BILL OF QUANTITY (BOQ)

REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1

2-CIRCUIT OHL 2 X TACSR/AS 410 mm2 per phase

RAB (Rp)
No. Uraian

REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1

SUB TOTAL
PPN 10%
TOTAL
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6

2-circuit OHL 2 x TACSR/AS 410 mm2 per phase

1 CONDUCTORS, INCLUDING ALL JOINT AND JUMPER CONNECTIONS


1.1 Six twins line Conductors TACSR/AS 410 mm2 16.1 Route km
1.2 One earthwire conductor AS 70 mm2 including downlead to substation gantry and sagging 15.6 Route km
2%
1.3 One earthwire conductor OPGW 70 mm2 24 cores, complete with joint boxes, fixing 15.6 Route km
device, fixing clamps and necessary accessories (including downlead to substation gantry
and sagging)
1.4 Armour rod for line conductor TACSR/AS 410 mm2 432 Sets
1.5 Armour rod for earthwireconductor AS 70 mm2 36 Sets
1.6 Armour rod for earthwireconductor OPGW70 mm2 36 Sets
1.7 Compression midspan joint untuk TACSR/AS 410 mm2 49 Sets
1.8 Compression midspan joint untuk AS 70 mm² 24 Sets
1.9 Compression repair sleeve TACSR/AS 410 mm2 5 Sets

2 DAMPING SYSTEMS : VIBRATION DAMPERS AND CONDUCTOR SPACERS

2.1 Line conductor vibration damper for TACSR/AS 410 mm2 1,752 Sets
2.2 Earthwire conductor vibration damper for AS70 mm2. 146 Sets
2.3 Earthwire conductor vibration damper for OPGW 70 mm2. 146 Sets

page 2 of 26
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6

3 TOWER EARTHING INCLUDING EXCAVATION, REINSTATEMENT,


COMPRESSION JOINTING AND CONNECTION TO TOWER (GANTRY)

3.1 Earthing angle comprising 4 sets of galvanized steel, lead wire, including all clamps. 41 Towers
3.2 Continuous or cross-connected counterpoise cable 30 m length, 450 mm depth, including 8 Tower
galvanized steel angle 1000 mm, all joints and clamps.

4 INSULATOR STRING SETS AND EARTH CONDUCTOR ATTACHMENTS,


COMPLETE WITH ALL FITTINGS BETWEEN TOWER AND CONDUCTORS

4.1 Double suspension string set 120 kN with fog type 216 Sets
4.2 Single tension string set 210 kN with fog type 6 Sets
4.3 Double tension string set 210 kN with fog type 42 Sets

page 3 of 26
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6
4,4 Single suspension jumper insulator string set 120 kN with fog type 6 Sets
4,5 Single tension inverse insulator string set 210 kN with fog type 6 Sets
4,6 Earthwire suspension clamps for AS 70 mm2 36 Sets
4,7 Earthwire tension clamps for AS 70 mm2 8 Sets
4,8 Earthwire suspension clamps for OPGW 60 mm2 36 Sets
4,9 Earthwire tension clamps for OPGW 60 mm2 8 Sets
Note :
Suspension and tension insulator string complete with arching horn

5 SURVEY AND TOWER ALLOCATION


5.1 Check survey including checking of profiles and drawing, pegging of tower positions, 15.3 Route km
diagonal profiles, etc. NA NA NA

5.2 Soil investigation in tower location


a. Sondir 41 Each NA NA NA
b. Boring (20 m) and lab test (4 samples) 5 Each NA NA NA
5.3 Complete clearance of a strip of land concentric with the transmission line route 10 m left 15.3 Route km
side and 10 m right side. NA NA NA

6 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF SUSPENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND
TACK WELDING BOLT & NUTS, STUBS, CLEATS FOR TOWERS :

page 4 of 26
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6
6.1 Type AA6 ± 0 Tower ( Standard height ) 1 Sets
6.2 Type AA6 + 3 Tower 1 Sets
6.3 Type AA6 + 6 Tower 4 Sets
6.4 Type AA6 + 9 Tower 8 Sets
6.5 Type AA6 + 12 Tower 4 Sets
6.6 Type AA6 + 15 Tower 10 Sets
6.7 Type AA6 + 18 Tower 6 Sets
6.8 Type AA6 + 21 Tower 2 Sets

