You are on page 1of 1

PROJECT CLOSURE PLAN (PCP) – THE PROPOSED CONSTRUCTION AND

COMPLETION OF THE KPC PORT LINK ROAD IN KUANTAN PORT CITY, PAHANG
DARUL MAKMUR FOR THE EAST COAST ECONOMIC REGION DEVELOPMENT
COUNCIL (ECERDC) (PACKAGE 3A)

TABLE OF CONTENT

PAGE

1.0 INTRODUCTION 1
1.1 Background 1
1.2 Responsibilities 1
1.3 Project Activities 1
1.3.1 Existing Environment 1
1.3.2 Project Facilities 2
1.3.3 Project Activities 2
1.4 Land Use 2
1.4.1 Project Location and Size 3
1.4.2 Project Implementation Schedule 3
2.0 STATUS OF WORK PROGRESS AND SITE ACTIVITIES 3
2.1 Construction Status 3
3.0 IDENTIFICATION OF ENVIRONMENTAL ISSUES
3.1 Site Office 4
3.2 Removal of Temporary Structure 4
3.3 Removal of Unused/Excess Materials 4
3.4 Demobilization of Heavy Machinery 5
3.5 Erosion, Sedimentation and Flood Control 5
3.5.1 Exposed area 5
3.5.2 Drainage 5
3.5.3 River Protection 5
3.6 Waste Management 5
3.6.1 Temporary Structure 5
3.6.2 Solid/Construction Waste 5
3.6.3 Scheduled Waste 5
4.0 COMPLIANCE AUDIT CHECKLIST 6
5.0 ENVIRONMENTAL MONITORING AND AUDIT PROGRAM 10
5.1 Introduction 10
5.2 Check Dam 10
5.3 Water Quality Monitoring 10
5.4 Air Quality Monitoring 11
5.5 Noise Level Monitoring 12
5.6 Environmental Project Closure Audit 12
6.0 EMERGENCY PREPAREDNESS AND RESPONSE 14
7.0 CONCLUSION 15
APPENDIX PCP 1 OVERALL LAYOUT PLAN
APPENDIX PCP 2 WORK PROGRAM
APPENDIX PCP 3 SCHEDULE WASTE DISPOSAL RECIEPT
APPENDIX PCP 4 WATER QUALITY RESULT
APPENDIX PCP 5 AIR QUALITY RESULT
APPENDIX PCP 6 NOISE LEVEL RESULT

JANUARY 2018 AHMAD ZAKI SDN BHD

You might also like