You are on page 1of 3

Chapter 3 Explosive Services - Involve virtually no contact

between customers and production labor.


Importance of the service sector These services offer high innovation potential as
The service sector, also called tertiary sector, is technological advances decrease cost
substantially.
the third of the three traditional economic
sectors.
Criteria for Competition
Primary sector – farming, mining & fishing 1. COST 3. Quality
Secondary sector – manufacturing 2. Dependability 4. Flexibility or
Includes all branches of human activity whose customization
essence is to provide services, thus providing a Service Strategy of a Firm
work, knowledge, financial resources, Positioning - A service firm must carefully
examine and evaluate its position with respects
infrastructure, goods or their combination.
to its competitors in order to determine an
DISTINCTIVE FEATURES OF SERVICE SYSTEMS effective strategy.

The key distinction between service and Implication for the manager
manufacturing systems is that SERVICES are A manager should gain a clear understanding of
intangible outputs that are consumed in the which criteria are relatively more important for
process of their production. his or her firm.

A Classification of Service Systems Chapter 5: Inventory Planning and Control


The service sector does not consist of a
homogeneous group of services.
The industries within the service sector are too
SYMPTOMS OF MISMANAGED INVENTORIES
heterogeneous for a common frame of analysis.
Classification Scheme 1. Total amount of inventory rises
(by Baumol 1984) faster than the growth of sales
1. Stagnant Personal Services 2. Stockouts of items occur, causing
2. Substitutable Personal Services interruptions and delays
3. Progressive Services Explosive Services 3. Clerical costs for procuring,
Stagnant Personal Services - these services
expediting, and maintaining
frequently require direct contact between the
inventories become too high
customer and the service provider.
4. Too much quantity in stock
these services offer low innovation potential
5. Items are missing or misplaced.
and are difficult to standardize.
Spoilage rates are too high
The Substitutable Personal Services - these
services also require direct personal contact,
and they have characteristics similar to stagnant COMMON SOURCES OF SAVINGS
personal services.
Progressive Services - These services have two 1. Lower purchase cost
components 2. Lower interest expenses
One component requires little labor and 3. Increase in availability of internal
considerable cost reductions are possible with funds
it. 4. Lower operating costs
The second component is highly labor intensive 5. Lower production cost per unit
and is much like stagnant personal services. 6. Dependable delivery of production
7. Better customer service
Controls for Class B items - Items should be
monitored and controlled by a computer-based
Basic Inventory Model - Objective is to
system.
determine the optimal order quantity that
minimizes the total incremental costs of holding Controls for Class C items - Items account for
inventory and processing orders. the great bulk of inventory items, and carefully
designed but routine controls should be
Holding Cost - Costs associated with inventory
adequate.
level.
Chapter 6: Material Requirements Planning
Preparation Cost - Costs associated with the
number of orders placed. Requirements Planning Concepts:

 Bill of Materials
 Demand dependence
Inventory Models with Uncertain Demand
 Product structures
Single Period Model - Only a single  Forecasting versus Requirements
procurement is made over a single, well-defined
time period. This is applicable for stocking Bill of Materials – is constructed in a way that
seasonal inventories. reflects the manufacturing process. Information
useful to a material requirements system in a
Order quantity-reorder point model - form that can be maintained in a computerized
Considers the situation, commonly faced by file.
materials managers, when an item is Indented Bill – the dependence of parts and
continuously demanded. Determine the size components is indicated by indenting items in
and when that order should be placed, reorder the list.
point. Inventory Planning Systems
Lot Size Decision Policies
Service Level Method - Management specified  Lot-for-Lot
a policy such as stockouts should not occur  Economic Order Quantity (EOQ)
more than percent of time. ROP is simply  Period Order Quantity (POQ)
determined by the probability distribution for  Part-Period Total Cost Balancing
demand during lead time. Buffer Stocks in Requirements Systems
 Safety Lead Time
Inventory Control Systems: 3 relevant  Safety Stock
questions Lot-for-Lot – the lot size for a batch is chosen to
satisfy the net requirements for a single period.
1. How often should the assessment of
Is cost-effective only when set-up costs are
stock on hand be made?
extremely small in relation to holding costs.
2. When should a replenishment order
Economic Order Quantity (EOQ) – EOQ is
be placed? calculated based on expected requirements.
3. What should be the size of the Batch size is set to EOQ. Is not optimal in
replenishment order? material requirements planning systems
ABC CLASSIFICATION OF INVENTORY ITEMS because the assumption of constant demand is
Controls for Class A items - Close control is not met.
required for inventory items that have high Period Order Quantity (POQ) – size is set equal
to the actual requirements in a predetermined
stockout costs and those items that account for
number of periods. Thus, the excess inventory
a large fraction of the total inventory value.
that may be carried under an EOQ policy is
eliminated.
Part-Period total cost balancing – holding costs
and set-up costs are balanced as closely as
possible for each lot size decision.
Buffer stocks in requirements systems – are
designed to absorb random variations in the
supply schedule.
Safety Lead Time – if the lead time for
manufacturing a component or a part is
variable, then stockouts could occur if a batch is
not scheduled for production sufficiently in
advance of actual requirements.
Safety stock – is needed to guard against
variability. Is determined by considering the
cost of stockouts and cost of holding excess
inventories.

You might also like