DISTRICT COOLING PLANT EXCAVATION

EXPO 2020 (Grid Calculations)
FORMATION 
SPOT HEIGHT NO. OF GRID X
GRID LEVEL CUT/FILL
F.GL. GRIDS CUT / FILL
O.GL.
A1 12.100 DMD 12.201 DMD 1 0.101 0.101
A2 12.100 DMD 10.802 DMD 2 ‐1.298 ‐2.596
A3 12.100 DMD 10.803 DMD 2 ‐1.297 ‐2.594
A4 12.100 DMD 10.700 DMD 2 ‐1.400 ‐2.8
A5 12.100 DMD 10.676 DMD 2 ‐1.424 ‐2.848
A6 12.100 DMD 10.798 DMD 1 ‐1.302 ‐1.302
B1 12.100 DMD 10.906 DMD 2 ‐1.194 ‐2.388
B2 12.100 DMD 10.848 DMD 4 ‐1.252 ‐5.008
B3 12.100 DMD 10.804 DMD 4 ‐1.296 ‐5.184
B4 12.100 DMD 10.736 DMD 4 ‐1.364 ‐5.456
B5 12.100 DMD 10.804 DMD 4 ‐1.296 ‐5.184
B6 12.100 DMD 10.814 DMD 2 ‐1.286 ‐2.572
C1 12.100 DMD 10.794 DMD 2 ‐1.306 ‐2.612
C2 12.100 DMD 10.660 DMD 4 ‐1.440 ‐5.76
C3 12.100 DMD 10.774 DMD 4 ‐1.326 ‐5.304
C4 12.100 DMD 10.774 DMD 4 ‐1.326 ‐5.304
C5 12.100 DMD 10.774 DMD 4 ‐1.326 ‐5.304
C6 12.100 DMD 10.774 DMD 2 ‐1.326 ‐2.652
D1 12.100 DMD 10.859 DMD 1 ‐1.241 ‐1.241
D2 12.100 DMD 10.870 DMD 2 ‐1.230 ‐2.46
D3 12.100 DMD 10.813 DMD 2 ‐1.287 ‐2.574
D4 12.100 DMD 10.773 DMD 2 ‐1.327 ‐2.654
D5 12.100 DMD 11.010 DMD 2 ‐1.090 ‐2.18
D6 12.100 DMD 12.770 DMD 1 0.670 0.67
N0. OF GRID AVG TOTAL
TOTAL AREA
POINTS CUT/FILL CUT/FILL
‐75.206 60 ‐1.253 854 ‐1070.43 m³
Ramp Area
1 16.215 DMD 16.215 DMD 2 0.000 0
2 16.189 DMD 15.400 DMD 2 ‐0.789 ‐1.578
3 16.408 DMD 13.690 DMD 2 ‐2.718 ‐5.436
4 16.452 DMD 11.980 DMD 2 ‐4.472 ‐8.944
5 16.514 DMD 16.514 DMD 1 0.000 0
N0. OF GRID AVG TOTAL
TOTAL AREA
POINTS CUT/FILL CUT/FILL
‐15.958 9 ‐1.773 312.47 ‐554.05 m³
Less Volume of Piles
PILE # DIAMETER QUANTITY AREA VOLUME
P01 900 18 11.45111 14.35319699
P02 1000 16 12.56637 15.75110781
P03 1200 45 50.8938 63.79198662
P04 1200 2 2.261947 2.835199405
Pile Head (VOLUME) = 96.73 m³

EXCAVATION NET (VOLUME) = 1527.7 m³