You are on page 1of 1

8th Feb 2018

To Whom it may concern :

This is to certify that tentative cost estimate including moderate finishing of Residential Building of
Sailung Construction Company Pvt Ltd at Manbhawan ,Lalitpur Metropolitan city Ward no:5, plot no
976 within land of 1-0-0-0 on basis of plinth area as per market rate with attached drawing is as follow:

Technical Details of the Building:

Type of Structure : RCC Frame structure

Number of Storey:

As per Approved Drawing :Basement + 4 & half

The rate per unit built up area of the building is adopted based on its structural system,
type of materials used for construction, type of finishing works etc. Besides, the building’s location, its
aesthetic and commercial values are also considered while adopting its rate per unit built up area to
calculate the total value of the building as a whole.

Description Total Floor area Rate per sq.ft Amount

A)Basement Floor with raft foundation 2736.19 6500 17785235

B) Ground Floor 2736.19 5500 15049045

C)First Floor 2924.70 5500 16085850

D)Second Floor 2924.70 5500 16085850

E) Third Floor 2924.70 5500 16085850

F)Fourth Floor 800.82 5500 4404510

TOTAL : NRs 85496340

In words : Eight Crore Fifty Four Lakhs Ninty Six Thousand Three Hundred And Forty Only

……………………….

Er . Sandip Budhathoki

Civil Engineer

You might also like