PROPOSED CHURCH BIULDING DEVELOPMENT

ITEM DESCRIPTION QTY UNITRATE SHS


ELEMENT NO.1

SUBSTRUCTURES (ALL PROVISIONAL)

A Clear site of shrubs, bush and burnt the arising


materials. SM 110 -

B Excavate oversite average 200mm deep to remove


vegetable soil; load and dispose at municipal
dumping site distance not exceeding 3.00km away.
SM 110 -

C
Excavate in normal soil for column bases starting at
stripped level to a depth not exceeding 1500mm.
CM 200 -

D Ditto depth 1500mm - 3000mm CM 200 -

E Excavation for foundation footing starting at


stripped levels to depth not exceeding 1500mm. CM 200 -

F Return, fill in and ram selected excavated material


in layers of 150mm thick around foundations. CM 150 -

G Load and dispose surplus excavated material in


municipal dumping site distance not exceeding
3.00km away. ITEM

H Approved hardcore filling well compacted and


consolidated in layers of 150mm thick layer. CM 300 -

I 50mm thick approved murram blinding to surface


of hardcore. SM 150 -

J "Rentokil" or other equal and approved insecticide


treatment to murram surface. SM 300 -

Total Carried to Collection -


PROPOSED CHURCH BIULDING DEVELOPMENT

ITEM DESCRIPTION QTY UNIT RATE SHS


CONCRETE WORKS

Vibrated reinforced concrete (1:2:4)20mm


aggregate as described in:
A Column bases CM 900 -

B Foundation footing CM 350 -

C Column CM 1200 -

D 150mm thick ground floor slab SM 1200 -

Plain Concrete (1:4:8) as described in:


E 50mm thick blinding layer in column base SM 800 -

F Ditto in foundation footing SM 800 -

High tensile square twisted reinforcement bar


to B.S 4461 including cutting, bending hooks;
spacer blocks and binding wire:
G 25mm diameter bar KG 1000 -

H 16mm diameter bar KG 900 -

BRC MESH
I BRC mesh reinforcement No. 142 weighing 2.22kg
per square metres in concrete bed laid in one layer
(measured net allow for over lap) SM 350 -

Sawn formwork as described to:


J Vertical sides of foundation footing SM 120 -

K Vertical sides of column base SM 120 -

L Vertical edge of column SM 120 -

M Ditto but circular SM 150 -

N
Vertical edge of concrete floor slab 75-150mm high
LM 120 -

Total Carried to Collection -


PROPOSED CHURCH BIULDING DEVELOPMENT

ITEM DESCRIPTION QTY UNIT RATE SHS


WALLING

A 225mm thick quarry dressed natural natural stone


walling laid with and including (1:4) cement sand
mortar with and including hoop iron in every
second course. SM 1500 -

B 1000 gauge polythene damp proof membrane laid


in one layer. SM 150 -

C Allow for removal of water from excavations


including running water by pailing or otherwise Item

D Allow for strutting and planking around foundation


footing. Item

E
200mm wide Hessian bases bituminous felt damp
proof course bedded with cement sand (1:4) mortar
LM 120 -

F 15mm thick cement sand (1:6) rendering to plinth


area SM 235 -

G Prepare and apply three coats of bitumen to plinth


surface. SM 200 -

H 50mm thick precast concrete (1:2:4) paving slab


each size 600 x 600mm laid with (1:3) cement sand
mortar on and including 50mm thick bed of sand.
Including excavation and applting herbicide SM 1250 -

Carried to Collection -

COLLECTION
FROM PAGE /1 -
FROM PAGE /2 -
FROM ABOVE

TOTAL FOR ELEMENT NO. 1


SUBSTRUCTURES CARRIED TO
SUMMARY -
AMOUNT IN WORDS: