per sf
Polish 224.44 sf 90
579600 INR

333963 INR
247380 INR
25000 INR
51000 INR
124000 INR
1497037 INR 120.7288

6160 INR
7920 INR
6000 INR
5400 INR
25480 INR

0 INR 150000
0 INR 77400
0 INR
0 INR
0
0
0 18140
0
0

20000
10000
0

20000
15000
5000
15000
16000
5000
0

10000 INR
5000 INR

123500 INR
0 INR
0 INR
25410 INR
36400 INR

13000 INR
0 INR
10710 INR
10350 INR
25600 INR
0 INR

2232000 INR 5697361 5088510


15000 INR 80000 70000
20000 INR 80000
46000 INR 20000
12150 INR 5268510
29920 INR 5258510
0 INR 5795361
5610 INR
12320 INR
0 INR
0 INR
20199.6 INR

18200
3000

21200
1360943 4536.477

1932
Rates

Item Rate Qty


Bricks 7.5 per pc
Cement for RCC 330 per Bag
Cement for Brickwork etc 300 per Bag
Medium Sand 1500 per Ton
Fine Sand 1800 Per Ton
Robo Sand 1000 per Ton
Bitumen
Coarse Aggregate 23 per cf
Steel 42 per kg
Birla Putty 1000 per Bag
Asian Acrylic Putty 1250 per 20 kg
Internal Primer 4200 20 Ltr
External Primer 2300 20 Ltr
Internail Paint 560 per Ltr
External Paint 280 per Ltr
Teak Wood 5500 per cf
Epoxy SP-100 Laticrete 4400 per 5 kg
6" Butt Hinge (Magnum) 650 per Hinge
6" Butt Hinge (RajaBadri) 280 per Hinge
Europa Main Door Lock with handle 5900 per Lock
AAC block -4" 40 per pc
AAC block -8" 75 per pc
Fixobloack 750 per 40 kg Bag
Indian Teak (BT) 5400 per cf
Indian Teak (MT) 3400 per cf
African Teak 1800 per cf
M10
M15
M20 4200
M25
Material

Doors

Thickness of Frame
Door Type Size - H x W (ft) No. of Jambs Door Sill (in)

Main Door 7 3.5 2 1 5


Internal Door 7 3 2 0 4
Bathroom Door 7 2.5 2 0 4
Kitchen Balcony Door 7 2.5 2 1 4
Living Room Balcony 7 8 4 1 4
Door

Total Length of 4" x 3" Frames = 168.00 f


Total Length of 5" x 3" Frames = 44.00 f

Total Cost = 80162

Total vol of 1.25" Panel = 14.44

Skin Doors 84 3
52.5 2.5

Window Frames

Thickness of Frame
Size - H x W (ft) No. of Jambs No. of Sills (in)

Big Window 4.5 6 4 2 4


Small Window 4.5 2 2 2 4
Kitchen Window 2.5 4 2 2 4
BathRoom Ventilators 2.5 2 2 2 4

Total Cost = 57731


W H Price No's
Skin Doors 7 3 5000 4
Skin Doors 7 2.5 300 3

TOTAL 20900

No's required per No of


Price
Hardware Door Doors
Hinges for MD 280 3 2
Lock and Handle for Main Door 6000 1 2
Hinges for Internal Doors 280 3 9
Tower bolts for Main Door 1200 2 2
Tower Bolts for Internal Doors 200 1 9
Hinges for windows 200 2 14
Tower bolt for Windows 100 2 14
Handles for Internal Doors 900 1 9
Handles for Windows 200 1 14

total

Window Frames
Size - H x W (ft) No. of Frames
Big Window 4.5 6 3 81
Small Window 4.5 2 3 27
Kitchen Window 2.5 4 1 10
BathRoom Ventilators 2.5 2 2 10

128
Thickness of Frame Total Running Feet Volume of Wood No. of
% of Wastage Material
(in) (cft) Frames

3 22.00 2.3 15 2 Indian Teak (BT)


3 17.50 1.46 15 4 Indian Teak (MT)
3 17.00 1.42 15 2 Indian Teak (MT)
3 20.00 1.67 15 1 Indian Teak (MT)
3 44.00 3.67 15 1 Indian Teak (MT)

