DOCUMENT TRANSMITTAL ADVICE
Total Pages: 1 + x
Forwarded To: Type of Status
A - Approved (Issue as IFC*)
B - Approved Except as Noted
(Issue as IFC* with incorporated comments)
C - Approved Except as Noted & Resubmit
D - Not Approved
E - As Built
F - For Information
G - Superseded
H - See Remark
I - Collect Stamped Document from EFC Office
J - Rejected
*IFC = Issued For Construction
It.
Originat Document / Re Stat
No DTS No. & Date Subject
or Drawing No. v us
.

[0] [FAT Report] [B]

Remarks:

Originator’s Signature Designation Date

Momcilo Mrvic
Project Director

Please acknowledge receipt by returning one signed copy of this sheet (or fax confirmation to be attached).
Receiver’s Signature Designation Date

MN

41227471.xls 10/03/2010 Page 1/12


DTA Ref. No.:

Item No. Drawing / Document No. Rev. 0


1 PH-0A-26-71-0101 MESAIEED MARKET

COMMENTS
1 Water tank enclosure
Please provide Aluminum louver instead GRC panel enclosure around water tank
as per Tender specification.
Description

11kV SUBSTATION SITE DEVELOPMENT PLAN

CONTRACTOR REPLY:
DTA Ref. No.:

Item No. Drawing / Document No. Rev. 0


1 PH-0A-26-71-0805 MESAIEED MARKET

COMMENTS
5 Section A-A
Please show HVAC duct left from the axis 15. Adjust it with the Ground floor.

1 Section B-B - Windows


Please adjust the label of the window between the axes 12 & 13 with the
Ground floor.

7 Section B-B - Ground floor


Pleas show HVAC duct in the axis 10. Adjust it with the Ground floor.

7 Section B-B - Roof


Please check the door height on the roof and the position of the canopy right
from the axis 15.

7 Section C-C - Ground floor


Please show the HVAC duct right from the axis D, Adjust it with the Ground
floor.

7 Section C-C - Ground floor


Please adjust the door label in the Swithgear Room with the base of ground
floor.

7 Section D-D - Basement


Please adjust the height of the first stair with the basement. In the base of
basement, the first stair was shown 55mm in relation to the basement level,
whereas in the cross section D-D it was shown 235 mm in relation to the
Basement. Please correct this.

7 Section D-D - Ground floor


Please show the HVAC duct right from the axis A, Adjust it with the Ground
floor.

12 Section D-D - Roof


Please show HVAC equipment on the roof between the axes A-B.
12 Section D-D - Roof
Please provide Aluminum louver instead GRC panel enclosure around water
tank as per Tender specification.
Description

11kV BUILDING ARCH'L SECTIONS A & B (G.A.)

CONTRACTOR REPLY:
DTA Ref. No.:

Item No. Drawing / Document No. Rev. 0


1 PH-0A-26-71-0804 MESAIEED MARKET

COMMENTS
1 Water tank enclosure - Elevation 1, 2 & 3
Please provide Aluminum louver instead GRC panel enclosure around water
tank as per Tender specification.
Description

11kV BUILDING ARCH'L ELEVATIONS 1 & 2 (G.A.)

CONTRACTOR REPLY:
DTA Ref. No.:

Item No. Drawing / Document No. Rev. 0


1 PH-0A-26-71-0803 MESAIEED MARKET

COMMENTS
1 Water tank enclosure
Please provide Aluminum louver instead GRC panel enclosure around water
tank as per Tender specification.

4 HVAC Ducts
Although in your reply you wrote Noted please check agen whether the parapet
height between the axes 10 - 11 is enough for covering A/C ducts and
equipment. In case it is not, please provide aluminium louvers about the ducts
and A/C equipment.
Description

11kV BUILDING ARCH'L ROOF PLAN (G.A.)

CONTRACTOR REPLY:
DTA Ref. No.:

Item No. Drawing / Document No. Rev. 0


1 PH-0A-26-71-0802 MESAIEED MARKET

COMMENTS
1 Windows
Please adjust the label of the window between the axes 12 & 13 with the
Elevation 1.
Description

11kV BUILDING ARCH'L GROUND FLOOR PLAN (G.A.)

CONTRACTOR REPLY:
DTA Ref. No.:

Item No. Drawing / Document No. Rev. 0 Description


1 PH-0A-26-71-0801 MESAIEED MARKET 11kV BUILDING ARCH'L BASEMENT FLOOR PLAN (G.A.)

COMMENTS CONTRACTOR REPLY:


1 Stair 1
Our previous comment has not been incorporated in this drawing, hence we
repeat it: You should change the mark at the beginning of Stair 1 from DN into
UP.

2 Stair 2
Please adjust the height of the first stair with the basement. In the base of
basement, the first stair was shown 55mm in relation to the basement level,
whereas in the cross section D-D it was shown 235 mm in relation to the
Basement. Please correct this.

41227471.xls 10/03/2010 Page 12/12