CHAZA CA-GYC SEMANA 05 (28/01/2018 a 03/02/2018)

POTENTIAL DOWNTIME LOSSES Run life Production decrease


ITEM DATE WELL BOPD Hrs BBLS Days DESCRIPTION WORK
since Jun/01st (BOPD)
1 domingo 28 de enero de 2018 CYC-03 205 2 17 na Perform branches pruning to power lines in well location CYC-03
Preventive Maintenance 300 H engine CAT-3406 UBH GYC-02, Chenge from
2 domingo 28 de enero de 2018 GYC-02 286 4 48 na
plunger to pump W 2350

Jet pump services due to run life: 176 days and decreasing potential production in
4 martes 30 de enero de 2018 JNB-03 96 4 16 177 -63 comparison with last test after jet Pump services. (35↓bls) performed the 07-08-
2017. The day 18-11-2017 performed Jet pump service, without success.

VSD-MQT03: Change of speed controller capacitors, if this anomaly is not corrected,


5 miércoles 31 de enero de 2018 MQT-03 184 4 31 na
the equipment can be left out of service.

6 jueves 1 de febrero de 2018 JNB-01 197 4 33 91 -63 Perform jet pump service to prevent stuck

Changing the gears of the gearbox, changing the fluid end of the pump due to
8 sábado 3 de febrero de 2018 MQT-21 172 8 57 na
damage to the cylinder inserts.
Total [bls] 185

SANTANA SEMANA 05 (28/01/2018 a 03/02/2018)


WELL POTENTIAL DOWNTIME LOSSES Run life Production decrease
ITEM DATE DESCRIPTION WORK
BOPD Hrs BBLS Days since Jun/01st (BOPD)
1 lunes 29 de enero de 2018 MRF-01 78 4 13 na Preventive Maintenance 300 H engine CAT-3406 UBH MRF-01
Jet pump services due to run life: 105 days. Change of CAT-3408 engine by
2 miércoles 31 de enero de 2018 MRY-03 52 8 17 105 0
cummins engine NTA-855, by oil passage to the cooling system.

Jet pump services due to run life: 105 days and decreased potential production( -9).
3 sábado 3 de febrero de 2018 TYC-03 115 4 19 222 -9 Preventive Maintenance 300 H engine CAT-3406 ENG-1044. Preventive
Maintenance 300 H engine CAT-3406 ENG-2223
Total [bls] 50

RENTAL SEMANA 05
WELL POTENTIAL DOWNTIME LOSSES Run life Production decrease
ITEM DATE DESCRIPTION WORK
BOPD Hrs BBLS Days since Jun/01st (BOPD)
MTU CYC-09: change fluid end guides, change of plunger packing # 5,
1 domingo 28 de enero de 2018 CYC-09 133 6 33 na
by high vibration in the fluid-end module
Total [bls] 33

MANTENIMIENTO A GENERADORES A GAS SO ENERGY SEMANA 05 (28/01/2018 a 03/02/2018)

ITEM DATE EQUIPMENT DOWNTIME DESCRIPTION WORK

1 lunes 29 de enero de 2018 PM – 8 3 Mantenimiento Preventivo E40


2 martes 30 de enero de 2018 PM – 4 3 Mantenimiento Preventivo E40
3 miércoles 31 de enero de 2018 PM – 3 3 Mantenimiento Preventivo E40