You are on page 1of 3

10/4/2017 Product Development Portal -- Dashboard

Hello, manikandanv! Change Password Logout

Recent Part / Color / TPL / CPL System Product Development Test Lab Workflow Proto Development Quality Assurance Admin Knowledge Base

Dashboard External DMR PRE DR Review Pre DR Review - View

Pre DR Review - View

Pre DR Review Process Flow

Product Type NEW PRODUCT EXISTING PRODUCT

* Pre DR Review PREDRREV/17/617


No

* Pre DR Review 27-04-2017


Date
DMR Number DMR Number DMR Description
IDMR/11/16/424 Commonization of Neutral switch.

Project / DMR No 424

* Project / DMR Commonization of neutral switch.


Title

Attachment Modification details.ppt

Pre DR Review SNo Criteria Discussion


Details
To commonized the neutral switch for all 350 cc , 500 cc &
535 models.
1 Purpose

Complete release.

2 Clearance For

100%

3 Implementation Plan

Tryout completed.

4 Evaluation Done

All UCE 350 cc,500 cc and 535 cc engines.

5 Applicability

6 Cost Impact

7 Overall Decision (Clearance For DR)

8 Further Action (In case decision is not to issue DR)

Use as it is.

9 Stock Disposition

* Material Team selvaraj r


Coordinator

MSE TVT Team

Option 1 Alagar T

http://reapp:8082/ 1/3
10/4/2017 Product Development Portal -- Dashboard
Option 2

Option 3

MSE ORG Team

Option 1 N Saravanan

Option 2

Option 3

MFG TVT Team

Option 1 Madan Sekar

Option 2

Option 3

MFG ORG Team

Option 1 Ravikumar Murthy Rajam

Option 2

Option 3

Other Team

QC TVT T Sangeeth Cletus

QC ORG Parasuraman S

MKT

SERVICE Pasupathi E

Pre DR Parts
Addition Deletion
Addition Addition Cost Deletion Deletion Cost Available Implement Implement
S.No Part Part Total Variance Attachment
Part Rev Part Qty A Part Rev Part Qty B Stock Pilot Bulk
Number Number

1 582510 c 1 26.1 591494 b 1 27.1 20000 542000 -1 582510_c.pdf

Pre DR Parts
Deletion
(Deletion) Deletion Deletion Available
S.No Part Cost A Cost B Total Variance Implement Pilot Implement Bulk Attachment
Part Rev Part Qty Stock
Number

1 591494 b 1 0 591494_b.pdf

MATLS BUYER selvaraj r

MATLS TEAM Ganesan M


LEAD
SQA Ganesan M

HEAD MATLS venkatesan s

Remarks/Approval
Description

Feedback
Comments

http://reapp:8082/ 2/3
10/4/2017 Product Development Portal -- Dashboard

SNo. Team Feedback Status User Co

1 Originator Saved MADASAMY A 27-04-2

2 Originator Submitted MADASAMY A 27-04-2

3 Checker Approved By Checker RAJU P 27-04-2

4 Design TL Approved By Design Team Lead RAJU P 27-04-2

5 MSE ORG MSE ORG Prepared N Saravanan 27-04-2

6 MSE ORG - TL MSE ORG Approved G Ravi Kumar 27-04-2

7 MFG TVT MFG TVT Prepared Madan Sekar 28-04-2

8 MFG ORG MFG ORG Prepared Ravikumar Murthy Rajam 28-04-2

9 QC TVT QC TVT Prepared T Sangeeth Cletus 28-04-2

10 QC ORG QC ORG Prepared Parasuraman S 28-04-2

11 Service Service Commented Pasupathi E 28-04-2

12 MSE TVT MSE TVT Prepared Alagar T 05-02-2

13 Material Team Coordinator 100% implementation. Approved By Material Team Coordin… selvaraj r 05-03-2

14 Material Buyer Costing 100% implementation Prepared By Material Buyer Costing selvaraj r 05-03-2

15 Material Team Lead Approved By Material Team Lead Ganesan M 05-03-2

16 SQA Approved By SQA Ganesan M 05-03-2

17 Material Head Approved By Material Head venkatesan s 05-03-2

Report Reload Close Help

© 2017 -

This site is best viewed in Firefox version 12.0 or higher, Google Chrome version 16.0 or higher, Internet Explorer 9.0 or higher and Safari version 5.0 or higher.

Developed by: Canwin Technologies

http://reapp:8082/ 3/3

You might also like