Project Unit Doc Code Serial Rev. Page

S646 140 PDS V-021 22 0 1 /3


2/4
TECHNIP KT INDIA

OWNER : NAGARJUNA OIL CORPORATION LTD.


PMC : CB&I, LUMMUS
FEED CONTRACTOR : TECHNIP KT INDIA LTD.
PROJECT : FEED FOR DIESEL HYDRODESULFURIZATION UNIT
The present document or drawing is property of TECHNIP KT INDIA LTD. and shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use.

UNIT : DIESEL HYDRODESULFURIZATION UNIT


PMC DOCUMENT NO : CK-140-PR-30-0036

PROCESS DATA SHEET


FOR
HYDROCARBON DRAIN DRUM
(TAG NO: 140-V-021)

0 04-06-2009 APPROVED FOR DESIGN RCD NHB TT SLSK


REV. DATE STATUS PREPARED BY REVIEWED BY APPROVED BY PM
DOCUMENT REVISIONS
Sections changed in last revision are identified by a line in the right margin
PROCESS DATA SHEET
Project N° - Unit Doc. type Equipment N° Serial N° Rev. index

S646 - 140 PDS V-021 22 0


TECHNIP KT INDIA LTD. PMC Doc No,

CK-140-PR-30-0036
CLIENT NOCL Rev. Date Made by Checked by Page
PMC CB&I LUMMUS 0 4-Jun-09 RCD NHB
Revision

LOCATION CUDDALORE, TAMILNADU


INDIA
HORIZONTAL DRUM 2/3
3/4
UNIT Diesel Hydrosulfurization
Unit
1 ITEM 140-V-021
2 SERVICE Hydrocarbon Drain Drum SKETCH:
3 OPERATING PROCESS DESIGN
4 Pressure barg barg D V2
LT2

5 0.25 3.5/FV
PN
6 (Note-5)
OL
T.L.
7 Temperature °C °C
8 40 150/120

Note 3
M

640
9

10 MDMT 18
11 SHELL/ENDS STEAM COIL V1

300
12 Materials KCS (PWHT) KCS
LT1
LT 1800
13 Corrosion allow. 3 mm 3 mm

Slope 1 : 100
14 Head type Elliptical 2:1
TT TI

25013401440
15 Fluid : HYDROCARBONS
684-1000

5000
16 Density at T : kg/m³
PI
17 Insulation NO

000
18 Lining NO
LT2

NLLL
19 Lower TL elevation above ground = (Note 6)

NHLL
LAH

LAL
20 Notes :
MH
21

1090
22 S

640
100
23 See page 3 for notes.
24
N

150
25 T.L.
UC
26 Note 2

NOTE-6
27 NOZZLE DATA
28 REF. No Ø Rating SERVICE By Civil
29 IL 1 4" 150# Inlet (UG)

S1
S2
30 OL 1 1.5" 150# Pump Outlet IL
31 PN 1 26" 150# Pump Nozzles
32 M 1 (Note-4) (Note-4) Pump Motor
33 LT1 1 4" 150# Level Instrument
34 PI 1 2" 150# Pressure Instr
35 TT / TI 1 2" 300# Temperature Instr
36 MH 1 24" 150# Manhole
37 S 1 2" 150# Min. Flow Return Special service = Yes
38 N 1 2" 150# Nitrogen Connection
39 UC 1 2" 150# Utility Connection Hydrogen service = No
40 V1 1 2" 150# Vent Sour service = Yes
41 D 1 2" 150# Drain Amine service = No
42 Caustic service = No
43 S1 1 2" 150# Steam Coil Inlet

44 All dimensions are in mm


45 S2 1 2" 150# Steam Coil outlet

46 LT2 1 4" 150# Level Instrument

47 V 1 2" 150# Vent

48
\\Kt001sf0005\s646\Process\5.0 Coded Document\PDS\2.0 Vessel\140-V-021_CBD\Rev 0\[S646-140-PDS-V021-22-0.xls]PD017A12 PD017A12
Property of Technip KT India Ltd. To be returned upon request and used only in reference to contract or proposals of this company. Reproduction of
this print or unauthorised use of patented or patentable features disclosed hereon is prohibited.
6
PROCESS DATA SHEET
Project N° - Unit Doc. type Equipment N° Serial N° Rev. index

S646 - 140 PDS V-021 22 0


TECHNIP KT INDIA LTD. PMC Doc No,

CK-140-PR-30-0036
CLIENT Rev. Date Made by Checked by Page
NOCL
PMC 0
Revision

CB&I LUMMUS 4-Jun-09 RCD NHB


LOCATION
CUDDALORE, TAMILNADU
HORIZONTAL DRUM 3/3
INDIA 4/4
UNIT
Diesel Hydrosulfurization
Unit
1

2 Notes :
3 1) Controlled Draining of One Equipment at a time is considered. The Maximum Hydrocarbon inventory below low level
4 is about 10.1m3 for Separator Drum 140-V-006. The Drum volume of 10.3 m3 between LAL and LAH is provided to.
5 accommodate maximum hydrocarbon hold up below low low level of 140-V-006.
6 2) Drum is located in pit.The depth of drum, nozzle heights shall be finalized by Civil as per requirement.
7 based on header slope.
8 3) Boot dimensions to be decided by DEC as per sump pump requirements.Deleted.
9 4) Nozzle OL, M,V & D are located on Nozzle PN. Nozzle size of OL,M & PN shall be confirmed by DEC based
10 on Pump vendor information.
11 5) Vessel shall be designed for steam out condition : 0 barg ,120 C
12 6) Vessel to be located in pit covered by grating. Nozzles to extend above grating.
13 7) Deleted.
14 8) Steam coil length is 30 m.
15 9) Refer P&ID No. CS-140-PR-15-0040.
16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48
\\Kt001sf0005\s646\Process\5.0 Coded Document\PDS\2.0 Vessel\140-V-021_CBD\Rev 0\[S646-140-PDS-V021-22-0.xls]PD017A12 (2) PD017A12
Property of Technip KT India Ltd. To be returned upon request and used only in reference to contract or proposals of this company.
Reproduction of this print or unauthorised use of patented or patentable features disclosed hereon is prohibited.

You might also like