FOUNDATIONS
Complete foundation (including setting of stubs and cleats ) for standard and extended
AA6 type towers, foundation volume is Unit Price (refer to attachment foundation analys)

A. Cohesif Soil
6,9 Class 5 Pad and Chimney (Enlarged) or Raft 36 Towers NA NA NA

7 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF SUSPENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND
TACK WELDING BOLT & NUTS, STUBS, CLEATS FOR TOWERS :

7.1 Type BB6 + 15 Tower 1 Sets

page 5 of 26
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6
FOUNDATIONS
Complete foundation (including setting of stubs and cleats ) for standard and extended
BB6 type towers, foundation volume is Unit Price (refer to attachment foundation analys)

A. Cohesif Soil
7.2 Class 5 Pad and Chimney (Enlarged) or Raft 1 Towers NA NA NA

8 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF SUSPENSION TYPE


COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND
TACK WELDING BOLT & NUTS, STUBS, CLEATS FOR TOWERS :

8.1 Type CC6 + 12 Tower 2 Sets

FOUNDATIONS
Complete foundation (including setting of stubs and cleats ) for standard and extended
CC6 type towers, foundation volume is Unit Price (refer to attachment foundation analys)

A. Cohesif Soil
8.2 Class 5 Pad and Chimney (Enlarged) or Raft 2 Towers NA NA NA

page 6 of 26
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6
9 2-CIRCUIT TOWERS AND EXTENDED TOWERS SLIM OF SUSPENSION TYPE
COMPLETE WITH ALL FITTINGS TOWER INCLUDING CHECK FINAL AND
TACK WELDING BOLT & NUTS, STUBS, CLEATS FOR TOWERS :

9.1 Type DDR6 + 18 Tower 1 Sets

FOUNDATIONS
Complete foundation (including setting of stubs and cleats ) for standard and extended
DDR6 type towers, foundation volume is Unit Price (refer to attachment foundation
analys)
A. Cohesif Soil
9.2 Class 5 Pad and Chimney (Enlarged) or Raft 1 Towers NA NA NA

10 2-CIRCUIT TOWERS AND EXTENDED TOWERS SUPER SLIM OF


SUSPENSION TYPE COMPLETE WITH ALL FITTINGS TOWER INCLUDING
CHECK FINAL AND TACK WELDING BOLT & NUTS, STUBS, CLEATS FOR
TOWERS :
10.1 Type BB6 + 6 Tower 2 Sets
10.2 Type BB6 + 15 Tower 2 Sets
10.3 Type BB6 + 18 Tower 1 Sets
10.4 Type CC6 + 12 Tower 2 Sets

page 7 of 26
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6

FOUNDATIONS
Complete foundation (including setting of stubs and cleats ) foundation volume is Unit
Price (refer to attachment foundation analys)
A. Tower BB
Cohesif Soil
10.5 Class 5 Pad and Chimney (Enlarged) or Raft 5 Towers NA NA NA
B. Tower CC
Cohesif Soil
10.6 Class 5 Pad and Chimney (Enlarged) or Raft 2 Towers NA NA NA

11 MISCELLANEOUS STEEL AND FOUNDATION WORK PRICES FOR SPECIAL


TOWER, SPECIAL EXTENSIONS AND MODIFICATION (TO BE APPLIED
AFTER INSTRUCTED BY ENGINEER)
11.1 Structural mid steel 2.13 Ton
11.2 Structural HT steel 3.19 Ton
11.3 Pile for Foundation Tower 6,456 m NA NA NA
DISMANTLING FOUNDATION
11,4 Existing Concrete Foundation 767.34 m3 NA NA include
DISMANTLING TOWER EXISTING
11,5 Existing Tower 326.68 Ton NA NA include
DISMANTLING CONDUCTOR & ACCESSORIES

page 8 of 26
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6
11,6 Existing Conductor & accessories 16.15 kmr NA NA include
11,7 Existing GSW 32.29 km NA NA include
11,8 Existing Insulator, stringset, hardware and fitting 41.00 Tower NA NA include
11,9 Rewinding Conductor eksisting 16.47 kmr NA NA NA