4" x 3" 168.00


5" x 3" 44

7 4
7 3

Thickness of Frame Total Running Feet Volume of Wood No. of


% of Wastage Material
(in) (cft) Frames

2.5 36.50 2.54 15 3 Indian Teak (MT)


2.5 16.75 1.17 15 3 Indian Teak (MT)
2.5 18.75 1.31 15 1 Indian Teak (MT)
2.5 12.75 0.89 15 2 Indian Teak (MT)

4" x 2.5" 204.00


Total

1680
12000
7560
4800
1800
5600
2800
8100
2800

47140
Cost of
Cost per cft Final Volume Labour per Frame Panel Size
Material

5400 5.29 600 28566 7 3.5


3200 6.716 400 21492 0 0
3200 3.266 400 10452 0 0
3200 1.9205 400 6146 0 0
3200 4.2205 3000 13506 7 8

21.5 7000 80162

Cost of Shutter Size (in) total length of


Cost per cft Final Volume Labour per Frame Frame shutter (f)

3200 8.763 1000 29842 3 189


3200 4.0365 500 14717 3 39
3200 1.5065 400 5421 3 26
3200 2.047 300 7751 0

16.353 5500 57731 254


Thickness of Panel Volume of No. of sides for Polish length Polish
Area of Panel (sft)
(in) Wood (cft) Polish (ft) Area (ft2)

1.5 24.5 6.74 2 42 98


0 0 0 2 68 0
0 0 0 0 33 0
0 0 0 2 19 0
1.5 56 7.7 2 44 112

105 14.44 210

No. of Shuuters Thickness of Shutter % of Wastage

3 1.25 15 5.66015625
1 1.25 15 1.16796875
2 1.25 15 0.7786458333
15

7.7
No. of
Butt Labour
Hinges
3 2000
3 1500
3 1500
3 1500
12
5000

42930 81
14310 27
5300 10
5300 10

67840
Brickwork and Plaster

Beam No. of sides


L (f) H (f) T(f) Volume (f^3)
Depth (f) plaster

9" Wall 15 10 0.75 0.75 2 105


Bathroom Wall 9" 0 10 0.75 0.75 2 0
Internal Walls 4" 0 10 0.33 0.75 2 0
PW 0 3.34 0.75 1.00 2 0
Ceiling Plaster

Head Room 0 13 0.75 1.00 2 0


PentHouse 0 10 0.75 0.75 2 0

Total
Volume of Mortar Required
Type of No.of AAC No. of Bags of No. of Cement Bags
for Rough Plaster (f^3)-AAC
Brick Blocks Fixo Block for Rough Plaster-AAC
block
RCB 1680 2.2 11.82 2.05
RCB 0 0 0 0
RCB 0 0 0 0
RCB 0 0 0 0
94 16.24

AAC-9 0 0 0 0
AAC-9 0 0 0 0

AAC-9 1680 3 18.29


AAC-8 0
AAC-6 0
AAC-4 0
RCB 1344
Wt of Sand for Volume of Mortar Required No. of Cement Bags
Rough Plaster (kgs)-AAC for Fine Plaster (f^3)-AAC for Fine Plaster-AAC

680.65 5.91 1.54


0 0 0
0 0 0
0 0 0
5412.91 32 8.3

0 0 0
0 0 0

6093.56 9.84
Wt of Sand for Surface
Fine Plaster (kgs)-AAC Area (f2)

306.29 300
0 0
0 0
0 0
1658.43 1575

0 0
0

1964.72 3315

0 0
Flooring & Wall Tiles
Epoxy /Grout
Floor Wall Area Skirting Length Flooring Spacer Coverage
Area (f2) (f2) (f) Material (mm)
(f2/5kg)
Living Room 1600 0 300 Indian Marble 0 300
Master Bedroom 0 0 0 Indian Marble 0 300
Attached Bathroom 0 0 0 Tiles 2 300
Bedroom-1 0 0 0 Indian Marble 0 300
Bedroom-2 0 0 0 Indian Marble 0 300
Drawing Room 0 0 0 Indian Marble 0 300
Kitchen 0 0 0 Granite 2 300
Kitchen Granite 0 0 0 Granite 0 300
Kitchen Dadoing 0 0 0 Tiles 2 300
Common Bathroom 0 0 0 Tiles 2 300
Counter Top 0 0 0 Granite 0 300
Utility Area 0 0 0 Tiles 2 300
Balcony 0 0 0 Granite 0 300
Lobby 0 0 0 Granite 0 300
Staircase 0 0 0 Granite 0 300
0

