Professional Documents
Culture Documents
Jet pump services due to run life: 176 days and decreasing potential production in
4 martes 30 de enero de 2018 JNB-03 96 4 16 177 -63 comparison with last test after jet Pump services. (35↓bls) performed the 07-08-
2017. The day 18-11-2017 performed Jet pump service, without success.
6 jueves 1 de febrero de 2018 JNB-01 197 4 33 91 -63 Perform jet pump service to prevent stuck
Changing the gears of the gearbox, changing the fluid end of the pump due to
8 sábado 3 de febrero de 2018 MQT-21 172 8 57 na
damage to the cylinder inserts.
Total [bls] 185
Jet pump services due to run life: 105 days and decreased potential production( -9).
3 sábado 3 de febrero de 2018 TYC-03 115 4 19 222 -9 Preventive Maintenance 300 H engine CAT-3406 ENG-1044. Preventive
Maintenance 300 H engine CAT-3406 ENG-2223
Total [bls] 50
RENTAL SEMANA 05
WELL POTENTIAL DOWNTIME LOSSES Run life Production decrease
ITEM DATE DESCRIPTION WORK
BOPD Hrs BBLS Days since Jun/01st (BOPD)
MTU CYC-09: change fluid end guides, change of plunger packing # 5,
1 domingo 28 de enero de 2018 CYC-09 133 6 33 na
by high vibration in the fluid-end module
Total [bls] 33