Summary of Bill of Quantities (Sewerage Works)

ROYAL AUDIT AUTHORITY TRAINING CENTRE, TSIRANG


Royal Audit Authority

No of A4 printed
Sl No Description No of items Amount Qouted Remarks
pages (Landscape)

1 Sewerage Works 35 4

35 4
TOTAL

In Words Ngultrum…………………………………………………………………………………………………………

Page 1 of 11
Bill of Quantities (Sewer Works)
ROYAL AUDIT AUTHORITY TRAINING CENTRE, TSIRANG
Royal Audit Authority

Name of work:RAA Training Centre

Sl No BSR Ref Description of item Quantity Unit

SUB TITLE : SEWER WORKS FOR MAIN BUILDING


INSPECTION CHAMBER

1.0 Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level.
1.1 N/A Depth not exceeding 0.6m ("S" type chamber) 5.00 each
1.2 Depth 0.61m to 0.90m ("M" type chamber) 2.00 each
1.3 Depth 0.91m to 1.50m ("L" type chamber) 5.00 each

PIPE LAYING:
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching,
2.0 PO0052 142.50 m
refilling & thrust block) -160mm

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing
3.0 EW0156 of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary 142.50 m
rock with or without blasting-Pipes, cables etc. dia.> 300mm

SUB TITLE: GENERAL HOSTELS (2 Nos.) & SELF CATERING HOSTELS(2 Nos.)
INSPECTION CHAMBER:
Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
4.0
of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level.
N/A
Page 2 of 11
Sl No BSR Ref Description of item Quantity Unit

4.1 N/A Depth not exceeding 0.6m ("S" type chamber) 13.00 each
4.2 Depth 0.61m to 0.90m ("M" type chamber) 8.00 each
4.3 Depth 0.91m to 1.50m ("L" type chamber) 6.00 each
PIPE LAYING:
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching,
5.0 PO0052 381.61 m
refilling & thrust block) -160mm

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing
6.0 EW0156 of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary 381.61 m
rock with or without blasting-Pipes, cables etc. dia.> 300mm

SUB TITLE: EXECUTIVE HOSTELS (3 Nos.)


INSPECTION CHAMBER:
Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
7.0

N/A of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level.
7.1 Depth not exceeding 0.6m ("S" type chamber) 3.00 each
7.2 Depth 0.91m to 1.50m ("L" type chamber) 4.00 each

8.0 PO0372 Providing & fixing 110mm dia P.V.C soil waste and vent pipes, single or double socketed, including pipe 12.00 m
clip complete (excluding the cost of PVC fittings)

9.0 PO0380 Providing & fixing P.V.C pipe connector - 110mm dia 2.00 each

10.0 PO0387 Providing & fixing P.V.C pipe Coupler - 110mm dia 2.00 each

11.0 PO0407 Providing & fixing P.V.C plain bend - 110mm dia 2.00 each

Page 3 of 11
Sl No BSR Ref Description of item Quantity Unit

12.0 PO0417 Providing & fixing P.V.C door bend - 110mm dia 3.00 each

13.0 PO0437 Providing & fixing P.V.C Single Tee Plain - 110mm dia 2.00 each

14.0 PO0447 Providing & fixing P.V.C Single Tee with door - 110mm dia 2.00 each

15.0 PO0477 Providing & fixing P.V.C Single Y, plain - 110mm dia 3.00 each

16.0 PO0487 Providing & fixing P.V.C Single Y, with door - 110mm dia 3.00 each

17.0 PO0547 Providing & fixing P.V.C Terminal guard - 110mm dia 3.00 each

18.0 PO0555 Providing & fixing P.V.C P- Trap, without air vent (Big) - 110mm dia 6.00 each

PIPE LAYING:
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching,
19.0 PO0052 153.10 m
refilling & thrust block) -160mm

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing
20.0 EW0156 of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary 153.10 m
rock with or without blasting-Pipes, cables etc. dia.> 300mm

SUB TITLE: GYMNASIUM (1 Nos.)


INSPECTION CHAMBER:

Page 4 of 11
Sl No BSR Ref Description of item Quantity Unit
Construction of standard inspection chamber as per dawings and specifications including excavation, fixing
21.0
N/A of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level.
21.1 Depth not exceeding 0.6m ("S" type chamber) 2.00 each
21.2 Depth 0.91m to 1.50m ("L" type chamber) 1.00 each

PIPE LAYING:
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching,
22.0 PO0052 44.52 m
refilling & thrust block) -160mm

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing
23.0 EW0156 of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary 44.52 m
rock with or without blasting-Pipes, cables etc. dia.> 300mm

SUB TITLE: GENERATOR ROOM (1 Nos.)


INSPECTION CHAMBER:
Construction of standard inspection chamber as per dawings and specifications including excavation, fixing

24.0 N/A of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level.
Depth not exceeding 0.6m ("S" type chamber) 1.00 each

PIPE LAYING:
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching,
25.0 PO0052 5.00 m
refilling & thrust block) -160mm

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing
26.0 EW0156 of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary 5.00 m
rock with or without blasting-Pipes, cables etc. dia.> 300mm

Page 5 of 11
Sl No BSR Ref Description of item Quantity Unit

SUB TITLE: CARE TAKER'S ROOM (1 Nos.)


INSPECTION CHAMBER:
Construction of standard inspection chamber as per dawings and specifications including excavation, fixing

27.0 N/A of pipes, CI cover, benching, etc. complete. Depth shall be measured from invert level to the cover level.
Depth not exceeding 0.6m ("S" type chamber) 1.00 each

PIPE LAYING:
Providing & laying H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching,
28.0 PO0052 10.00 m
refilling & thrust block) -160mm

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including dressing
29.0 EW0156 of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m: Ordinary 10.00 m
rock with or without blasting-Pipes, cables etc. dia.> 300mm

Total for Sewer Works (Nu.)

In Words:
……………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………

Page 6 of 11
Bill of Quantities (Sewer Works)
T AUTHORITY TRAINING CENTRE, TSIRANG
Royal Audit Authority

Rate (Nu.) Amount (Nu.)

Page 7 of 11
Rate (Nu.) Amount (Nu.)

Page 8 of 11
Rate (Nu.) Amount (Nu.)

Page 9 of 11
Rate (Nu.) Amount (Nu.)

Page 10 of 11
Rate (Nu.) Amount (Nu.)

………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………

Page 11 of 11

You might also like