Total 1760 0 330

1900
0

Labour Rate /Sf Grinding Rounding


Area Material Material Length Labour/rf
Total Cost Rate/sf
Living Room 1871 65 Indian Marble 22 300 22
Master Bedroom 0 65 Indian Marble 22 0 22
Attached Bathroom 0 65 Tiles 25 0 22
Bedroom-1 0 65 Indian Marble 22 0 22
Bedroom-2 0 65 Indian Marble 22 0 22
Drawing Room 0 65 Indian Marble 22 0 22
Kitchen 0 65 Granite 30 0 22
Kitchen Granite 0 65 Granite 30 0 22
Kitchen Dadoing 0 65 Tiles 25 0 22
Common Bathroom 0 65 Tiles 25 0 22
Counter Top 0 65 Granite 30 0 22
Utility Area 0 65 Tiles 25 0 22
Balcony 0 65 Granite 30 0 22
Lobby 0 65 Granite 30 0 22
Staircase 0 65 Granite 30 0 22
0 0
0
0
Epoxy Thickness of Volume of Mortar (f^3) No. of Cement Bags
Required (5 Volume (f^3)
Mortar (in) for Flooring for Flooring
kg units)
0 3 440 440 77
0 3 0 0 0
0 5 0 0 0
0 3 0 0 0
0 3 0 0 0
0 3 0 0 0
0 3 0 0 0
0 1.25 0 0 0
0 1.25 0 0 0
0 5 0 0 0
0 1.25 0 0 0
0 5 0 0 0
0 3 0 0 0
0 3 0 0 0
0 3 0 0 0

0 440 77

23100

169377
0
0
0
0
0
0
0
0
0
0
0
0
0
0
169377
105.860625
Wt of Sand for Surface Round/C
hamfer
Flooring(kgs) Area (f2) Length

27871 1871 300 1871


0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 10
0 0 0
0 0 0
0 0 0
0 0 102.41

27871 1871 412.41

41806.5 18.71

14.5161458333 5613

512.2392509333
#REF!

72000

#REF!

#REF! #REF!

#REF! #REF!
Brickwork and Plaster

No. of sides No. of sides for No. of Sides for


L (f) H (f) for putty
(Internal) putty (External) Internal Paint

Living Room 120 10 1 0 1


Master Bedroom 0 10 1 0 1
Attached Bathroom 0 3 1 0 1
Bedroom-1 0 10 1 0 1
Bedroom-2 0 10 1 0 1
Drawing Room 0 10 1 0 1
Common Bathroom 0 3 1 0 1
Utility Area 0 10 1 0 1
Lobby & Staircase 0 10 1 0 1
Ceiling 0
External Paint with Putty 0 60 0 1 0
Extenal Paint without Putty 90 45 0 0 0

Total

Internal Surface Area for Putty = 4830


External Surface Area for Putty = 0
Internal Surface Area for Paint = 4830
External Surface Area for Paint 0
(Elvation Surface) =
External Surface Area for Paint 4253
(Non-Elevation Surface) =

No. of Bags of Birla Putty (Internal) = 13


No. of Bags of Birla Putty (External) = 0
No. of Bags of Asian Acrylic Putty = 13
No. of Liters of Internal Wall Primer = 51
No. of Liters of External Wall Primer = 90
No. of Liters of Internal Paint = 64
No. of Liters of External Paint (Apex)= 0
No. of Liters of External Paint (Ace)= 90
Interior
Surface Area Surface Area Quantity of Quantity of Quantity of
No. of Sides for Surface
for Putty for Putty Birla Putty- Birla Putty Asian Putty
External Paint Area for
Internal (f2) External (f2) Internal (kg) -External (kg) (kg)
Paint (f2)
0 3000 0 300 0 150 3000
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
1600 160 0 80 1600
1 0 0 0 0 0 0
1 0 0 0 0 0 0

