You are on page 1of 9

Cuadro N° 01: Perdida de carga acumulada

Punto Inicial Punto Diametro Diametro Codo 45°


comercial interno
final Distancia Material (pulg2) (pulg2)
CISTERNA BOMBA 3.30 Shedule 40 4 4.03 0
BOMBA C (SALIDA) 5.40 Shedule 40 4 4.03 0
C D 106.12 HDPE SDR 11 (16 BAR) 4 3.54 0
D E 33.19 HDPE SDR 11 (16 BAR) 4 3.54 0
E 1.37 HDPE SDR 11 (16 BAR) 2 1/2 2.42 0
F 1.50 Shedule 40 2 1/2 2.47 0

Calculo de la bomba principal


Al. Geom. Hg= 4.18 m Donde:
Q = Caudal en lts/seg
Per. carga total Hf= 6.63 m HDT = Altura Dinámica total
e = eficiencia (60%)
Presión mínima P= 70.00 m Salida 2 1/2

Total= 80.81 m 114.94


Caudal Q= 200 gpm
Caudal Q= 12.62 l/s H�=(𝑸×𝑯𝑫�
Potencia Pot.= 22.66 HP )/(𝟔𝟎%×𝟕�)
Pot.= 24.92 HP
Calculo de la bomba Jockey
Caudal Q= 10 gpm
Caudal Q= 0.63 l/s
HDT Total= 88.89 m 126.43
Potencia Pot.= 1.25 HP
Pot.= 1.87 HP

CAMARA DE BOMBEO DE DESAGUE

Ø impulsión pulgadas 2"


Long.
cantidad total (m)
Accesorio Equivalente
Válvula check 1 5.682 5.68
Válvula compuerta 1 22.727 22.73
Codo 2"x90° 2 2.045 4.09
Longitud total por accesorios 32.50
Longitud de tubería 2" 3.70
Longitud equivalente total 36.20
Hf 3.19
SCI ACD
Volumen de cisterna 25 14.85 m3
Tiempo de llenado 4 4 horas
Caudal 1.74 1.03 l/s 2.77

Caudal de bombeo 2.60 1.55 l/s 4.15


Tiempo de retencion 5 min
Volumen de pozo 1,245.31 litros
Dimensiones L= 1.2
A= 1.2
H= 0.86 0.85

Volumen Util= 1.46 m3

LONGITUD CAUDAL DIAMET. C S Hf VEL.


m. l/seg. Pulg. HYW (‰) m. m/s
36.20 4.15 2 140 88.26 3.19 2.05

Caudal Q= 4.15 l/s


Al. Geom. Hg= 3.70 m
Presión mínima P= 1.50 m
HDT Total= 5.20 m
Potencia Pot.= 0.48 HP
Pot.= 0.72 HP
1: Perdida de carga acumulada para determinar la altura dinamica total del sistema contra incendio.

Codo 90° Val. Val. Val.

L.E. L.E. Tee L.E. Comp. L.E. Glob. L.E. Check L.E.
0.00 1 3.05 0 6.10 1 0.61 0 5.68 0 6.71
0.00 3 3.05 0 6.10 1 0.61 0 5.68 1 6.71
0.00 6 3.05 0 6.10 0 0.91 0 5.68 0 0.00
0.00 1 3.05 0 6.10 0 0.91 0 4.32 0 0.00
0.00 1 1.83 0 3.66 0 0.00 0 2.95 0 0.00
0.00 1 1.83 0 3.66 0 0.00 0 2.95 0 0.00

Donde: F50/250AR (30 H.P.) Altura (m) vs Q caudal (l/s Curva


Q = Caudal en lts/seg Q caudal Altura (m) Q caudal
HDT = Altura Dinámica total 96.00
(m3/h) (l/s)
e = eficiencia (60%) 94.00 f(x) = - 0.0578571429x^2 + 0.2464285714x + 9
18.00 95.00 5.00 R² = 0.9984013951
92.00

24.00 94.00 6.67 90.00

30.00 93.00 8.33 88.00

H�=(𝑸×𝑯𝑫� 36.00 92.00 10.00 86.00


)/(𝟔𝟎%×𝟕�) 42.00 90.00 11.67 84.00

48.00 88.00 13.33 82.00

54.00 86.00 15.00 80.00

60.00 83.00 16.67 78.00

45.43 88.98 12.62 76.00


4.00 6.00 8.00 10.00 12.00 14.00
Si cumple este equipo

CM50-250A (30 H.P.)