12 MISCELLANEEOUS SLOPE PROTECTION AND TIE BEAM WORKS ( TO BE


APPLIED AFTER INTRUCED BY ENGINEER )
12.1 Stone Masonry 1 PC : 3 Sand 108 m3 NA NA NA
12.2 Reinforced concrete for Tie Beam 32 m3 NA NA NA
12.3 Retaining Wall (Reinforced Concrete K225) 10 m3 NA NA NA

13 TOWER ACCESSORIES
13.1 Danger Plate with fixing facilities (2 sets per tower) 41 Towers
13.2 Number Plate & Phase Plate with fixing facilities (2 sets per tower) 41 Towers
13.3 Anti climbing guards (4 sets per tower) 41 Towers
Emergency Tower
13.4 Pembersihan di Jalur SUTT dan Tapak Tower Emergency 8 Towers NA NA NA
13.5 Pemasangan Tower Emergency dan Accesoris 8 Towers NA NA
13.6 Pemasangan Konduktor Line 8 Towers NA NA
13.7 Pembongkaran Tower Emergency dan Accesoris 8 Towers NA NA

14 TEST, COMISSIONING AND CERTIFICATE 1 Lot NA NA NA

page 9 of 26
BILL OF QUANTITY (BOQ)
REKONDUKTORING SUTT 150 KV BATANG - WELERI SECTION 1
2-circuit OHL 2 x TACSR/AS 410 mm2 per phase
QUANTITY PROCUREMENT TRANSPORTATION A
NO. EQUIPMENT AND MATERIAL DESCRIPTION
(Rp) (Rp) In land (Rp)
1 2 3 4 5=3x4 6

15 AS BUILT DRAWING ( 3 sets hardcopy and 2 sets softcopy ) consist of : 1 Lot NA NA NA

- Laporan Hasil Penyelidikan Tanah and Pondasi schedule


- Route map, line profile and tower schedule (incl. GPS coordinates of tower)
- Technical specification and brochure/leaflet of transmission line materials
- Design of Calculation and design drawings
- Test Report for foundation, Tower, and Transmission Materials
- Construction Drawing
- Test Commissioning report

TOTAL PRICE

page 10 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11

NA NA

NA NA

NA NA

NA NA
NA NA
NA NA
NA NA
NA NA
NA NA

NA NA
NA NA
NA NA

page 11 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11

NA NA

NA NA

NA NA
NA NA
NA NA

page 12 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA

NA NA NA

NA NA NA
NA NA NA

NA NA NA

page 13 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA

NA NA NA

NA NA

page 14 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11

NA NA NA

NA NA

NA NA NA

page 15 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11

NA NA

NA NA NA

NA NA
NA NA
NA NA
NA NA

page 16 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11

NA NA NA

NA NA NA

NA NA
NA NA
NA NA NA

include NA NA

include NA NA

page 17 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11
include NA NA
include NA NA
include NA NA
NA NA NA include 11.6 include 11.6 include 11.6

NA NA NA
NA NA NA
NA NA NA

NA NA
NA NA
NA NA

NA NA NA
NA NA
NA NA
NA NA

NA NA NA

page 18 of 26
ANTITY (BOQ)
KV BATANG - WELERI SECTION 1
R/AS 410 mm2 per phase
FOUNDATION /
TRANSPORTATION AND INSURANCE ERECTION
OTHER CIVIL WORK TOTAL PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
7 = (6x3) 8 9=3x8 10 11 = 3 x 10 12=5+7+9+11

NA NA NA

page 19 of 26
ESTIMATE TOWER UNIT WEIGHT
2-CIRCUIT TOWERS
( 2-cct 2 x TACSR/AS 410)

TOTAL UNIT PRICE


NO. TOWER TYPE
(kg) (Rp)

