MEDIDAS

ITEM DECRIPCION Y DETALLES UND N° DE VECES


L
OE 02.01.03 RELLENOS
OE 02.01.03.01 RELLENOS CON MATERIL PROPIO EN CAPS DE 0.20m
Z-1 (1.20X1.20) m3 2 1.20
COLUMNA m3 -2 0.30
VIGA CIMENTACION m3 -2 0.90
Z-2 (1.10X1.10) m3 4 1.10
COLUMNA m3 -4 0.25
VIGA CIMENTACION m3 -4 1.65
Z-1 (1.40X1.20) m3 2 1.40
COLUMNA m3 -2 0.25
VIGA CIMENTACION m3 -2 0.95
EJE A-A, C-C m3 4 1.30
EJE 1-1, 3-3 m3 4 2.30
VEREDA m3 0.044 8.00

CIMIENTO Z-1 m3 -2 0.90


CIMIENTO Z-2 m3 -4 1.65
CIMIENTO Z-3 m3 -2 0.95
OE 02.01.03.02 NIVELACION INTERIOR Y APISONADO
INTERIOR m2 26.24 AREA CALCULADA
OE 02.01.03.03 ELIMINACION DE MATERIAL EXCEDENTE
ELIM.=(VOL. MAT.X EXCAVADOX%ESPONJAMIENTO)-(VOL. RELLENOX(%ESPONJAMIENTO/COEFICIENTE DE REDUCCION)) ESPONJAMIENTO=1.25 CO
(23.69X1.25)-(7.51X(1.25/0.80)) m3
OE 02.02 OBRAS DE CONCRETO SIMPLE
OE. 02.0201 CIMIENTON CORRIDO MEZCLA 1:10 C:H+30%P.G. MAX. 6" m3
EJE A-A, C-C m3 4 2.55
EJE 1-1, 3-3 m3 4 3.62
INTERIOR m3 1 7.50
OE 02.02.02 SOLADOS e=10cm f´c=100kg/cm2 1:12
Z-1 m2 2 1.2
Z-2 m2 4 1.1
Z-3 m2 2 1.4
OE 02.02.03 SOBRECIMIENTOS MEZCLA 1:8 C:H+25% PM MAX. 4"
EJE A-A, C-C m3 4 2.55
EJE 1-1, 3-3 m3 4 3.62
INTERIOR m3 1 7.5
(-) PUERTA EJE (1-1) m3 -1 1.3
OE 02.02.04 ENCONFRADO Y DESENCOFRADO DE SOBRECIMIENTOS
EJE A-A, C-C m2 4 5.10
EJE 1-1, 3-3 m2 4 7.24
INTERIOR m2 1 15.00
(-) PUERTA EJE (1-1) m2 -1 2.60
OE 02.02.05 FALSO PISO e=10cm f´c=100kg/cm2
m2 AREA AD=43.67-1.49
MEDIDAS
PARCIAL TOTAL
A H

7.51
1.20 0.90 2.59
0.25 0.90 -0.14
0.20 0.30 -0.11
1.10 0.90 4.36
0.30 0.90 -0.27
0.20 0.30 -0.40
1.20 0.90 3.02
0.40 0.90 -0.18
0.20 0.30 -0.11
0.20 0.30 0.31
0.20 0.30 0.55
AREA=0.044 VER PLANO
METRADOS 0.35
0.40 0.60 -0.43
0.40 0.60 -1.58
0.40 0.60 -0.46

REA CALCULADA 26.24 26.24

DUCCION)) ESPONJAMIENTO=1.25 COEF. DE RED. = 0.80


17.88 17.88

9.01
0.40 0.70 2.86
0.40 0.70 4.05
0.40 0.70 2.10
13.97
1.2 1.2 3.46
1.1 1.2 5.81
1.4 1.2 4.70
1.85
0.15 0.4 0.61
0.15 0.4 0.87
0.15 0.4 0.45
0.15 0.4 -0.08

0.4 8.16
0.4 11.58
0.4 6.00
0.4 -1.04

42.18