4600 0 460 0 230 4600

f2
f2
f2

f2

f2

Bags
Bags
Bags
ltr
ltr
ltr
ltr
ltr
External
Surface Quantity of Quantity of Quantity of Quantity of
Area of Internal External Internal External Paint
Primer (ltr) Primer (ltr) Paint (ltr) (ltr)
Paint (f2)
0 30 0 38 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
16 0 20 0
0 0 0 0 0
4050 0 81 0 81

4050 50.6 89.1 63.8 89.1


Putty
1) Material
Columns 18.1 m3
Beams 26.6 m3
Slabs 41.1 m3
Footings 38.8 m3
124.6 m3

Percentage of Wastage = 10%

Wet Volume 138 m3

Grade of Concrete = M20

Volume/Quantity Rate/unit
Wet Volume of Concrete 138 m3 4200 /m3 ₹ 579,600.00

Total Steel = 7951.5 kg 42 /kg ₹ 333,963.00

2) Labour
Total Centering Area = 3712 f2 70 /f2 ₹ 259,840.00

3) Miscellaneous
Miller, Vibrator etc = 6 Slabs 8500 per Slab ₹ 51,000.00
Soil Testing = 1 Bore Hole 5000 per bore Hole ₹ 5,000.00
Solyseal WaterProofing = 0 Ltr 4500 per 20 Ltr ₹ 0.00
Engineering Charges = ₹ 60,000.00
Miscellaneous Labour = ₹ 124,000.00
Total ₹ 1,413,403.00

₹ 113.98
Labour 180000
Brickwork 264000
Paint 160000
RCC 432000
Tiles 64800 36000
Tiles Labour 24480 28800
Tiles Mortar 34000
RMS 50000
plumbing 40000
Plumbing Material 60000
Electrical Material 50000
Electrical Charges 25000 1728000
1440

Carpenter
Material frame 37000
Frame Labour 3850
Doors 29106.25
Hinges 11172
Windows 8750
Panels 14062.5 43200 0.3125

937.5
36000

4 3

937.5

1760000 1222.222
=
Volume of one RCB
Size of RCB L B H
9 4.5 3

Volume of RCB 0.0703125 f3

L B H
AAC-9 24 9 8 1.00000 f3
AAC-8 24 8 8 0.888889 f3
AAC-6 24 6 8 0.666667 f3
AAC-4 24 4 8 0.444444 f3
RCB 9 4 3 0.0625 f3

Paint

Luxury Emulsion Luxury Emulsion - 400 Apex


Shyne Royal Shyne - 520 Apex
Atmos Royal Atmos - 560 Apex
Ace

Flooring
Indian Marble
Tiles
Granite
Italian Marble
Quartz
Polish Stone
No. of sides for plaster Wall Thickness (mm) Brick Type

Density (kN/m3)
2 230 19
1 115 12
200 12
100
Fixoblock coverage
70
80
130
170

Design Mix
M10
Ultima - 375 M15
Ultima Protek - 460 M20
Apex Emulsion - 280 M25
Ace Emulsion - 200
Stirrup Bar Dia Long Bar Grade of Grade of
Brick Type (mm) Dia (mm) Concrete Steel
Density (kN/m3)
RCB 6 10 M20 Fe415
AAC-8 8 12 M25 Fe500
AAC-4 10 16 M30
12 20 M35
25 M40
32
Grade of Concrete = M20 Total Wt of Steel in Columns=
Grade of Steel = 500 N/mm2 Volume of Concrete in Columns =

H1 V1 H2 V2 Area (m2)

C1 10 15 10 15 13.95
C2 0 0 0 0 0
C3 0 0 0 0 0
C4 0 0 0 0 0
C5 0 0 0 0 0
C6 0 0 0 0 0

Slab Thickness 125 mm

Min Ast Load Carrying


Column ID Ultimate Load (kN) b (mm) d (mm) (mm2) Capacity (kN)
C1 1295 230 450 828 1269
C2 0 0 255
C3 0 0 0 0 278
C4 0 0 0 0 278
C5 0 0 0 0 51
C6 0 0 0 0 51

SBC = 250 kN/m^2

L (f) B (f) d (in) Reqd Area (m2)

