EXPLANACIONES

AREAS (m 2) VOLUMEN VOLUMEN


Estaca Distancia (m) CORTE (m 3) RELLENO (m 3)
Corte Relleno
Total Corte Total Relleno

0+000.00 3.670 0.00


0+020.00 4.560 0.00 20.00 82.30 0.00
0+040.00 2.780 0.00 20.00 73.40 0.00
0+060.00 3.670 0.00 20.00 64.50 0.00
0+080.00 5.800 0.00 20.00 94.70 0.00
0+100.00 5.600 0.00 20.00 114.00 0.00
0+120.00 5.700 0.00 20.00 113.00 0.00
0+140.00 4.890 0.00 20.00 105.90 0.00
0+160.00 4.760 0.00 20.00 96.50 0.00
0+175.76 4.080 0.00 15.76 69.66 0.00
SUB TOTAL 813.96 0.00

RELLENO CON MATERIAL PROPIO - m3


TOTAL DE CORTE DE MATERIAL SUELTO 813.96 m 3
MAS ESPONJAMIENTO 1,017.45 m 3

CARGUIO DE MATERIAL EXCEDENTE 10.00 10,174.49


TRANSPORTE DE MATERIAL EXCEDENTE 15.00 15,261.74
TOTAL S/. 25,436.23
ENCOFRADO DE SOBRECIMIENTO 2.00 0.60 0.40 0.48 m2

CANTIDAD LONGITUD DESPERDICIO


N° P2/N° DE
DESCRIPCION SECCION DE N° DE USOS P2/U.M
ELEMENTO ML PIES 2 10% USOS
ELEMENTOS
1 Tablones 1'' 8'' 4.00 0.60 5.25 5.78 14 0.41 0.85
2 Soleras 2'' 4'' 2.00 0.60 2.62 2.88 10 0.29 0.60
3 Barrotes 2'' 3'' 2.00 0.50 1.64 1.80 14 0.13 0.27
4 (a) Tornapunta 2'' 3'' 2.00 0.50 1.64 1.80 7 0.26 0.54
4 (b) Tornapunta 2'' 3'' 2.00 0.64 2.10 2.31 7 0.33 0.69
5 Estacas 2'' 2'' 2.00 0.60 1.31 1.44 6 0.24 0.50
TOTAL 3.45 p2

METRADO 1,550.70 5,349.92 p2


P2 MADERA 4.00 21,399.66 Soles
1500 372.4 0.0220
2500 0.0200 0.002
4000 280
240
16.6666667
92.4

PEON OPE OFI


2800 239 231 464 232
-16 7 -1
2784
1200 245513.12

1100 249646.57 750 800


249691.57
-45
516.49
747.28 -561.49 77
1308.77

30.48
RELACION DE INSUMOS
I.U. Nombre I.U. Recurso Und Cantidad Precio S/.
MANO DE OBRA
47 MANO DE OBRA INC. LEYES SOCIALES OPERARIO hh 5,200.00 19.18
47 MANO DE OBRA INC. LEYES SOCIALES OFICIAL hh 4,800.00 15.90
47 MANO DE OBRA INC. LEYES SOCIALES PEON hh 9,000.00 14.30

MATERIALES
02 ACERO DE CONSTRUCCION LISO ALAMBRE NEGRO RECOCIDO N° 16 kg 350.00 2.97
02 ACERO DE CONSTRUCCION LISO ALAMBRE NEGRO RECOCIDO N° 8 kg 200.00 2.97
03 ACERO DE CONSTRUCCION CORRUGADO ACERO CORRUGADO PROMEDIO kg 3,500.00 3.22
05 AGREGADO GRUESO PIEDRA CHANCADA DE 1/2" - 3/4" m3 2,000.00 50.85
04 AGREGADO FINO ARENA GRUESA m3 1,000.00 46.61
05 AGREGADO GRUESO MATERIAL DE CANTERA P/SUB BASE m3 3,000.00 27.12
21 CEMENTO PORTLAND TIPO I CEMENTO PORTLAND TIPO I (42.5KG) BOL 15,000.00 17.21
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. MADERA TORNILLO p2 7,900.00 3.39
53 PETROLEO DIESSEL PETROLEO gln 780.00 8.73
54 PINTURA LATEX PINTURA ESMALTE gln 10.00 25.42
02 ACERO DE CONSTRUCCION LISO CLAVOS C/C 1/2" kg 60.00 2.97
02 ACERO DE CONSTRUCCION LISO CLAVOS C/C 2 1/2" kg 60.00 2.97

