COST SUMMARY

INSTRUCTION
WORK COMPLETION REPORT
RATE BUILD-UP ANALYSIS
VARIATION WORK

SUPPLY OF WATCHMAN
PERIOD 04-06-18 TO 15.07.18
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

BREAKING/CUTTING OF PILES &


CONCRETE FOUNDATIONS
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

A-FRAME SHIFTING & AGAIN


RELOCATING TO ITS ORGINAL POSITION
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

SPX MIXER MATERIAL


RECEIVING & INSTALLATION
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

LOADING, UNLOADING & SHIFTING OF BITUMEN


TANK 1 & 2 SHAFT, MIXER, IMPELLER ETC
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

EXTENSION TO DIESEL TANK BUND WALL


(PHASE – 1)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

WOQOD DIESEL TANK SHIFTING NEAR


DISPATCH BUILDING
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

PMB PANEL ROOM DOOR RELOCATION


(PHASE – 1)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

MODIFICATION OF 8” PONTOON – FIXING OF


6” ELBOW 900
(PHASE – 1)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

SUPPLY OF ANCHOR BOLTS, PLATE


(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

CORRECTION OF PONTOON GANTRY FACILITY


(PHASE – 1)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

FLEXIBLE HOSE LOADING FOUNDATION &


REINSTALLATION OF HOLDING POST
(PHASE – 1)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

SURVEY WORKS
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

ENGINEERING WORKS TO
INTERCONNECTING BRIDGES
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

EHT CKT 206 – EMERGENCY RESPONSE


(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT
VARIATION WORK

MODIFICATION OF PHASE-1
DISCHARGE LINE & PUMP ERECTION
(PHASE – 2)

CONSTRUCTION OF BITUMEN TERMINAL EXPANSION AT MESAEED


INDUSTRIAL PORT