F1 6 6 24 3.46
F2 0 0 0 0
F3 0 0 0 0
F4 0 0 0 0
F5 0 0 0 0
F6 0 0 0 0
8

2.539683

Concrete

0 23.4235574063 0 23.4235574
of Steel in Columns= 2889.2 kg
of Concrete in Columns = 18.1 m3

Dead Load SDL Wall Height Brick Type Wall (mm)


Thickness
Tributary Length (ft)
(kN/m2) (kN/m2) (ft)

25 4.375 2.5 10 AAC 200


0 4.375 2.5 10 RCB 230
0 4.375 2.5 10 RCB 230
0 4.375 2.5 10 RCB 230
0 4.375 2.5 10 RCB 230
0 4.375 2.5 10 RCB 230

33000

No.of Middle Bar No.of Area of Rebar


Height of Column (m) Corner Bar Dia Corner Bars Dia Middle Bars (mm2)
9.2 20 4 16 6 2463.1
10 12 4 10 2 609.5
6.4 12 4 12 2 678.6
6.4 12 4 12 2 678.6
6.4 12 4 12 4 0
6.4 12 4 12 2 0

12 dia 739.2 m 2.45398773 1813.9877301


10 dia 1048.8 m 1.570552147 1647.195092
8d dia 1189 m 0.392638037 466.84662577

Vol of
Concrete No. of
Provided Area (m2) Safety Weight (kg) Footings
(m3)
3.35 UNSAFE 38.768 3876.8 19
0 UNSAFE 0 0 0
0 UNSAFE 0 0 0
0 UNSAFE 0 0 0
0 UNSAFE 0 0 0
0 UNSAFE 0 0 0

38.768 3876.8

442

432000
58558.8935157645 10647.0715

212.941431 15970.60732 31941.2146

63882.4293 23955.91098 15970.6073 129600


No. of
Wall (kN/m) Live (kN/m2) Load due to Single Allowable Load
Storey's No. of Columns
Storey (kN) (kN)
Above
55.8 1.5 172.63125 5 863.15625 24
0 1.5 0 1 0
0 1.5 0 1 0
0 1.5 0 1 0
0 1.5 0 1 0
0 1.5 0 1 0

904
495.15

Weight of Wt of Volume of
Safety Dia of Stirrup No. of Columns
Steel (kg) Stirrups (kg) Concrete (m3)
SAFE 2348 8 494.2 18.0918 19
SAFE 47 8 0 0 0
SAFE 0 8 0 0
SAFE 0 8 0 0
SAFE 0 8 0 0
SAFE 0 8 0 0

2395 494.2 18.0918

684 423.884514 1107.884514 102.98 34.3266666667


0 0

79200
% of Steel

2.4
Slab Area Total Slab Area= 12400

length = 57 f Breadth = 31 f
Area = 1767 sf No. of slabs = 2
Thickness = 125 mm

Volume of Concrete = 41.1 m3

Wt of Steel = 2466 kg

Beams
Vol of Wt of Wt of
L (f) b(f) d(f) Qty concrete Longitudinal Transverse
(m3) Steel (kg) Steel (kg)
B1 56 0.75 1.5 3 5.356 535.6 336
B2 31 0.75 1.5 5 4.942 494.2 310
B3 11 0.75 1 0 0
B4 11 0.75 1 0 0

9.84 1029.8 646

Total 19.68 3351.6

16 51.21951 402.2146
16 47.2561 371.0908
0
403 1176.305
sf

0.410105 3534
328.4875

109.9387

Plinth Beams
Vol of Wt of Wt of
L (f) b(f) d(f) Qty concrete Longitudinal Transverse Steel
(m3) Steel (kg) (kg)
B1 56 0.75 1 3 3.571 357.1 336
B2 31 0.75 1 5 3.295 329.5 310

6.87 686.6 646

Total 6.87 1332.6


Plan Area = 2200 sf
No. Of Floors = 1
Penthouse = 1100 sf

Total Area = 3300 sf

No. of Cement Bags per sf = 0.4 bags


Volume of Sand per sf = 1.8 cf
Volume of CA per sf = 1.35 cf
Weight of Steel required per sf = 2.5 kg