1 AA2+0 10,361
AA2+3 11,396
AA2+6 12,446
AA2+9 13,511
AA2+12 14,504
AA2+15 15,595
AA2+18 17,154
AA2+21 18,870

2 BB2+15 22,526

3 CC2+12 23,798

4 DDR2+18 38,917

5 BB6+6 SS 19,156
BB6+15 SS 25,713
BB6+18 SS 28,005
CC6+12 SS 29,453
TYPE OF TOWER : AA6
FOUNDATION CLASS : 5

UNIT PRICE TOTAL PRICE


NO DESCRIPTION UNIT QTY
( Rp ) ( Rp )
(1) (2) (3) (4) (5) (6)=(4)x(5)
1 Geometry and Bouwplank ls 1.00
( incl Stub Setting )

2 Handling Material Foundation from Stockyard to m3 41.90


tower location

3 Test Concrete Cylinder for 7, 14, 28 days no 36.00


( dia. 15cm x 30 cm)

4 Excavation of Soil m3 172.80

5 Back Filling m3 124.50

6 Compacted Sand , t = 10 cm m3 6.40

7 Lean concrete K100 (f'c = 10 Mpa) , t = 10 cm m3 6.40

8 Concrete K 225 (fc' 22.5 MPa) : m3 35.50

9 Reinforced Steel :
Screew Reinfoced of Steel U 32 - BJTD 35 kg 3709.75
Plain Reinforced of Steel U 24 - BJTP 24 kg 195.25

10 Formwork m2 26.00

11 PVC dia 2 ich for grounding tower m 16.00

12 Installed stake of concrete for Tower area no 4.00

13 Dewatering ls 1.00

14 Finishing and site clearing ls 1.00

21 dari 26
TYPE OF TOWER : BB6
FOUNDATION CLASS : 5

UNIT PRICE TOTAL PRICE


NO DESCRIPTION UNIT QTY
( Rp ) ( Rp )
(1) (2) (3) (4) (5) (6)=(4)x(5)
1 Geometry and Bouwplank ls 1.00
( incl Stub Setting )

2 Handling Material Foundation from Stockyard to m3 86.60


tower location

3 Test Concrete Cylinder for 7, 14, 28 days no 36.00


( dia. 15cm x 30 cm)

4 Excavation of Soil m3 108.38

5 Back Filling m3 30.63

6 Compacted Sand , t = 10 cm m3 7.23

7 Lean concrete K100 (f'c = 10 Mpa) , t = 10 cm m3 7.23

8 Concrete K 225 (fc' 22.5 MPa) : m3 63.29

9 Reinforced Steel :
Screew Reinfoced of Steel U 32 - BJTD 35 kg 7,215.42
Plain Reinforced of Steel U 24 - BJTP 24 kg 379.76

10 Pile dia 40 cm m 0

11 Formwork m2 56.00

12 PVC dia 2 ich for grounding tower m 16.00

13 Installed stake of concrete for Tower area no 4.00

14 Dewatering ls 1.00

15 Finishing and site clearing ls 1.00

22 dari 26
TYPE OF TOWER : BB6 SUPER SLIM
FOUNDATION CLASS : 5

UNIT PRICE TOTAL PRICE


NO DESCRIPTION UNIT QTY
( Rp ) ( Rp )
(1) (2) (3) (4) (5) (6)=(4)x(5)
1 Geometry and Bouwplank ls 1.00
( incl Stub Setting )

2 Handling Material Foundation from Stockyard to m3 104.20


tower location

3 Test Concrete Cylinder for 7, 14, 28 days no 36.00


( dia. 15cm x 30 cm)

4 Excavation of Soil m3 61.44

5 Back Filling m3 17.45

6 Compacted Sand , t = 10 cm m3 4.10

7 Lean concrete K100 (f'c = 10 Mpa) , t = 10 cm m3 4.10

8 Concrete K 225 (fc' 22.5 MPa) : m3 35.79

9 Reinforced Steel :
Screew Reinfoced of Steel U 32 - BJTD 35 kg 3740.54
Plain Reinforced of Steel U 24 - BJTP 24 kg 196.87

