Saigon M&C Tower Project
Method Statement For Ductworks
General:
Items: - The Method Statement for Air Distribution Installation Works.
Aim:
The aim of works is to describe mechanical works associated with installation of Air
Distribution Installation Works and to ensure compliance with contract requirements,
specification and quality control.
Scope of Works:
The scope of work for this method statement shall include all the Ductworks for the
SAIGON M&C TOWER Project.
Methodology:
Duct Size (L max) Up to 400 600 800 ~ 1250 1600 ~ 2500 Above 2500
Angle steel
(see table 3)
Detail A L ≤ 1200
100 100
100
5mm thk
Washer Rubber gasket
Bolt & Nut 8mm Width: 25mm, 5mm thk
Air flow
Air flow Main duct
Branch duct W
L = 0.25W; L≥150mm
Air flow
Figure 4: Branch duct connection detail (using Transverse Duct Connector (TDC) joint)
Air duct
C
B
A ≤ 150 mm
B ≤ 200 mm
C
100 mm ≤ C ≤ 150 mm
Page 5
Saigon M&C Tower Project
Method Statement For Ductworks
Duct Size largest dimension (mm) Less than 700 700~1200 1200~1500
TDC joint
Corner plate
(see detail) Air duct
Max 1100
TDC flange
Bolt M10
TDC corner 1.2mm thk
TDC duct end
(see table 4)
Nut M10
Rubber gasket
(see figure 08)
Nut M10
Bolt M10
Rubber gasket
(see figure 08)
Page 6
Saigon M&C Tower Project
Method Statement For Ductworks
Rubber gasket
Width: 25mm 15-20mm
Thickness: 5mm
) Note:
? Support, hanger will be concerned on method statement of M&E Support System Installation
Work: ME - REE - T+ - MS – G+ - GEN - 003
Air Duct 50
Seal
50
Air Duct
Page 7
Saigon M&C Tower Project
Method Statement For Ductworks
Air Duct
Page 8
Saigon M&C Tower Project
Method Statement For Ductworks
Metal clip
Pin Φ1.6mm
(see figure 15)
Figure 14: Insulation detail for supply air chambers and sound attenuation fitings
Page 9
Saigon M&C Tower Project
Method Statement For Ductworks
Max. 300mm
Max. 300mm
Pin Φ1.6mm
Metal clip
Insulated duct
Bare duct
Max. 300mm
Max. 300mm
Page 10
Saigon M&C Tower Project
Method Statement For Ductworks
Front view
Pin Φ 1.6mm
50mm
25mm
Flange joint
Metal slip
Glasswool 25mm thk
50mm
25mm
25mm
Figure 16: Typical insulation menthod for TDC joint & flange joint
Screw
Glasswool 25mm thk
(outside duct)
Aluminum tape 25mm
Ceiling
Screw Wall
TDC joint
VD
D Air flow
Air duct
L
VD
L = 8D
D: diameter of air duct
Air Fan
Duct size or Diameter (mm) Less than 300 Over 300 Less than 300 Over 300
Page 12
Saigon M&C Tower Project
Method Statement For Ductworks
Wall
Anchor bolt
Angle steel
Bolt M8
PLAN VIEW
Fire damper
Insulation 25mm
Vertical duct
V-Angle steel
FRONT VIEW
Page 13
Saigon M&C Tower Project
Method Statement For Ductworks
2. Diffusers, Registers:
D H+50mm H+50mm
Flexible
K K
Ceiling Ceiling
W×H W×H
H, W: Dimension of Diffusers opening size for ceiling (mm)
K = 150 ~ 300mm
d : Diameter of flexible duct (mm)
Insulation (outside)
Opposed blade damper Glass wool 25mm thk
(if any) Insulation (outside)
Glass wool 25mm thk
Ceiling
Insulation (inside)
RETURN AIR CHAMBER BOX
Glasswool 25mm thk
Insulation (outside)
Screw Glass wool 25mm thk
Ceiling
Ceiling
Page 15
Saigon M&C Tower Project
Method Statement For Ductworks
A Sound Absorber by
Silencer Elbow glasswool 50mm thk
R
A
L
Sound Absorber by
glasswool 50mm thk
B
Silencer Chamber
Detail D
Detail E A
Detail E
GI sheet cover
0.6mm thk
25~50mm
Sound Absorber by
glasswool 50mm thk
Page 16
Saigon M&C Tower Project
Method Statement For Ductworks
Detail D
Sound Absorber by
glasswool 50mm thk
Pin Φ1.6mm
25~50mm
75mm 100~150mm
Insulation (inside)
Steel band Bolt M6
Glasswool 25mm thk G.I.sheet 0.6mm thk
Steel band
Screw 3.2Ø
G.I.sheet 0.6mm thk
Insulation (outside) Opposed blade damper
Glasswool 25mm thk (if any)
Insulation (outside)
Ceiling Glass wool 50mm thk
Figure 28: Detail of typical connection between flexible duct & chamber box
Page 17
Saigon M&C Tower Project
Method Statement For Ductworks
b) Canvas Joints:
Duct canvas
Detail F
Detail F
Rubber gasket (width:5mm)
Angle steel flange
Washer
Bolt and nut M8
Insulation (inside)
Glasswool 25mm thk
Figure 30: Detail of typical connection between canvas & chamber box
Page 18
Saigon M&C Tower Project
Method Statement For Ductworks
Concrete slab
Wall
Anchor bolt
Mortar Grout
Hanger rod
Louver Chamber
box Angle steel
500mm (see table 3)
Anchor bolt
Access door
(see figure 32)
Page 19
Saigon M&C Tower Project
Method Statement For Ductworks
b) Access door:
Steel plate
Screw 3.2Ø Air duct
Sach lock
c) Outdoor Hood:
Mortar
Wall
Sealant
Rockwool 60kg/m3
Outdoor hood
Screw
Air duct
Insect Screen
(if any)
Chamber box
GI sheet cover
0.6 mm thk
.
Figure 33: Typical Outdoor Hood Installation Detail
Page 20