Total Bags of Cement = 1320 Bags


Total Vol. Of Sand = 5940 cf
Total Vol. of CA = 4455 cf
Total wt of Steel = 8250 kgs
Slab Area = 2200 sf
Slab Thickness = 150 mm
Total Slab Area = 12396 sf
Column Sizes = 230 mm x 450 mm
No of Columns = 24 nos
Length of Columns = 21.4 m
Footing Size = 1.8 m x 1.8 m
Thickness of Footing = 0.45 m
Length of Beam = 731 m
Length of Plinth Beam = 131 m

Slab Concrete quantity = 184.9307 m3


Beam Concrete = 80.9546 m3
Column Concrete = 56.87863 m3
Plinth beam concrete = 9.67173 m3
Footing Concrete = 34.992 m3

Total = 367.4276 m3 498

Steel Quantity = 30990 kgs

Readymix Concrete = 1620356 INR

Steel = 1301580 INR

Centering = 743760 INR

3665696

295.716

Bricks = 114000 Bricks' 798000


Cement =
RCC 350
Labour 150
Super Structure 450
Flooring 120
Bathroom Tiles Polish 30

5500

0.083333

1.416667

7650

2.1875

90.54545 130385.454545455 2607.709 12031.25

25881.25

1232.44

6200

15.98751

4.573171 3.658537

16.73111

DLS 52.28473
DLB 21.29954
LL= 25.09667
SC 55.3725
154.0534
924.3206
rcc 450
labour 130
70
100
35
35
30
75
190000

69.23077
937.5 4

d= 400 m
b0= 2520 m
Phi = 0.85

U= 1201.11
Fourth Floor

RCC 375 2300


Labour 130
Super Structure 375 19.5652173913
Flooring Material 110
Bathroom Tiles 25
grouting in Tiles 25
Tiling Labour 25
Flooring Sheets 10 Scaffolding etc 20
Painting 75 Carpentry 150
Plumbing 150
Electrical 50 520000
Lifing 50
Misc 25

1425 4760000

1,2 & 3 Floors


RCC 350
Labour 130
Super Structure 375
Flooring Material 75
Bathroom Tiles 20
grouting in Tiles 15
Tiling Labour 25
Flooring Sheets 0
Painting 55
Plumbing 110
Electrical 40
Lifing 50
Misc 25

1270 7920000

Stilit
RCC 375
Sumps Boundary etc 200
Labour 50
Flooring 50

675 1430000
Main Door 54142 54142
Internal Doors 16880 9 151920
Bathroom Doors 16307 6 97842
Windows 23536.67 10 235366.7
Ventilator 3500 6 21000

560270.7

0.083333
28

2.333333
255000
12833.33 10
0.020833

0.208333 1145.833

4583.333
840406 305000

247.1782 480000

785000
Standard Material Consumption on Builtup Area Bas

S.No. Material Item of Work Quantity per Sf

Cement For RCC 0.19


For Masonry 0.08
For Plastering 0.15
For Other Works 0.03

Steel For RCC Work 2.25

Sand For RCC work 0.75


For Masonry Work 0.36
For Internal Plaster 1
For External plaster 0.65
For Tiling 0.13
For Waterprrofing 0.09
For Others 0.02

Metal For RCC Work 0.9

Rubble For Plinth Soiling 0.2

Murum For Plinth Filling 0.75

Bricks For Plinth Work 4


For External Wall 8
For Internal Wall 4
Standard Material Consumption on Builtup Area Basis

Sf

12400 2356 bags


12400 992 bags 310 307520
12400 1860 bags 310 576600
12400 372 bags 310 115320

12400 27900 kgs

12400 9300 cf
3400 1224 cf 85 104040
3400 3400 cf 100 340000
3400 2210 cf 100 221000
3400 442 cf 85 37570
3400 306 cf 85 26010
3400 68 cf 85 5780

12400 11160 cf 23 256680

12400 2480 cf

12400 9300 cf 30 279000

12400 49600 No's 6.5 322400


3500 28000 No's 6.5 182000
3500 14000 No's 6.5 91000

91600 No's 2006840

161.8419
0.520833 18.37893

81.61518

97.93822

7650

420750
Flooring 160 rs/sf 240000
Putty 88 rs/sf 132000
main Door 25000 25000
Windows 350 rs/sf 56700
False Ceiling 60 rs/sf 90000
Bathrooms 60000 per bathroom 240000
demolition 50000 50000

833700

555.8