10 Pile dia 40 cm m 0.00

11 Formwork m2 42.36

12 PVC dia 2 ich for grounding tower m 16.00

13 Installed stake of concrete for Tower area no 4.00

14 Dewatering ls 1.00

15 Finishing and site clearing ls 1.00

23 dari 26
TYPE OF TOWER : CC6
FOUNDATION CLASS : 5

UNIT PRICE TOTAL PRICE


NO DESCRIPTION UNIT QTY
( Rp ) ( Rp )
(1) (2) (3) (4) (5) (6)=(4)x(5)
1 Geometry and Bouwplank ls 1.00
( incl Stub Setting )

2 Handling Material Foundation from Stockyard to m3 91.92


tower location

3 Test Concrete Cylinder for 7, 14, 28 days no 36.00


( dia. 15cm x 30 cm)

4 Excavation of Soil m3 108.38

5 Back Filling m3 29.32

6 Compacted Sand , t = 10 cm m3 7.23

7 Lean concrete K100 (f'c = 10 Mpa) , t = 10 cm m3 7.23

8 Concrete K 225 (fc' 22.5 MPa) : m3 64.60

9 Reinforced Steel :
Screew Reinfoced of Steel U 32 - BJTD 35 kg 7,364.65
Plain Reinforced of Steel U 24 - BJTP 24 kg 387.61

10 Pile dia 40 cm m 0.00

11 Formwork m2 61.60

12 PVC dia 2 ich for grounding tower m 16.00

13 Installed stake of concrete for Tower area no 4.00

14 Dewatering ls 1.00

15 Finishing and site clearing ls 1.00

24 dari 26
TYPE OF TOWER : CC6 SUPER SLIM
FOUNDATION CLASS : 5

UNIT PRICE TOTAL PRICE


NO DESCRIPTION UNIT QTY
( Rp ) ( Rp )
(1) (2) (3) (4) (5) (6)=(4)x(5)
1 Geometry and Bouwplank ls 1.00
( incl Stub Setting )

2 Handling Material Foundation from Stockyard to m3 104.20


tower location

3 Test Concrete Cylinder for 7, 14, 28 days no 36.00


( dia. 15cm x 30 cm)

4 Excavation of Soil m3 61.44

5 Back Filling m3 17.45

6 Compacted Sand , t = 10 cm m3 4.10

7 Lean concrete K100 (f'c = 10 Mpa) , t = 10 cm m3 4.10

8 Concrete K 225 (fc' 22.5 MPa) : m3 35.79

9 Reinforced Steel :
Screew Reinfoced of Steel U 32 - BJTD 35 kg 3740.54
Plain Reinforced of Steel U 24 - BJTP 24 kg 196.87

10 Pile dia 40 cm m 0.00

11 Formwork m2 42.36

12 PVC dia 2 ich for grounding tower m 16.00

13 Installed stake of concrete for Tower area no 4.00

14 Dewatering ls 1.00

15 Finishing and site clearing ls 1.00

25 dari 26
TYPE OF TOWER : DDR6
FOUNDATION CLASS : 5

UNIT PRICE TOTAL PRICE


NO DESCRIPTION UNIT QTY
( Rp ) ( Rp )
(1) (2) (3) (4) (5) (6)=(4)x(5)
1 Geometry and Bouwplank ls 1.00
( incl Stub Setting )

2 Handling Material Foundation from Stockyard to m3 121.83


tower location

3 Test Concrete Cylinder for 7, 14, 28 days no 36.00


( dia. 15cm x 30 cm)

4 Excavation of Soil m3 147.02

5 Back Filling m3 40.50

6 Compacted Sand , t = 10 cm m3 9.80

7 Lean concrete K100 (f'c = 10 Mpa) , t = 10 cm m3 9.80

8 Concrete K 225 (fc' 22.5 MPa) : m3 86.91

9 Reinforced Steel :
Screew Reinfoced of Steel U 32 - BJTD 35 kg 12,384.59
Plain Reinforced of Steel U 24 - BJTP 24 kg 651.82

10 Pile dia 40 cm m 0

11 Formwork m2 70.56

12 PVC dia 2 ich for grounding tower m 16.00

13 Installed stake of concrete for Tower area no 4.00

14 Dewatering ls 1.00

15 Finishing and site clearing ls 1.00

26 dari 26