PROYECTO:
q ult
q adm q adm
Df (ton/m2
(ton/m2) (Kg/cm2)
)
1.00 34.84 11.61 1.16
1.50 47.01 15.67 1.57
2.00 60.11 20.04 2.00
2. CALCULO DE ASENTAMIENTOS:
q x B ( 1 - ² )
Si = x If
Es
: 0.25
Es:8000 Tn/m²
q ult
q adm q adm
Df (ton/m2
(ton/m2) (Kg/cm2)
)
1.00 34.84 11.61 1.16
1.50 47.01 15.67 1.57
2.00 60.11 20.04 2.00
B: 1.20 m
Reemplazando tenemos:
q
If
(Presió
Profundidad µ Es (Factor Base
n de Asentamient
de (Adimensional (Elasticidad de (metros
trabajo o (cm)
Desplante ) ) Tn/m2 Forma )
Ton/m2
cm/m)
)
1.00 0.25 8,000.00 112.00 11.61 1.20 0.18
1.00 0.25 8,000.00 56.00 11.61 1.20 0.09
1.00 0.25 8,000.00 95.00 11.61 1.20 0.16
1.50 0.25 8,000.00 112.00 15.67 1.20 0.25
1.50 0.25 8,000.00 56.00 15.67 1.20 0.12
1.50 0.25 8,000.00 95.00 15.67 1.20 0.21
2.00 0.25 8,000.00 112.00 20.04 1.20 0.32
2.00 0.25 8,000.00 56.00 20.04 1.20 0.16