EQUIPOS
37 HERRAMIENTA MANUAL MIRA Y JALON HE 400.00 4.77
37 HERRAMIENTA MANUAL HERRAMIENTAS MANUALES %MO
48 MAQUINARIA Y EQUIPO NACIONAL MEZCLADORA DE CONCRETO DE 9 -11P3 hm 1,500.00 21.19
48 MAQUINARIA Y EQUIPO NACIONAL VOLQUETE 15 M3 hm 500.00 120.00
49 MAQUINARIA Y EQUIPO IMPORTADO COMPACTADOR VIBR. TIPO PLANCHA 7 HP hm 5,000.00 16.95
49 MAQUINARIA Y EQUIPO IMPORTADO CARGADOR FRONTAL S/LLANTAS 125-155 hm 150.00 150.00

COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 5%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
RELACION DE INSUMOS
Parcial S/.

99,736.00
76,320.00
128,700.00
304,756.00

1,039.50
594.00
11,270.00
101,700.00
46,610.00
81,360.00
258,150.00
26,781.00
6,809.40
254.20
178.20
178.20
534,924.50

1,908.00
9,142.68
31,785.00
60,000.00
84,750.00
22,500.00
210,085.68
1,049,766.18
104,976.62
52,488.31
1,207,231.11
217,301.60
1,424,532.71
Indice Descripción Parcial S/. % Inicio Agrupamiento Factor

02 ACERO DE CONSTRUCCION LISO 1,989.90 0.165%


1.098% 0.011
03 ACERO DE CONSTRUCCION CORRUGADO 11,270.00 0.934%
04 AGREGADO FINO 46,610.00 3.861%
19.025% 0.190
05 AGREGADO GRUESO 183,060.00 15.164%
21 CEMENTO PORTLAND TIPO I 258,150.00 21.384% 0.214
37 HERRAMIENTA MANUAL 11,050.68 0.915% 0.009
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 157,464.93 13.043% 0.130
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 26,781.00 2.218% 0.022
47 MANO DE OBRA INC. LEYES SOCIALES 304,756.00 25.244% 0.252
48 MAQUINARIA Y EQUIPO NACIONAL 91,785.00 7.603%
16.487% 0.165
49 MAQUINARIA Y EQUIPO IMPORTADO 107,250.00 8.884%
53 PETROLEO DIESSEL 6,809.40 0.564%
0.585% 0.006
54 PINTURA LATEX 254.20 0.021%
1,207,231.11 100.00% 100.00%
### 1

Factor
Monomio Descripción Factor (%) Símbolo Indice
Acumulado
1 MANO DE OBRA INC. LEYES SOCIALES 0.252 0.252 100.00% J 47
2 MADERA NACIONAL PARA ENCOF. Y CARPINT. 0.022 9.17% 43
CEMENTO PORTLAND TIPO I 0.214 0.242 88.41% CMP 21
PETROLEO DIESSEL 0.006 2.42% 53
3 AGREGADO GRUESO 0.190 94.54% 05
0.201 AA
ACERO DE CONSTRUCCION CORRUGADO 0.011 5.46% 03
4 MAQUINARIA Y EQUIPO IMPORTADO 0.165 94.74% 49
0.174 MH
HERRAMIENTA MANUAL 0.009 5.26% 37
5 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.130 0.130 100.00% GGU 39
1.000 1.000

K= 0.252 Jr 0.242 CMPr 0.201 AAr 0.174 MHr


Jo CMPo AAo MHo

K= 0.252 x (Jr / Jo) + 0.242 x (CMPr / CMPo) + 0.201 x (AAr / AAo) + 0.174 x (MHr / MHo) +

VERIFICACIONES
1. NRO. MÁXIMO DE MONOMIOS 5 OK
2. NRO. MÁXIMO DE I.U. ACUMULADOS
Monomio 1 1 OK
Monomio 2 3 OK
Monomio 3 2 OK
Monomio 4 2 OK
Monomio 5 1 OK
3. MINIMO VALOR DE COEFICIENTE DE INCIDENCIA
Monomio 1 0.252 OK
Monomio 2 0.242 OK
Monomio 3 0.201 OK
Monomio 4 0.174 OK
Monomio 5 0.130 OK
4. SUMATORIA DE MONOMIOS 1.000 OK
1

0.130 GGUr
GGUo

0.13 x (GGUr / GGUo)