Master Plan

Facility Requirements Summary


Prior to construction, projects will require an environmental
evaluation per the National Environmental Policy Act (NEPA)
regulations. Initial phasing for each recommended project,
including demand-based development (DBD) is presented in
the table below.

Project Description Phase I Phase II Phase III

Install DME 
Update Airport Property Map/Exhibit A 
Conduct Environmental Assessment (5 Year)   
Remove Obstructions and Install Obstruction Lights 
Acquire Land for RPZ  DBD 
Upgrade Water and Sewer Service 
Construct Fuel Farm 
Rehabilitate and Expand GA Apron  DBD DBD
Construct Corporate Hangar Apron   
Construct Corporate Hangar   
Construct T-Hangar Taxilanes 
Construct T-Hangar 
Demolish T-Hangar 
Construct Executive Hangars 
Construct GSE Storage Building 
Upgrade Security System 
Construct Helicopter Parking Apron 
Expand Commercial Service Terminal Building DBD DBD
Expand Air Carrier Apron DBD DBD
Rehabilitate GA Terminal Building 
Rehabilitate/Expand ARFF Building 
Construct Rental Car Service Facility 
Rehabilitate Runway 5-23 
Install Runway 23 ALS 
Conduct Route 256/771 Intersection Traffic Study 
Conduct Airport Wayfinding Study and Improvements 

11
Shenandoah Valley Regional Airport

photo by Shenandoah Valley Regional Airport

Project Description Phase I Phase II Phase III

Conduct Glide Slope Relocation Study 


Relocate Runway 5 Glide Slope Facility 
Relocate AWOS 
Relocate Taxiway A 
Construct Airport Perimeter Road 
Rehabilitate Taxiway A 
Relocate Airfield Electrical Vault DBD
Construct Partial East Side Parallel Taxiway DBD
Install Runway 5 RVR 
Construct Fuel Truck Parking 
Construct Remote ARFF Training Site 
Construct Air Traffic Control Tower 
Construct SRE Building 
Notes:  = Development item to be presented and discussed in the Alternatives Analysis chapter.
DBD = Demand-Based Development
Source: Delta Airport Consultants, Inc.

12 Executive Summary