Conceptual Designing
Academy of Hospital
1
12/4/2016
Conceptual Designing
Design Development
• Deliverables at the end of schematic design:
• Design development (DD) phase of architectural design
– Conceptual site plan begins after the approved conceptual design
– Preliminary building plans with elevations and sections • The aspects of design depicted are:
– Perspective sketches – architectural,
– Study models – structural,
– Electronic visualizations, and – HVAC,
– Electrical,
– Statistical summary of the design area and other
characteristics in comparison to the programme – Plumbing and
requirements – Fire Protection Systems are essential
7 8
9 10
2
12/4/2016
13 14
3
12/4/2016
19 20
Working Drawing
• The quality of production information is extremely important
• Unless it is prepared and coordinated properly, there will be TO BE CONTINUED
disputes and delays on site as well as cost escalation
• Common problems with working drawing are:
– Poor co-ordination of information
– Errors and omissions
– Information not going to right people
– Poor presentation
• Working Drawings may be updated when the works are
completed
– This reflects changes to the works that may have worked
21 22