Professional Documents
Culture Documents
A 1 B C D E 1 F G
7'-42" 7'-9" 5' 3' 7'-42" 8'-3"
3'
1 4' 4'-71"
1'-42" 2
1 8'-9"
8'-9"
3"X4" TIMBER WALL PLATE 3"X4" TIMBER WALL PLATE
2
C1 C1 C1 C1
12'-9"
3"X5" TIMBER RAFTERS
14'
@ 2'-0" C/C
3'-6"
4 C1 C1
1'-3"
T12-5" C/C-B1
5'-9"
3'-6" 3'-6"
10'-9"
3"X4" TIMBER COBLE PLATE
5
C1 C1
6"
3'-
3'
T10-6" C/C-B2
3' 2T16
7'-3"
6
T10-5" C/C-B2
T10-6" C/C-T2
6"
C1
3'-
3'-6"
T12-6" C/C-T1
2T16
7
C1 FC1
9'-9"
2'-6"
2T16
T12-6" C/C-T1
2'-6" 3'-6"
3'-6"
3'-6"
9'-9"
8 T10-6" C/C-B2
T10-6" C/C-T2 C1 3"X4" TIMBER COBLE PLATE C1
3'-6"
2'-6"
9
C1 3"X4" TIMBER COBLE PLATE
T12-6" C/C-T1
14'-9"
10
3"X5" TIMBER RAFTERS C1 C1
@ 2'-0" C/C
3"X4" TIMBER WALL PLATE
7'-6"
10'-3"
12
C1 C1
# C1 - 9"x9" RC COLUMN
# FC1 - 9"x9" RC FLOATING COLUMN
# RFB.. - ROOF TERRACE SLAB RC BEAM
# RB.. - ROOF RC BEAM
# S.F.L. = F.F.L. - 2"
# S.F.L. = STRUCTURAL FINISHED LEVEL
# F.F.L. = ARCHITECTURAL FINISHED LEVEL
DRAWING TITLE : ROOF STRUCTURE & ROOF TERRACE SLAB R/F LAYOUT DATE : 17-08-2018 R1
PROJECT : PROPOSED HOUSE FOR MRS. M.F.F.SHAFANA AT NO : 19 A, N.H.PLACE, CHINA FORT, BERUWALA. DRG. NO. : STR/SHR - 10 A3