You are on page 1of 3

TABLE OF CONTENTS

LETTER OF TRANSMITTAL --------------------------------------------- i

TITLE PAGE ------------------------------------------------------------------------ ii

ACKNOWLEDGEMENT ------------------------------------------------------------ iii

TABLE OF CONTENTS ------------------------------------------------------------- IV

CHAPTER 1 INTRODUCTION

1.1 General Statement ----------------------------------------------------- 1

1.2 Brief History of the plant ----------------------------------------------- 2


Mission, Visions, Objective and Function
1.3 Subject of the report -- ------------------------------------------------ 3
1.4 Organizational Set – up with Technical Organization------ ----- 7
1.5 Location Map ------------------------------------------------------------- 8

1.6 Site Development Plan--- ------------------------------------------------ 9

CHAPTER 2 REPORT PROPER

2.1 Cooling Load Estimate --------------------------------------------- 10

Design Criteria------------------------------------------------------------ 11

Heat load computations------------------------------------------------- 12

Cooling Plant Sizing ---------------------------------------------------- 14

2.2 Mechanical Plan (A/C ventilation layout) -------------------------- 15

2.3 Mechanical Works Specifications------------------------------------- 15

2.4 General Provisions --- ------------------------------------------------ 26

2.5 Installation ---------------------------------------------------------------- 32

2.7 Testing and Commissioning-- ----------------------------------------- 48

CHAPTER 3 OBSERVATION, COMMENTS AND RECOMMENDATIONS

3.1 Observation ---------------------------------------------------------------- 51

3.2 Comments ---------------------------------------------------------------

51

i
3.3 Recommendations -------------------------------------------------------- 51

BIBLIOGRAPHY ----------------------------------------------------------------------- 52

APPENDICES ------------------------------------------------------------------------ 53

Annex – A : Cooling load computations using HAP Hourly Analysis Program

Annex – B : M-001 (Key Plan, General Notes, Legend & Symbols)

Annex – C : M-1/A, M-1/B & M-1/C Equipment Schedule

Annex – D : M-2 Basement A/C and ventilation layout

Annex – E : M-3 Ground floor A/C and ventilation layout

Annex – F : M-4 2nd, 3rd and 4th floor A/C and ventilation layout

Annex – G : M-5 5th floor A/C and ventilation layout

Annex – H : M-6 Roof deck equipment and FCU layout

Annex – I : M-7 Basement equipment layout

Annex – J : M-8 Chilled and condenser water pipes schematic diagram

Annex – K : M-9 Equipment schedule

ATTACHMENT--------------------------------------------------------------------------54

- Application for Registration with out Examination

- Affidavit of Applicant

- Affidavit of Competency

- Notice of interview, signed by two (2) members

- Curriculum Vitae of Applicant

- Certificate of Experience

ii
iii

You might also like