Q caudal Altura (m) Q caudal
Altura (m) vs Q caudal (l/s Curva CM50-250
(m3/h) (l/s)
95.00
27.00 89.50 7.50
30.00 88.80 8.33 90.00
33.00 88.30 9.17 f(x) = - 0.0443569641x^2 + 0.0927839033x + 91.1775965388
R² = 0.9996729432
85.00
36.00 87.70 10.00
39.00 86.90 10.83 80.00
42.00 86.10 11.67
48.00 84.50 13.33 75.00

54.00 82.70 15.00


70.00

65.00
6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00
80.00

75.00

70.00
60.00 80.50 16.67
66.00 78.00 18.33 65.00
6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00
72.00 75.20 20.00
78.00 71.70 21.67

45.43 85.28 12.62

DH 100G Altura (m) vs Q caudal (l/s Curva DH 100G)


Q caudal Altura (m) Q caudal
25.00
(m3/h) (l/s)
0.00 19.40 0.00
20.00
3.00 18.05 0.83 f(x) = - 0.5173714286x^2 - 0.2845714286x + 19.0778571429
6.00 17.10 1.67 15.00
R² = 0.9964482561
9.00 15.02 2.50
12.00 12.60 3.33 10.00
15.00 9.30 4.17
18.00 4.40 5.00 5.00
14.94 8.99 4.15
Si cumple este equipo 0.00
0.00 1.00 2.00 3.00 4.00 5.00 6
verificar con el proevedor
Long.

Red L.E. Sub Total Total Q (gmp) Q (l/s) Hf (m) V (m/s) Q= Kx(P)^0.5
0 0 3.66 6.96 200.00 12.62 0.22 1.54 K= Q/(P)^0.5
0 0 16.46 21.86 200.00 12.62 0.68 1.54 Q= 100 GPM
1 1.16 19.45 125.57 200.00 12.62 4.87 1.99 P= 100 PSI
0 0 3.05 36.24 100.00 6.31 0.39 0.99 K= 10.00
0 0.73 1.83 3.20 100.00 6.31 0.22 2.13
1 0.73 2.56 4.06 100.00 6.31 0.25 2.04
Total 6.63

(m) vs Q caudal (l/s Curva F50/250AR)

0.0578571429x^2 + 0.2464285714x + 95.0892857143


984013951

DN 75 110
e 6.8 10
DI 61.4 90
DI (PUG) 2.42 3.54
8.00 10.00 12.00 14.00 16.00 18.00
ℎ�=10.78𝑥 (𝐿(𝑚))/ 〖 "Ø(m) " 〗 ^4.87 𝑥

〖�(𝑚3/𝑠)" " 〗 ^1.85/𝐶^1.85

Bomba selecionada
U5V-300/6T (3 H.P.)
Q caudal Altura (m) Q caudal Altura (m) vs Q caudal (l/s)U5V-300/6T0A
audal (l/s Curva CM50-250A) 100.00
(m3/h) (l/s) 90.00
f(x) = - 8.4141366543x^2 - 2.5181534173x + 94.7576744208
1.80 91.90 0.50 80.00
R² = 0.9978103843
2.40 89.30 0.67 70.00
+ 0.0927839033x + 91.1775965388 60.00
3.60 83.00 1.00
50.00
4.80 76.50 1.33 40.00
6.00 66.70 1.67 30.00
7.20 56.80 2.00 20.00
10.00
8.40 44.70 2.33
0.00
9.00 34.30 2.50 0.00 0.50 1.00 1.50 2.00 2.50 3.00

00 16.00 18.00 20.00 22.00


30.00
20.00
10.00
0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00
2.27 89.83 0.63
00 16.00 18.00 20.00 22.00

U5V-400/8T (4 H.P.) Altura (m) vs Q caudal (l/s)U5V-300/6T0A


Q caudal Altura (m) Q caudal
140.00
(m3/h) (l/s)
120.00
f(x) = - 20.6164283029x^2 + 12.2458875544x + 126.7467795538
1.80 129.00 0.50 R² = 0.9986544153
2.40 125.00 0.67 100.00

3.60 117.00 1.00 80.00


4.80 106.00 1.33 60.00
dal (l/s Curva DH 100G) 6.00 91.00 1.67 40.00

7.20 70.00 2.00 20.00


8.40 42.00 2.33 0.00
0.00 0.50 1.00 1.50 2.00 2.50
- 0.2845714286x + 19.0778571429
2.27 126.28 0.63

3.00 4.00 5.00 6.00


TABLA 1
Presion de trabajo 80.81 m H2O 114.75 PSI 160 CUMPLE
Velocidad 2.13 m/s 6.99 fps
6T0A

Presion de sobrecarga 215.35 PSI 240 CUMPLE


.7576744208
Presion de maxima de sobrecarga 229.75 PSI 320 CUMPLE
16 BAR 232 PSI

2.50 3.00
2.50 3.00

/6T0A

126.7467795538

.00 2.50